Group Selection Page HELP DOC Controls Group Data Analysis Group ITDM WP76 DET Vacuum XRO EEE WP78 WP74 FXE SCS SPB MID HED SQS SXP Sample Environment Photon Commissioning Team Operation PSPO XO TS
Technical integration and coordination SASE1 Status and SASE3 Readiness
  Technical integration and coordination logbook, Contact: A. Violante, G. Wellenreuther  Not logged in ELOG logo
Message ID: 517     Entry time: 29 May 2024, 09:45
Author: Frederik Wolff-Fabris 
Location: General 
Severity: Information 
Subject: Notes XO Integration Meeting 29.05.2024 
General Announcement:
-	 

CTRL:
- Nothing to report.

DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- Nothing to report.

XPD:
- Nothing to report.

DET:
- Nothing to report.
- Silicon oil leak in DET lab: team was investigating and seems to be fixed by now. It is particular to this lab installation and is not similar to the ones in the instruments.

ITDM: 
- Rack move in E.0: rack has been moved to final position. Related components also moved; at the moment coordinating with room managers to make inside installations. All going smoothly and accordingly to 
the plan.

XRO:
- Not present.

LAS:
- Issue with timing jumps by SQS: debug has been done with EEE and Sync groups. Front end was changed yesterday but did not solved. 
The uTCA slave card (in the PP-laser rack) was drifting and this card was also changed last evening. There is less jitter and issue seems to be solved now.

UNSYS:
- Nothing to report.

SPB:
- Preparing beamline for next user.

FXE:
- Nothing to report.

MID:
- All fine at MID.

HED:
- Not present.

SCS:
- Nothing to report.

SQS:
- Issues from the weekend: 1. interlock hutch door contact broken; 2. Misunderstanding on tuning for SA1 without notifying SQS members. 
- A. Galler comments that the tuning was discussed with instruments and likely another shift crew in the instruments were knowing the tuning operation and this information was not passed to all member of 
SQS.

SXP:
- Not present.
ELOG V3.1.4-7c3fd00