Group Selection Page HELP DOC Controls Group Data Analysis Group ITDM WP76 DET Vacuum XRO EEE WP78 WP74 FXE SCS SPB MID HED SQS SXP Sample Environment Photon Commissioning Team Operation PSPO XO TS
Technical integration and coordination SASE1 Status and SASE3 Readiness
  Technical integration and coordination logbook, Contact: A. Violante, G. Wellenreuther, Page 8 of 29  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
ID Date Author Location Severity Subject Text Attachments
  437   24 Jul 2023, 09:49 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 24.07.2023General Announcement:
- Machine still works in improving performance.
News will be posted at xo-info.
  
  436   19 Jul 2023, 10:25 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 19.07.2023General Announcement:
- SEPS interlock tests are done in SA1 and
SA2. It continues tomorrow in SA3 during
  
  435   17 Jul 2023, 09:53 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 17.07.2023General Announcement:
- SEPS interlock tests are taking place today.
An e-mail was sent to xo-info last Friday
  
  434   12 Jul 2023, 10:18 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 12.07.2023General Announcement:
- There were two power glitches last night
observed at Desy which switched OFF some
  
  433   10 Jul 2023, 09:30 Andreas GallerGeneralInformationNotes XO Integration meeting 10.0723
General Announcement:


CTRL:
-
Bring Up Days start next Monday

DA:
-
DA and DET sessions are alwys the same days
  
  432   05 Jul 2023, 09:53 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 05.07.2023General Announcement:
- Interlock tests are ongoing up to 12.07
(instruments area) and from 13.07 the accelerator
  
  431   03 Jul 2023, 09:58 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 03.07.2023General Announcement:
- Power glitch happened on Friday morning:
emergency power off was triggered in SA2
  
  430   28 Jun 2023, 10:22 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 28.06.2023General Announcement:
- PKG maintenance in SA1-2-3 areas (XHEXP1)
is to take place today and fluctuations of
  
  429   26 Jun 2023, 09:40 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 31.05.2023General Announcement:
- Tobias Clever mentions that the tasks for
the UPS repair is cancelled for the summer
  
  428   21 Jun 2023, 11:42 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 21.06.2023General Announcement:
- Tobias Clever informs on the UPS repair
for SA2 and SA3 areas in the XHEXP1. A new
  
  427   19 Jun 2023, 10:08 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 19.06.2023General Announcement:
- Today is the last day with photon beam
operation for the ramp down activities from
  
  426   14 Jun 2023, 09:43 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 14.06.2023General Announcement:
- This is the last XO integration meeting
during X-ray operations week. In case of
  
  425   12 Jun 2023, 10:03 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 12.06.2023General Announcement:
-  
  
  424   07 Jun 2023, 10:35 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 07.06.2023General Announcement:
- As PRC, Jan G. says that overall the start
on Monday was difficult but no major issues
  
  423   05 Jun 2023, 09:44 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 05.06.2023General Announcement:
-  
  
  422   31 May 2023, 09:47 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 31.05.2023General Announcement:
- The Maintenance tasks list was released
yesterday evening. If you did not receive
  
  421   24 May 2023, 09:50 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 24.05.2023General Announcement:
-  
  
  420   22 May 2023, 10:00 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 22.05.2023General Announcement:
-  
  
  419   17 May 2023, 09:40 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 17.05.2023General Announcement:
- Change in 2024 schedule: for next year
the setup days is shifted from Mondays to
  
  418   15 May 2023, 09:51 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 15.05.2023General Announcement:
- There are different infrastructures among
the instruments regarding liquid nitrogen.
  
ELOG V3.1.4-7c3fd00