SASE1 Status and SASE3 Readiness
Technical integration and coordination
Joint Operation and Readiness Logbook, Contact: T.Haas, A. Violante, G. Wellenreuther
Not logged in
List
|
Find
|
Login
|
Help
Message ID:
342
Entry time:
24 Jul 2017, 10:38
Author:
Adriano Violante
Location:
General
Severity:
Information
Subject:
Status after 9.30 Meeting
General
The latency observed by SPB in the GUI client has been almost completely fixed. Still some "freezing" from time to time remains.
DAQ tests in FXE with LPD worked for 12/16 of the detector. Trigger's signal stability issue being addressed by AE.
XTD 9 and 10 will remain open from 25.07. at 7:00 to 26.07. at 14:00
On Wednesday afternoon the machine will be prepare to lase with 30 bunches in order to allow the radiation measurements in SASE1 Exp. Hall on Thursday and Friday.
XTDs
Fast valve in XTD9 still has issues with noise. Issue will be addressed tomorrow with AE support.
SPB
Integration of the turbo pumps in the VAC loop ongoing.
Chiller control being included in Loop 5
Firmware for the AGIPD hv power supply was updated. The spikes during ramping are gone
SMARACT motors being implemented. (depend on Loop 13)
Work on in vacuum interlock in SPB will probably start this week.
Some problems with Karabo (While measuring profiles the level scaling does not work, Region of interest values wrong) have been reported to CAS.