SASE1 Status and SASE3 Readiness
|
Joint Operation and Readiness Logbook, Contact: T.Haas, A. Violante, G. Wellenreuther |
Not logged in |
 |
|
Message ID: 428
Entry time: 04 Dec 2017, 10:56
|
Author: |
Tobias Haas |
Location: |
General |
Severity: |
Information |
Subject: |
Status after 0930 meeting |
|
|
General:
- User operation with good beam conditions over the weekend
- One interlock trip in the FXE branch in XTD9. Restored by CAS
- Shutdown starts tomorrow at 08:00.
- Next dispatch meeting takes place Wednesday at 13:00. A reminder will be sent.
Instruments
- SPB:
- Started with the actual sample during the night shift
- Some DAQ issues
- 108TB data was recorded
- Problems appear to occur between 01:00 and 02:00 and between 13:00 and 14:00
- FXE
- Running is ok.
- Temporal and spatial overlap with optical laser established
- Currently taking pump-probe data
- People on shift were uncertain about how to recover from interlock trip
- Statement from Vacuum: Pumps can restarted/valves open if the respective button in KARABO can be clicked
CAS:
- Delay between data taking and "online" analysis in the "Hummingbird" software is about 0.3s
ITDM
- On Friday, there was a global network outage affecting the Office Network on the DESY site.
- The transponder system in the experiment hall was down
- SRP organised a guard at the hall entrance so that the hall had not to be evacuated
- The control network (XDAC) was not affected
|