Technical integration and coordination SASE1 Status and SASE3 Readiness
  Technical integration and coordination logbook, Contact: A. Violante, G. Wellenreuther  Not logged in ELOG logo
Message ID: 482     Entry time: 15 Jan 2024, 10:52
Author: Frederik Wolff-Fabris 
Location: General 
Severity: Information 
Subject: Notes XO Integration Meeting 15.01.2024 
General Announcement:
- Interlock tests light: functional tests will happen this Wednesday starting at 09:00 at the instruments. Emergency OFF will not be pressed.

CTRL:
- Updates are working and going well;
- Experiencing issue with DOOCS devices since Friday. Reported to DOOCS team and needs to roll it up.
- Weekend: issue with SA2 topic: MPP broker had one post that lost connectivity to Karabo (LAS2). Middle layer devices successfully connected and easiest solution was to restart these two topics. 
Done between DRC and PRC. Macros or calibration services were not started yet.

DA:
- Nothing to report.

EEE:
- Friday evening OCD call with VAC.
- Bring up day at FXE went fine.

VAC:
- Problems: false alarm that were cleared out on Sunday and is normal now.
- Continuing some maintenance tasks.

XPD:
- Starting Diagnostic devices this week. From weekend SASE tuning is planned.

DET:
- Nothing to report.

ITDM: 
- Investigating broker in SA2.

XRO:
- Not present.

LAS:
- Not present.

UNSYS:
- Small problem in SA1 / cell28: power distribution terminal must be replaced by ZZ.

SPB:
- Nothing to report.

FXE:
- Nothing to report.

MID:
- All fine at MID.

HED:
- Nothing to report.

SCS:
- Bring up days starting today at SCS.

SQS:
- Not present.

SXP:
- Nothing to report.