Group Selection Page HELP DOC Controls Group Data Analysis Group ITDM WP76 DET Vacuum XRO EEE WP78 WP74 FXE SCS SPB MID HED SQS SXP Sample Environment Photon Commissioning Team Operation PSPO XO TS
Technical integration and coordination SASE1 Status and SASE3 Readiness
  Joint Operation and Readiness Logbook, Contact: T.Haas, A. Violante, G. Wellenreuther, Page 13 of 30  Not logged in ELOG logo
ID Datedown Author Location Severity Subject Text Attachments
  357   07 Aug 2017, 18:30 Eric BoydXHEXPInformationRadiaiton Measurements Complete for SASE 1Radiaiton Measurements are complete for
SASE 1 Normal access is restored.

 
  
  356   07 Aug 2017, 12:45 Monica ArestéGeneralInformationStatus after 9:30 disptach meetingGeneral



The Radiation measurement
test will be postponed until the beam reach
  
  355   04 Aug 2017, 15:24 Eric BoydXHEXPInformationTime Schedule change in Radiation Measurements for MondayDear All,

We have just changed the time that
the Radiation Protection Measurements will
  
  354   04 Aug 2017, 13:41 Eric BoydXHEXPInformationRadiation Measurements of FXE Monday 07.08The control room thinks that they will
be able to very easily provide us the desired
parameters for commissioning  the FXE
 Restricted_areas_for_FXE_EXP_measurments.pptx 
  353   03 Aug 2017, 10:52 Eric BoydXHEXPInformationNo Radiation Measurements in SASE 1 This weekDo to repairs that need to be made with
the cold compressor. We will be unable to
perform Radiation Hutch Commissioning for
  
  352   02 Aug 2017, 10:17 Monica ArestéGeneralInformationStatus after 9:30 dispatch MeetingGeneral



This Thursday the
radiation test in D.05 (FXE) will be performed
  
  351   31 Jul 2017, 11:58 Adriano ViolanteGeneralInformationStatus after 9.30 dispatch MeetingGeneral



SRP was not able
to measure any radiation even inside D.09
  
  350   30 Jul 2017, 23:04 Gerd WellenreutherGeneralInformationTunnel access schedule updatedDear all,

on Tuesday, XTD9 will be accessible
from 7:00 - 14:00, due to requests by Naresh
  
  349   28 Jul 2017, 11:50 Frederike WittmaackGeneralInformationStatus and plans after SASE 1/3 Readiness MeetingGeneral



The radiation test
in SASE1 could not take place yesterday since
  
  348   28 Jul 2017, 11:10 Eric BoydXHEXPInformationNo Restricted Areas for Radiation CommissioningDesired parameters where reached for radiation
measurments of the SPB OPT and SPB EXP hutches.
Radiaiton could not be detected inside the
  
  347   27 Jul 2017, 15:42 Eric BoydXHEXPInformationRestricted areas Durring Radiation Measurements of SASE 1, Friday 28.07No radiation measurements have taken place
today (27.07) due to insufficent energy of
the machine. We think we can achive the desired
 Restricted_areas_for_measurments.pptx 
  346   26 Jul 2017, 18:04 Martin DommachXTD9InformationFast valves in XTD9Dear all,

the problem with the fast valves
  
  345   26 Jul 2017, 14:10 Bernard BaranasicXHEXPInformationSPB - Loop 5 is back onlineSPB Loop 5 is back online:

- but without crate BKF00095-SPB_IRU_CHL
(there is missmatch of hardware and documentation
  
  344   26 Jul 2017, 10:35 Adriano ViolanteXHEXPInformationStatus after 9.30 MeetingGeneral


Today the machine is being
prepared to lase with 30 bunches in order
  
  343   25 Jul 2017, 13:26 Gerd WellenreutherGeneralInformationTunnel access schedule updatedDear all,

I had some minor updates of the
TAS during the last days, please check again.
  
  342   24 Jul 2017, 10:38 Adriano ViolanteGeneralInformationStatus after 9.30 MeetingGeneral


The latency observed by
SPB in the GUI client has been almost completely
  
  341   24 Jul 2017, 10:07 Frederike WittmaackGeneralInformationStatus and plans after SASE 1/3 Readiness MeetingGeneral (T. Tschentscher/G. Wellenreuther)


Further tuning of the machine
might require some time which was initially
  
  340   24 Jul 2017, 10:03 Gerd WellenreutherGeneralInformationTunnel access schedule updatedDear all,

access to XTD9 and XTD10 will be
available from tomorrow Tuesday the 25.7.
  
  339   20 Jul 2017, 15:19 Gerd WellenreutherGeneralInformationTunnel access schedule updatedDear all,

according to the current planning
on next Tuesday (25.7.) both XTD9 and XTD10
  
  338   19 Jul 2017, 10:11 Tobias HaasGeneralInformationStatus and Schedule after 09:30 meetingGeneral


The latency observed by
SPB in the GUI client could be reproduced
  
ELOG V3.1.4-7c3fd00