Message ID: 478     Entry time: 18 Dec 2023, 10:13
Author: Frederik Wolff-Fabris 
Location: General 
Severity: Information 
Subject: Notes XO Integration Meeting 18.12.2023 
General Announcement:
-	 

CTRL:
- Fix for the datalogger issue that was experienced after the deployment is created. To be applied tomorrow at 11:30. Very limited impact; only few mins downtime. An e-mail will be sent.
- Current issue with the laser pattern device: DOOCS colleagues are involved to investigate.

DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- Nothing to report.

XPD:
- DOOCS was not reachable and VAC loops had to be restarted (last week). All fine now.

DET:
- Nothing to report.

ITDM: 
- Info to instruments: close proposals for cleaning. Please look at a sent e-mail; SA1 instruments will have a new device installed so they have a longer deadline.
- Incident in balcony room with water leak: fixed on Friday.
- Delays for fast switch in SA2: finally done on Friday and shall be operational. Final checks to be done until Christmas.
- Incident with rack room (604): sensors were broken and temperature was raising. By 4-5AM on-site intervention. System is down but cooling started to work again.

XRO:
- Finished commissioning of exit slit in XTD10 (SQS/SXP) and operation tests to be done in January.

LAS:
- Issue with laser pattern (mentioned above in CTRL).
- Issue that brought down laser on Wed/Thu: to be followed up. 

UNSYS:
- PKGs were removed from tunnels.
- Apple-X: all 4 devices are installed and wired. Commissioning of electronic parts ongoing; checking limit switches.
- Tomorrow morning alignment to be done and after the vacuum system will be closed and prepared for operation.

SPB:
- Not present.

FXE:
- Nothing to report.

MID:
- All fine at MID.

HED:
- Nothing to report.

SCS:
- Nothing to report.

SQS:
- Nothing to report.

SXP:
- Not present.