Group Selection Page HELP DOC Controls Group Data Analysis Group ITDM WP76 DET Vacuum XRO EEE WP78 WP74 FXE SCS SPB MID HED SQS SXP Sample Environment Photon Commissioning Team Operation PSPO XO TS
Technical integration and coordination SASE1 Status and SASE3 Readiness
  Technical integration and coordination logbook, Contact: A. Violante, G. Wellenreuther, Page 29 of 29  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
ID Date Authordown Location Severity Subject Text Attachments
  85   13 Nov 2019, 10:12 Adriano ViolanteGeneralInformationStatus report after tech. Int. Meeting 9.30​FXE


Radiation tests ongoing.
EEE
informs that the PLC drawings will be exchanged
  
  86   20 Nov 2019, 10:12 Adriano ViolanteGeneralInformationMinutes of the Technical integration meeting 20.11.19 ​FXE


Wille was asked by D3
to pull new cables for the Pandora in FXE
  
  89   04 Dec 2019, 14:18 Adriano ViolanteGeneralInformationSummary of the technical integration meetingFXE


No major issues - PLCs
update has been started by EEE (BB)


SCS
  
  90   09 Dec 2019, 09:22 Adriano ViolanteGeneralInformationReport after dispatch meeting 09.00FXE:


No major issues.
Karabo
will be updated to the version 2.7.0. on
  
  91   11 Dec 2019, 09:54 Adriano ViolanteGeneralInformationReport after Tech. Int. meeting 09.30 FXE:


New optical table will
be installed today. Access to the hutch could
  
  92   16 Dec 2019, 09:28 Adriano ViolanteGeneralInformationReport after dispatch meeting 09.00FXE:


uTCA update has been completed
by EEE on Friday evening. Information
  
  93   18 Dec 2019, 10:06 Adriano ViolanteGeneralInformationReport after tech. Int. meeting 09.30MID:


SDL tests ongoing. Important
motors have been tested. Alignment of the
  
  94   08 Jan 2020, 12:36 Adriano ViolanteGeneralInformationReport of the Technical integration meeting SPB:


Coordinatd motion for MC2
motors is going to be rolled out by EEE soon.


FXE:
  
ELOG V3.1.4-7c3fd00