Group Selection Page HELP DOC Controls Group Data Analysis Group ITDM WP76 DET Vacuum XRO EEE WP78 WP74 FXE SCS SPB MID HED SQS SXP Sample Environment Photon Commissioning Team Operation PSPO XO TS
Technical integration and coordination SASE1 Status and SASE3 Readiness
  Technical integration and coordination logbook, Contact: A. Violante, G. Wellenreuther  Not logged in ELOG logo
Message ID: 478     Entry time: 18 Dec 2023, 10:13
Author: Frederik Wolff-Fabris 
Location: General 
Severity: Information 
Subject: Notes XO Integration Meeting 18.12.2023 
General Announcement:
-	 

CTRL:
- Fix for the datalogger issue that was experienced after the deployment is created. To be applied tomorrow at 11:30. Very limited impact; only few mins downtime. An e-mail will be sent.
- Current issue with the laser pattern device: DOOCS colleagues are involved to investigate.

DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- Nothing to report.

XPD:
- DOOCS was not reachable and VAC loops had to be restarted (last week). All fine now.

DET:
- Nothing to report.

ITDM: 
- Info to instruments: close proposals for cleaning. Please look at a sent e-mail; SA1 instruments will have a new device installed so they have a longer deadline.
- Incident in balcony room with water leak: fixed on Friday.
- Delays for fast switch in SA2: finally done on Friday and shall be operational. Final checks to be done until Christmas.
- Incident with rack room (604): sensors were broken and temperature was raising. By 4-5AM on-site intervention. System is down but cooling started to work again.

XRO:
- Finished commissioning of exit slit in XTD10 (SQS/SXP) and operation tests to be done in January.

LAS:
- Issue with laser pattern (mentioned above in CTRL).
- Issue that brought down laser on Wed/Thu: to be followed up. 

UNSYS:
- PKGs were removed from tunnels.
- Apple-X: all 4 devices are installed and wired. Commissioning of electronic parts ongoing; checking limit switches.
- Tomorrow morning alignment to be done and after the vacuum system will be closed and prepared for operation.

SPB:
- Not present.

FXE:
- Nothing to report.

MID:
- All fine at MID.

HED:
- Nothing to report.

SCS:
- Nothing to report.

SQS:
- Nothing to report.

SXP:
- Not present.
ELOG V3.1.4-7c3fd00