Technical integration and coordination SASE1 Status and SASE3 Readiness
  Joint Operation and Readiness Logbook, Contact: T.Haas, A. Violante, G. Wellenreuther  Not logged in ELOG logo
Entry   Status after 0930 meeting, posted by Tobias Haas on 04 Sep 2017, 10:39 
    Reply   Status after 0930 meeting, posted by Tobias Haas on 04 Sep 2017, 12:03 
Message ID: 376     Entry time: 04 Sep 2017, 12:03     In reply to: 375
Author: Tobias Haas 
Location: General 
Severity: Information 
Subject: Status after 0930 meeting 

Just to clarify:

  • Tunnel and SPB are in different Karabo Topics. It should not be a problem since we agreed that SPB does not need XTD2 slow data (from devices)
  • Tunnel and FXE are in the same Karabo Topic
  • We will keep prioritizing the configuration and deploy of Karabo-DAQ in SPB and FXE. Before going for Tunnel updates (we are mitigating risks of broadcast unknown issues just before the 1st User Experiments).  
Tobias Haas wrote:

SPB

  • Demo experiment done last week
  • Flat fields taken with AGIPD over the weekend
  • Focus was re-characterised. This required modifications to several beam parameters and then led to a controversial discussion with the RunCoor
  • The sluggish behaviour of the GUI remains an issue and might pose a real risk if the injector freezes up and direct reflections into the detector occur
    • Kerstin and Gero looked at it last week
    • John is back from holidays and will also look
    • One observation is that the same information may update quickly on one server but not on another
  • One motor is stuck in XTD9. A temporary access is requested
  • On Sunday at beam hand over the CRL in XTD2 was not fully retracted. This was then done unannounced. Nothing bad happened this time but  this might cause real damage. 

FXE

  • on shift and not represented at the meeting
  • Harald mentions that 2 motors in the XTD2 CRL are stuck/in error. This should be fixed during this week's repair period
  • Info by CB after the meeting: Scanned K_\beta and established machine energy scale within 40 eV

Tunnels

  • Motion loop and SPB loop to be updated by AE tomorrow
  • Tunnels and instruments are in different KARABO "Topics". K. Wrona states that this is a problem for DAQ
  • SPB states that they have all information required already in their "Topic"
  • It is unclear whether this might be an issue for FXE

CAS

  • No specific issue

 