Entry time: 04 Sep 2017, 10:39
Reply to this: 376
|
Author: |
Tobias Haas |
Location: |
General |
Severity: |
Information |
Subject: |
Status after 0930 meeting |
|
|
SPB
- Demo experiment done last week
- Flat fields taken with AGIPD over the weekend
- Focus was re-characterised. This required modifications to several beam parameters and then led to a controversial discussion with the RunCoor
- The sluggish behaviour of the GUI remains an issue and might pose a real risk if the injector freezes up and direct reflections into the detector occur
- Kerstin and Gero looked at it last week
- John is back from holidays and will also look
- One observation is that the same information may update quickly on one server but not on another
- One motor is stuck in XTD9. A temporary access is requested
- On Sunday at beam hand over the CRL in XTD2 was not fully retracted. This was then done unannounced. Nothing bad happened this time but this might cause real damage.
FXE
- on shift and not represented at the meeting
- Harald mentions that 2 motors in the XTD2 CRL are stuck/in error. This should be fixed during this week's repair period
- Info by CB after the meeting: Scanned K_\beta and established machine energy scale within 40 eV
Tunnels
- Motion loop and SPB loop to be updated by AE tomorrow
- Tunnels and instruments are in different KARABO "Topics". K. Wrona states that this is a problem for DAQ
- SPB states that they have all information required already in their "Topic"
- It is unclear whether this might be an issue for FXE
CAS
|