SASE1 Status and SASE3 Readiness
|
Joint Operation and Readiness Logbook, Contact: T.Haas, A. Violante, G. Wellenreuther |
Not logged in |
 |
|
Message ID: 262
Entry time: 24 May 2017, 10:39
|
Author: |
Tobias Haas |
Location: |
General |
Severity: |
Information |
Subject: |
Status after 0930 meeting |
|
|
General:
- DESY will try to lase again at higher energies during the next days
- XTD9 will searched an interlocked this afternoon at 1400 as PCT will try to transport photons as far as possible
- Company Wille has started to work on the radiation interlocks in SASE1. New TÜV date on 20 June and rehearsal on 14 June
- Instruments should be prepared that on these days
XTDs:
- CAS (A. Parenti) is still working on the instability problem of the SR imager. For the moment the workaround with reduced resolution (mono-8) seems to acceptable
- One (non-existing) pump needs to be removed from interlock conditions in XTD9. Otherwise interlock blocks one gate valve
- Filter was taken off the pop-in in XTD2
- Tests for PBLMs still need to be done in XTD9 when it re-opens next week
FXE:
- Problems exist with vacuum controls. J. Tolkiehn is currently working on it
- Firmware of commissioning crate was upgraded
- Test of Johan Spectrometer was done with test crate
- CRL test are next
SPB:
- Still waiting for firmware for loops 1&2. AE is almost ready and will deploy today
- All cables are ready for Optics hutch
- AE is currently pushing in the crates
PLC:
- DESY MPS claims that a cable from the interlock to an AE crate is still missing.
- AE got vital information from MPS just a few days ago and is still waiting for info from the laser interlocks
KARABO:
- CAS is working on a version with bug fixes for stability. Will be deployed when appropriately test and when a break is available
- X2 timer interface still has issues. A. Sienzi is working on it
ITDM:
- An update of network switches is needed. This will be scheduled for next week. Details to be discussed during Monday 1500 BKR meeting
|