Technical integration and coordination SASE1 Status and SASE3 Readiness
  Technical integration and coordination logbook, Contact: A. Violante, G. Wellenreuther  Not logged in ELOG logo
Message ID: 496     Entry time: 06 Mar 2024, 10:12
Author: Frederik Wolff-Fabris 
Location: General 
Severity: Information 
Subject: Notes XO Integration Meeting 06.03.2024 
General Announcement:
- This is a facility development week and on Friday's UOM we will get reports on recent weeks' jitter observations from the instruments. 

CTRL:
- Nothing to report.

DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- Clean tent is moved from XTD10 to XTD2 for XFELO activities on the summer maintenance period.

XPD:
- Nothing to report.

DET:
- Nothing to report.

ITDM: 
- E-mail was sent to xo-info on the intervention of migration THU morning for about an hour.

XRO:
- SA1 ATT watchdog presenting typos and acting with the wrong bunch number: Mikako M. reports the same (copied) watchdogs in other SASEs do not show this error and the SA1 is now fixed. 
Origin for the error in SA1 is not understood and difficult to find.
- All Attenuators in SA1 were moved 1mm up to help reaching an area without damage.

LAS:
- AMPHOS shutter issue over the weekend: the ad-hoc procedure is no longer in place and the issue is fixed.

UNSYS:
- Motor and electronics in PS SA3/cell12 were exchanged yesterday. 

SPB:
- Nothing to report.

FXE:
- Nothing to report.

MID:
- Not present.

HED:
- Nothing to report.

SCS:
- Girder system showed an electronic problem that requires hardware change; discussed with Sylvia and E-planners.

SQS:
- Not present.

SXP:
- Not present.