Notes XO Integration Meeting 10.05.2023, posted by Frederik Wolff-Fabris on 10 May 2023, 09:47
|
General Announcement:
-
|
Notes XO Integration Meeting 08.05.2023, posted by Frederik Wolff-Fabris on 08 May 2023, 09:53
|
General Announcement:
- As PRC Jan G. reports that:
1. ZZ access to XTD10 was planned and started around 9AM today to work on the exit slit. Plan is to finish by 12:30;
|
Notes XO Integration Meeting 03.05.2023, posted by Frederik Wolff-Fabris on 03 May 2023, 09:49
|
General Announcement:
- The current week is the first 16.3GeV week of this run in 2023.
- On the summer maintenance period: one list is still missing but is being mitigated. XO thanks for submitting lists on time.
|
Notes XO Integration Meeting 26.04.2023, posted by Frederik Wolff-Fabris on 26 Apr 2023, 09:46
|
General Announcement:
- Please remember Friday is the deadline to submit the summer maintenance task list.
- Performance conservation action at 7AM: reminder this takes place and BKR will call instruments to inform when they start with it. This action is transparent |
Notes XO Integration Meeting 24.04.2022, posted by Frederik Wolff-Fabris on 24 Apr 2023, 09:53
|
General Announcement:
- Two cryo events happened last week: one Friday morning 03:30AM and one on Saturday evening. Machine has fully recovered by now. First event was caused
by a ceramic bearing of the cold compressor.
|
Notes XO Integration meeting 18.04.2023, posted by Andreas Galler on 19 Apr 2023, 09:27
|
General Announcement:
CTRL:
nothing major
DA: |
Notes XO Integration meeting 17.04.2023, posted by Andreas Galler on 17 Apr 2023, 09:26
|
General Announcement:
CTRL:
nothing major
DA: |
Notes XO Integration meeting 12.04.2023, posted by Andreas Galler on 12 Apr 2023, 09:23
|
General Announcement:
CTRL:
not much to report
DA: |
Notes XO Integration Meeting 05.04.2022, posted by Frederik Wolff-Fabris on 05 Apr 2023, 09:47
|
General Announcement:
- Last week the template for the summer maintenance was send to the groups. In case of questions please contact M. Doering.
- UOM will not happen this Friday due to the holidays.
|
Notes XO Integration Meeting 03.04.2023, posted by Frederik Wolff-Fabris on 03 Apr 2023, 09:42
|
General Announcement:
-
|
Notes XO Integration Meeting 29.03.2023, posted by Frederik Wolff-Fabris on 29 Mar 2023, 10:02
|
General Announcement:
- M. Doering makes the quick-off presentation for the summer maintenance period:
1. Next Friday the list will be released to the groups and shall be returned on April 28th;
|
Notes XO Integration Meeting 27.03.2023, posted by Frederik Wolff-Fabris on 27 Mar 2023, 09:55
|
General Announcement:
- Next Wednesday the kick off presentation for the summer maintenance plan will take place at the XO Integration meeting done by Martin Doering. Please
invite colleagues from your groups who may be
|
Notes XO Integration Meeting 22.03.2023, posted by Frederik Wolff-Fabris on 22 Mar 2023, 11:00
|
General Announcement:
- A. Galler reminds on the conservation parameters action from accelerator which takes place every day at 7AM to recover conditions from day before or
prevent possible degradation of conditions.
|
Notes XO Integration Meeting 20.03.2023, posted by Frederik Wolff-Fabris on 20 Mar 2023, 09:43
|
General Announcement:
- An e-mail was sent to xo-info list about the pressurized air that is being serviced at XHEXP1. Some vacuum valves may close and please check for components
connected to pressurized air.
|
Notes XO Integration Meeting 15.03.2023, posted by Frederik Wolff-Fabris on 15 Mar 2023, 10:49
|
General Announcement:
- Tobias Clever informs on electrical works needed to connect XHO to electrical grid:
1. A new transformer will be connected to the new building on 03.April (a small chance of error can produce a minor power glitch as the ones frequently |
Notes XO Integration Meeting 13.03.2023, posted by Frederik Wolff-Fabris on 13 Mar 2023, 09:49
|
General Announcement:
-
|
Notes XO Integration Meeting 08.03.2023, posted by Frederik Wolff-Fabris on 08 Mar 2023, 09:48
|
General Announcement:
-
|
Notes XO Integration Meeting 06.03.2023, posted by Frederik Wolff-Fabris on 06 Mar 2023, 10:06
|
General Announcement:
- Operation this week consists in a Facility Development week. Many FDs are scheduled and if you plan any activity that may interfere in tunnels please
contact either XO or the PRC.
|
Notes XO Integration Meeting 01.03.2023, posted by Frederik Wolff-Fabris on 01 Mar 2023, 09:41
|
General Announcement:
-
|
Notes XO Integration Meeting 27.02.2023, posted by Frederik Wolff-Fabris on 27 Feb 2023, 09:48
|
General Announcement:
- Tobias Clever announces work in safety light installations at XHEXP1 taking place today: no disturbances shall happen and therefore no need to be alarmed.
|