  598   24 Mar 2025, 09:42 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 24.03.2025
General Announcement:
- A. Galler informs that on Friday there is the LIMP meeting organized by Martin Doering. Please contact him in case of questions. Information will be transmitted to people who does not attend it.
- As PRC, A. Galler mentions the SXP laser shutter issue happened on Saturday (see SXP). 
- As DRC, David Lomidze informs it was a quiet week.

CTRL:
- Nothing to report.

DA:
- Not present.

EEE:
- Issue with CRL lenses in XTD2 with a stuck motor. A ZZ is needed tomorrow if possible to fix it.

VAC:
- Nothing to report.

XPD:
- Nothing to report.

DET:
- Nothing to report.

ITDM: 
- Problems with GPFS system still in investigation.

XRO:
- Nothing to report.

LAS:
- Not present.

UNSYS:
- Nothing to report.

SPB:
- Nothing to report.

FXE:
- Data were collected; CRL got stuck.
- Pulse energy decreased ~20% every day and recovered in the morning; Also when SA2 changed number of pulses.
- uTCA crate crashed and a ticket is sent to EEE, together with DOC being called.

MID:
- Nothing to report.

HED:
- Not present.

SCS:
- Nothing to report.

SQS:
- Not present.

SXP:
- Saturday problem with Laser interlock related to AMPHOS shutter. A quick fix was found by PRC and Pouneh S.
- Responsibility for AMPHOS shutter will be discussed with LAS.
  599   26 Mar 2025, 09:43 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 26.03.2024
General Announcement:
- A. Galler reminds on the LIMP-2025 meeting taking place next Friday. If any group misses an invitation, please contact Martin Doering. 
XO expects that the information distributed on Friday will be shared between the group by the present representative.

CTRL:
- Nothing to report.

DA:
- Not present.

EEE:
- Nothing to report.

VAC:
- Nothing to report.
- GATT/SA3 returned to normal operation after last week with gas exchange.

XPD:
- Nothing to report.

DET:
- Nothing to report.

ITDM: 
- Nothing to report.
- Gateway issue just happened and may need a reboot after investigation.

XRO:
- A ZZ in XTD2 happened to CRL accumulated problems. It found one encoder is finally dead. 
It was communicated to instruments that arm#2 vertical motion is in open loop as does not have an encoder reading. Realignment is needed as position is lost. Operation can continue and replacement of part 
will be organized.

LAS:
- Can not access the gateway; ongoing fix with ITDM.
- SA1 PP-laser is down due to AMPHOS computer down.
- A. Galler enquires on responsibility for the AMPHOS shutter safety; clarification between LAS and SRP has to be done.
- SA3 ADC PP-laser missing values: understood by LAS and EEE; issue with settings of number of pulses. An update will be done to permit pulses higher than 800.

UNSYS:
- Nothing to report.

SPB:
- Nothing to report.

FXE:
- Nothing to report.

MID:
- Nothing to report.

HED:
- Nothing to report.

SCS:
- Nothing to report.

SQS:
- Nothing to report.

SXP:
- Not present.
  600   31 Mar 2025, 09:36 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 31.03.2025
General Announcement:
-	 

CTRL:
- Announcement: tomorrow around 10AM an upgrade of dataloggers will take place (to version Karabo 2.20.10) due to issues with data aggregator causing dataloggers to crash. E-mail to xo-info will be sent.

DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- Nothing to report.

XPD:
- Nothing to report.

DET:
- Nothing to report.

ITDM: 
- Nothing to report.

XRO:
- Not present.

LAS:
- Not present.

UNSYS:
- Nothing to report; all fine.

SPB:
- Nothing to report.

FXE:
- Problem with encoder happened on Saturday evening, it was reported to EEE; It does not look like a showstopper.

MID:
- Nothing to report.

HED:
- Nothing to report.

SCS:
- Nothing to report.

SQS:
- Nothing to report.

SXP:
- Not present.
  601   02 Apr 2025, 10:31 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 02.04.2025
General Announcement:
- A. Galler reminds instruments that enquiring and requests on beam parameters shall come prior the respective RC meeting. Otherwise it will be difficult to accommodate last minute 
changes.

CTRL:
- Performed update of dataloggers yesterday.

DA:
- All fine with DA.

EEE:
- Nothing to report.

VAC:
- Issue with broken power supply in SA3 on Monday 2PM. Downtime of 2 hs and it was fixed by exchanging it in a ZZ.

XPD:
- Nothing to report.

DET:
- Nothing to report.

ITDM: 
- Nothing to report.

XRO:
- Not present.

LAS:
- Laser system working;
- Last Thursday evening decisions were done that incurred effects on PP-laser and access. An e-mail to XO will be sent with details.

UNSYS:
- Everything is fine.

SPB:
- Nothing to report.

FXE:
- Reported motor issues are fixed.

MID:
- Nothing to report.

HED:
- Not present.

SCS:
- Nothing to report; busy preparing DSSC2 setup. 

SQS:
- Nothing to report; ready for beam.

SXP:
- Not present.
  602   07 Apr 2025, 09:42 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 07.04.2025
General Announcement:
- Reminder from A. Galler: please use the Operations e-log to report issues or comments instruments may have.

CTRL:
- Nothing to report.

DA:
- Nothing to report.

EEE:
- P. Gessler informs in activity organized by Desy: 10Hz synchronization signal has to be synchronized to the 50Hz of the power work. 
A measurement campaign will happen on 17.June without the sync with the 50Hz. There is the possibility to run this day for tests. 
A meeting on 06.June will take place; please contact Patrick Gessler to be included in the preparation meeting. 
It does not affect normal users and is intended to evaluate possible drifts.

VAC:
- Having a group retreat.

XPD:
- Nothing to report.

DET:
- Nothing to report. Jola S.-D. will discuss with Patrick G. on the 50Hz sync tests.

ITDM: 
- Nothing to report.

XRO:
- Nothing major to report.

LAS:
- Various issues with 1. interlock failing; 2. reset timing; 3. water leakage at sub-sync hutch.

UNSYS:
- Everything is fine.

SPB:
- Nothing to report.

FXE:
- Nothing to report.

MID:
- All fine at MID.

HED:
- Lbsync was down over the weekend.
- Bucket jumps on the PP-laser: needs to be readjusted delay time between PP-laser and FEL. Daniel K. says a call to OCD will help to set it up. Probably due to Lbsync issues.

SCS:
- Not available.

SQS:
- Not present.

SXP:
- Preparing the experiment for this week.
  603   09 Apr 2025, 10:07 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 09.04.2025
General Announcement:
-	 

CTRL:
- Nothing major to report.

DA:
- Nothing to report.

EEE:
- Issue early morning with SPB PLC server which stopped communicating. It has recovered, if it happens again please contact EEE.

VAC:
- Nothing to report.
- Nerea J. comments in SA1 Si attenuator: a ZZ seems to be needed; A. Trapp says XRO is not involved so far; Chan K. says that SPB is fine with the current situation and thus the ZZ can be postponed.

XPD:
- Nothing to report.
- As PRC, J. Gruenert says all is fine and has also no information on the ZZ for SA1 attenuator.

DET:
- Nothing to report.

ITDM: 
- Info for following week: 
1. Maxwell cluster maintenance next Wednesday between 10:00-11:00 (e-mail to be sent); 
2. Additional investigation on the GPFS performance will also be performed next week 15.04 (e-mail also to be sent).

XRO:
- Nothing to report.

LAS:
- Nothing to report.

UNSYS:
- Problem with SA3 cell 26: bottom shifter driver was stuck. Attempt to recovered via remote failed; a ZZ is mandatory to power cycle (next possible action for a fix).

SPB:
- Everything on PLC and Attenuator already discussed. Own SPB attenuators are in use.

FXE:
- Nothing to report.

MID:
- Continue measurements with FD activity until next Thursday.

HED:
- Nothing to report.

SCS:
- Preparing the DSSC2 tests taking place next week. A special electrical setup is in place at the hutch which needs a special training to allow access into the hutch. Warning signs will be placed.

SQS:
- Not present.

SXP:
- Not present.
  182   30 Nov 2020, 09:15 Arvid GebhardtGeneralInformationNotes XO Integration Meeting 30.11.2020

General Announcement:

- /

CTRL:

- Karabo 2.10 FXE was sucessful.

- go on with SPB and go on with other instruments. On Thurthday 3rd all SASE3 topics.

- Connenting Gui clients, if gateway there is no need to write a tiket this week. If local installation, please make an update.

- network upgrade takes place at SASE1 tomorrow. Karabo will be updated later.

DA:

- /

EEE:

- MircoTCA updates today and on going. Timing won´t be avaliable for short period.

VAC:

- /

XPD:

- /

DET:

- /

ITDM:

- Tomorrow network update SASE1, but there no Karbo update.

- at the beginning of January DESY-IT will do some work on data center / maxwell clust. interuptions are expected. Schedule is still be to expacted.

XRO:

- Not present.

LAS:

- Tests on the mircoTCA failt. More tests needs to be done.

- LAS request comunication from instruments go thru XO.

UNSYS:

- Not present.

SPB:

- Aigipd intervention is running well. To be tested by the end of this week.

FXE:

- cable installation on going.

MID:

- all fine

HED:

- /

SCS:

- Not present.

SQS:

- /

  186   14 Dec 2020, 09:00 Arvid GebhardtGeneralInformationNotes XO Integration Meeting 14.12.2020

General Announcement:

- Please write to xo.planning, if something comes up with intteruption of the maintenance due to new COVID-19 regulations.

CTRL:

- Migration of Beckhoff MC2 motors at SA3.

- Checking operation (e.g. soft mono at SA3).

- Final checks together with EEE.

DA:

- nothing to report

EEE:

- Migration at SA3 MC2 PLC´s.

- Fast ADC: SA2 maintenance starts.

- Cabling to be done in SQS today and tomorrow at HED.

- Crate was sent to Poland and shall arrive this week.

VAC:

- not present.

XPD:

- problem / alarm XGM at SASE1 / XTD2  - Needs to re-cable and install new gauges; requires VAC group.

- PES was re-installed in XTD10 and has been pumped down.

- DAQ test on friday - things are fine.

- XTD6 XGM alignment starts today - used to be confirmed with VAC.

DET:

- AGIPD intervention: need some internal coordination also with DASY groups - it will let XO know, if support needed

ITDM:

- XFEL gateway next Monday

- pre-anouncement: 90% of maxwell cluster update to be done on January 4/5. Communication to be send to Readiness mailing list.

XRO:

- Testing Controls in tunnel devices - needs to fix SA3 expected bugs.

- XTD10 close the vaccuum for M6 mirror chamber this week.

- XTD6 some problems with M3 mirror: to be pumped down this week and checked start of January.

LAS:

- Small delay on works at SA3, but no risk for users.

- Question from LAS: is the SA1 laser interlock update takes place?

- SA2 AMPHOS: external company is coming today

UNSYS:

- not present

SPB:

- nothing to report

FXE:

- nothing to report

MID:

- all fine

HED:

- don´t have anything

SCS:

- nothing to report

SQS:

- nothing to report

  187   16 Dec 2020, 09:11 Arvid GebhardtGeneralInformationNotes XO Integration Meeting 16.12.2020

General Announcement:

- Today is the last xo-integration meeting for this year. Xo wants to thank everyone for the participating in this meeting series while sharing information and giving updates.

- The next XO Int. Meeting will happen on 04 January.

CTRL:

- Beckhoff MC2 motor upgrades at SA3 is ongoing.

DA:

- no updates

EEE:

- all SA2 fast ADC tasks have been concluded.

- Cabling in HED is ongoing; On MID will happen next year.

- AIBS control at SA1 balcony room installation starts today.

- Testing Mc2 motor configurations in tunnel devices.

VAC:

- Trying to finish main shutdown tasks: GATT, new mirror chamber in SA3/SXP, SA2 M3 mirror chamber.

- M3 chamber InGa is clean and ready to be pumped down.

- XGM/SA1: broken gate will be replaced this week or next.

- Some members of VAC group are working on site next week.

XPD:

- XGM SA2/XTD6 was moved 4mm and is still in alignment (no damage found) -> Jan G and Harald S. will have a look today onsite. M. Dommach says the differential pump could not move that far away due to bellows. 

- Installing of switches for HRIX will be most likely finished this month and some maybe in January.

DET:

- nothing to report.

ITDM:

- nothing today.

XRO:

- Not present.

LAS:

- Laser Hutches are locked (no access allowed) by Safety and LAS members can not continue the work in laser rooms. LAS maintenance tasks can not be finished and may be delayed over the end of shutdown.

- Emission of SASE2 Seeder laser was put in OFF yesterday due to inspection by SLSO. This means laser was OFF and there is no guarantee the PP-laser will be available in February, as they will not start mode-locking again after an Emission OFF. 

- Typically the Seeder lifetime is 3-4 years. Each time it is switched OFF it shortens the lifetime by half. If Seeder is included in the Interlock system, and taking into account the interlock trips 1 time per week or month (case of SASE3), the availability of PP-lasers is in risk and consequently the whole operation for instruments.

- Alignment lasers will be no longer provided. This also relates to the safety decision - such lasers are not allowed to be operated.

UNSYS:

- not present.

SPB:

- nothing to report: quiet days.

FXE:

- Craning activities over the hutches due to SXP construction still ongoing: not always a notice from construction workers.

MID:

- all fine.

HED:

- nothing to report.

SCS:

- not present.

SQS:

- nothing to report

  188   06 Jan 2021, 09:05 Arvid GebhardtGeneralInformationNotes XO Integration Meeting 06.01.2021

General Announcement:

  • Due to work restrictions, some of shutdown activities will not end as planned in time. This leads to a prolongation of the start-up phase starting next week. It means re-start of Accelerator and South branch will be delayed by 2-4 days while the North branch by about 1 week.
  • The first 2 weeks of X-Ray delivery (2.2-15.2) will most likely be affected and photon delivery cannot be guaranteed into all beam-lines at all days. Some flexibility in planning for the commissioning tasks is expected. A detailed schedule for an upcoming week will be available on the week before, latest on Friday.
  • Sara C. asks if tunnel access is allowed during this week. F. Wolff-Fabris understands tunnels still can be accessed this week apart of Covid regulations (in the context of tunnel maintenance tasks that have to be performed while tunnels are open). T. Tschentscher says the understanding is from Robert F. guidelines e-mail are still valid for this week and really important tasks may be conducted – an e-mail to Robert and Nicole pointing the task with the need of access could be sent. Steve A. reported from today’s Covid taskforce meeting that the regulations of last corona email are still valid - if there are any question send an email to health@xfel.eu.

CTRL:

- Due to incompatibility discovered after last update on Dec. 23rd, CTRL would like to update files on all microTCAs before user operation (Karabo devices) mostly likely next Friday.

- A network maintenance was performed by Desy. Please inform CTRL if issues are encountered.

DA:

- nothing to report

EEE:

- Preparing to finish the cabling in HED and MID.

- Nothing to report from PLC side.

VAC:

- nothing to report - tunnel update tomorrow

XPD:

- XPD OCD put in place during Christmas break had no emergencies calls.

- XPD expect earliest work to take place on next week.

DET:

- nothing to report

ITDM:

- Desy network team would like to do a update of the control network routers tomorrow at 1300 -> email comes to readiness

XRO:

- Proceeding with activities from last days of last year.

- No major updates. Testing the SA3 MC2 library update.

LAS:

- Lasers are down.

- SA2 seeder that took longer than expected time to be back in December after the OFF request by LSO. Probably on next OFF mode LAS has to exchange it.

UNSYS:

- Minimum gaps for SASE3 Undulator system is 10mm. Other SASEs shall be defined after the middle plan scans.

- Apple-X major work from Unsys is done.  

- Quad movers are working remotely.

- Remaining task: connecting fire extinguisher system in one rack.

SPB:

- nothing to report

FXE:

- nothing to add

MID:

- nothing to report

HED:

- nothing to report

SCS:

- not present

SQS:

- A High voltage power supply with double-polarity was installed. It is the first time this is installed at SQS.

  193   25 Jan 2021, 09:28 Arvid GebhardtGeneralInformationNotes XO Integration Meeting 25.01.2021

General Announcement:

- Test of automatic switch of power bridge is shifted to Feb.2: this affects all devices connected to orange or green power sockets (no power for few seconds/minute). General e-mail will be sent. Instruments will need to care for equipment which is connected to these sockets. This also affects the E0 level as well as office space in XHQ. Pease plug devices out or re-plug in other sockets.

  • The Covid-19 regulations continue valid. Only critical work in the XHEXP1 or tunnel activities shall take place.

- Work on the Soft Mono in XTD10 (SA3) takes place this week. XRO and ME asks everybody to do not move any motors in this device during the whole week.

CTRL:

- New Script to fix label issues in Karabo is ready and will be run today. An e-mail will be sent.

- ITDM and CTRL managed to get updated the “Read the docs”. It runs properly.

DA:

- Not present due to Satellite Workshop.

EEE:

- nothing to report

VAC:

- continuing with tunnel works

XPD:

- Ongoning with few tasks in the tunnel

DET:

- Not present

ITDM:

- nothing to report. Offline GPFS under work today: no Maxwell access during this time.

XRO:

- Not present. Please see general announcements on the Soft Mono.

LAS:

- Error with remote operation on mirrors for SA3/SQS PP-laser is found. A discussion after the meeting will take place between LAS and XO.

UNSYS:

- Nothing to report

SPB:

- Nothing to report

FXE:

- Nothing to add

MID:

- all fine

HED:

- Nothing to report

SCS:

- Nothing to report

SQS:

- Nothing to report

  194   27 Jan 2021, 09:08 Arvid GebhardtGeneralInformationNotes XO Integration Meeting 27.01.2021

General Announcement:

- FFP2-Masks needs to be used in the experiment control hutches from now on regardless the number of people working in this areas. Regulations concerning the maximum number of staff in this areas remain the same.

- SASE1 Laser interlock upgrade originally scheduled for this week was postponed to next week. As soon as we receive the information on the new date, this will be communicated.

CTRL:

-   Intervention for the new scenes for the size of the labels was originally scheduled for yesterday. This was postponed as additional tests will be conducted in CTRL lab. A new date will be announced. 

- Panel topics: some old types doocs undulator devices were replaced for a single device. CTRL would like to remove the old ones in 2-3 weeks and kindly ask groups to inform if they are still in use. CTRL will send an e-mail on this subject.

DA:

- Nothing special to report.

EEE:

- Nothing special to report.

VAC:

- Still working in XTD10 and XTD6.

XPD:

- Tunnel works ongoing in XTD6 and XTD9, e.g. Shimadzu cameras / Imagers.

- EEE will need to have access at the end of the Imager intervention of XTD6.

DET:

- SPB Agipd: issues with new data acquisition system. It has been under work.

- This week DET plans to test the new Control fix medium gain to be used in user experiments.

ITDM:

- Nothing special to report.

XRO:

- Not present.

LAS:

- After SASE2 AMPHOS update: there are issues with the interlock

UNSYS:

- Unfortunately neither Desy or EuXFEL could grant access to the external company for the XTD4 tunnel cleaning. UNSYS is trying to organize themselves. PKG shall not be switched on before the clean is done.

SPB:

- Tests with DAQ of the AGIPD: new version has issues with data assignment of aggregated version. Currently AGIPD is back in the old version.

- Work of EEE with some crates of rack room.

FXE:

- Nothing special to report.

MID:

- all fine

HED:

- Nothing special to report.

SCS:

- Nothing special to report.

SQS:

- nothing to say

  195   01 Feb 2021, 09:06 Arvid GebhardtGeneralInformationNotes XO Integration Meeting 01.02.2021

General Announcement:

- The test of the emergency automatic switch of power bridge is scheduled for Tuesday, 2nd of February 2021, 09:00. This will affect orange outlets in XHQ and green and orange outlets in XHEXP1. A short interruption in the power supply lines will happen. We expect all groups have taken appropriate measures to place devices in safe mode or connected to white power outlets.

CTRL:

- not much to report, things are running

- Read the docs is operational again. A given feedback to CTRL is welcome.

DA:

- Nothing special to report.

EEE:

- Tomorrow update sase1 motion loop at 13:00: an email will be sent to readiness mailing list.

VAC:

- Nothing to report.

XPD:

-  Maintenance work ongoing: Imagers in XTD6; Work with EEE in XTD6 and XTD9.

DET:

- AGIPD: new control with new gain is tested. DAQ issue with data is fixed (K. Wrona informs it was related to a wrong hidden parameter setting).

ITDM:

- Downtime on Offline calibration system / GPFS: update to be made in about two weeks from now. K. Wrona says that ITDM would like to have one day of GPFS maintenance; it is important to switch to the new scratch files before we start operation. Data taking shall not be affected by this.

- Jan G. asks when would be required by the earliest. K. Wrona says they need to copy a lot of data before the update and it is estimated in two weeks (+-2 days), to take place in the second half of February. As photon activities take place in the last two weeks of February, one needs coordination to find a suitable date.

XRO:

- everything fine.

- Today closing of soft mono chamber in XTD10.

LAS:

- Upgrade in SA1 uTCA: information will be given to LAS this afternoon.

- Two Desy colleagues needs access in SA1 hutches. Use of FFP2 masks is mandatory.

UNSYS:

- ZZ in XTD4 is planned for Wednesday (for cleaning undulator area).

- Suren K. asks if the balcony rooms are effected by test emergency power switch. This will be discussed offline.

SPB:

- Nothing special to report.

FXE:

- Nothing special to report.

MID:

- all fine

HED:

- Nothing special to report.

SCS:

- Nothing special to report.

SQS:

- Nothing to report.

  196   03 Feb 2021, 09:26 Arvid GebhardtGeneralInformationNotes XO Integration Meeting 03.02.2021

General Announcement:

- Automatic Power Switch Testing was done yesterday. The switches are working as expected and a protocol has been produced. Torsten Schoen informs this test is done every 4 years; from now on equipment can be connected again to the orange and green power outlets.

- Re-start of the accelerator takes place from last Monday. Currently the setup of the injector and LINAC is ongoing. There are no changes to the last plan for closing dates of the photon tunnels.

CTRL:

- CTRL works on the Doocs Undulator devices/panels that have to be changed.

DA:

- nothing to report.

EEE:

- EEE and LAS people are on-site checking the reported uTCA problems after the power switch (by LAS). Issue refers to no communication to the uTCA.

- SASE1 motion loop update yesterday was done.

VAC:

- Not present.

XPD:

- XTD6 and XTD9 Shimadzu cameras update continue.

- Next loop update for XTD6 will probably be next week together with Hirex changes.

DET:

- all fine

ITDM:

- everything is fine

XRO:

- VAC is busy in tunnel leaking check the XTD10 soft mono (pressure went down to 10-6mbar already) but it takes more time.

LAS:

- Yesterday the SA1 and SA3 PP-laser systems were lost. Tomasz J. and EEE are looking into it.

UNSYS:

- today ZZ in XTD4 for the cleaning at SASE3. PRC has informed the BKR.

SPB:

- Problems with trigger of Gotthard are reported by Marcin S. It may be also linked to a communication issue.

FXE:

- nothing to add

MID:

- all fine

HED:

- nothing to add

SCS:

- not present.

SQS:

- Wanted to run digitizer on uTCA but could not find/communicate to it. Under investigation this afternoon.

  197   08 Feb 2021, 08:30 Arvid GebhardtGeneralInformationNotes XO Integration Meeting 08.02.2021

General Announcement:

- XTD10 tunnel was closed last Friday; XTD9 to be closed by end of this week; XTD6 is undefined – mostly likely by Monday. Any schedule deviation will be communicated.

CTRL:

- Deployment of offline services from 10.2 to 12.2. Services such as offline calibrations are not reliable in this time. An e-mail was sent and another reminder will be sent again.

DA:

- no news.

EEE:

- Update of PPL uTCA in SA1 today (laser);

- SASE2 PLC loop update to take place tomorrow at 13:00 (Hirex and Shimadzu camera).

VAC:

- Nothing to report

XPD:

- No issues to report.

- Andreas K. says in SA1 hardware activities are done; testing optical alignment.

- Hirex SA2 update is missing.

DET:

- nothing to report

ITDM:

- nothing to report

XRO:

- nothing to report

LAS:

- Switching on SA1 laser – after uTCA upgrade. Small issue relates to the missing trigger from Desy (dynamic triggers). Point of contact are Tim Wilksen and Lars Froelich.

UNSYS:

- Hick-ups with controls during the weekend. BKR opened gaps to 220mm and caused troubles (usually they open o 210mm).

- One ambient field coil needs ZZ for fixing (SA2/cell12); not urgent.

- Cleaning was done in XTD4.

SPB:

- setting up for the first set of commissioning

- Gotthard trigger seems to be solved.

FXE:

- nothing to add

MID:

- all fine

HED:

- nothing to add

SCS:

- not present.

SQS:

- uTCA digitizer issue: ongoing.

  198   10 Feb 2021, 09:20 Arvid GebhardtGeneralInformationNotes XO Integration Meeting 10.02.2021

General Announcement:

- Tunnel closure: it has been decided both XTD6 and XTD9 will be searched and closed on Monday 15.02.

- Temporary tunnel access requests: for ZZ access please be aware of the new Redmine ticket for access requests. The link to it appears in the BKR E-log.

- Use of FFP2 masks in experiments control hutches:  Sandra Plett informs rules such as temporary stop of work after 75 minutes of mask use or a day off after two working days with masks are not mandatory - these are only a recommendation; If two people are <1.5m, one has to use masks. While Seated or alone you can remove the masks; However, if there are people running around, please use masks also if seated; The wearing time is just a recommendation - it is not mandatory to make the break.

CTRL:

- Graphical user interface update: there is a new version to install in the gateway and BKR.

- Update of data loggers and GUI servers to take place.

DA:

- all going well.

EEE:

- SA2 loop update (MOV) was done yesterday for Hirex and Shimadzu.

VAC:

- nothing to report

XPD:

- DACHS terminal in XTD9 did not allow access: database connection issue. Andreas K. has contacted M. Prollius.

DET:

- Deployment of offline calibration pipeline from today until Friday. It will be communicated when it’s finished.

ITDM:

- Two weeks ago, ITDM pre-announced an offline GPFS update. Preparations will be ready by Friday. Ideally ITDM will deploy on next Monday. Please let K. Wrona aware if this date is not suitable.

XRO:

- Not present.

LAS:

- Upgrade on uTCA crate in SA1 – ADC acquires data. A small problem with data acquisition was found and a Redmine ticket was created. In any case all is fine for switching PPL-SA1 on.

- Today between 2:00-08:00AM there was no trigger coming to PPL-SA1. It may be from Desy or from Balcony room. Bruno F. will investigate the balcony rooms.

UNSYS:

- Unsys will request access for next week to fix a SA2 ambient coil.

SPB:

- nothing

FXE:

- nothing

MID:

- All fine

HED:

- nothing

SCS:

- nothing

SQS:

- Issues with trigger are fixed.

- uTCA firmware updated; now fixed.

  200   17 Feb 2021, 09:27 Arvid GebhardtGeneralInformationNotes XO Integration Meeting 17.02.2021

General Announcement:

CTRL:

- update for GUI server this morning is finished.

-  CTRL advices people starting systems such as cameras, in case of connecting issues please try first to reboot the devices first.

DA:

- nothing special to report.

EEE:

- will update PPL update mTCA SASE3 - affects only LAS group

VAC:

- nothing to report.

XPD:

- Recommissioning diagnostics in SA1.

- Pop-in YAG screen in FXE/SA1 was found broken. Any information on when was working last time please send to Andreas K. In this Pop-in is a second screen with diamond which is working. YAG exchange is for next maintenance period.

DET:

- The offline calibration service update is finished and is available again. Please contact DET in case of issues.

ITDM:

- nothing to report.

XRO:

- Working at BKR yesterday with commissioning SA1 alignment; SA1 is aligned until SPB and FXE.

- Today continuing with SA2 depending on beam stability.

- Idoia F. mentions that computers were not running at BKR. A check after shutdowns and prior operation is welcome.

LAS:

- The AMPHOS in SA3 needs a new power supply. Expected delivery and exchange on Friday.

- PLC update in SA3 and uTCA upgrade on Friday.

- Advancing with SA1-PPL commissioning.

- LAS will send e-mail to Zunaira A. for that MEA3 personal is contacted on the problems with sensor boxes.

UNSYS:

- Ambient field coil was fixed.

- New minimum gaps will be calculated and communicated to XO.

SPB:

- After interlock test last week there is an issue with the new DACHS terminal. The hutches can’t be accessed. Pouneh S. says DACHS is working but this particular new terminal might not be activated in the system. An special permission must be given. Tobias Haas will be informed to contact MEA3.

FXE:

- Martin K. will ask FXE colleagues on YAG screen information. Currently he is not aware when this happens (similar event back in 2019). 

MID:

- all fine.

HED:

- all fine.

SCS:

- in contact with Eric B. to get the beam shutter back on Friday for closing hutches during the weekend.

SQS:

- Early next week review with the digitizer engineers.

- Pouneh S. asks that laser interlock in laser hutch does not work. The new parts have been shipped and arrive soon. Together with TS electrician one has to exchange the relay. Daniel Rivas is informed.

  202   24 Feb 2021, 09:03 Arvid GebhardtGeneralInformationNotes XO Integration Meeting 24.02.2021

General Announcement:

- Due to a failure alarm in the smoke extraction system in XTD6+8+9, Desy colleagues will need to reboot a crate and exchange one module. This will bring down the air conditioning for the tunnels during about two hours. The activity is scheduled for March 1st starting at 11:30AM and it appears in the EuXFEL infrastructure calendar.

- It has been found a situation with one of the elevators to the XHEXP1 Hall. Due to corona regulations a maximum of 3 people is allowed simultaneously in the elevator. This number is indicated by signs/papers fixed nearby. However, someone unauthorized has modified the number “3” to an “8”. We are investigating the situation. The shields have been corrected back to “3” but we would like to remind signs and warnings must not be modified by unauthorized persons.

- Gerd W. informs that SXP chicane modification foreseen to take place today and tomorrow is shifted to Monday or Tuesday due to delays in delivery of components. Affected people have been contacted by PMO via but in case of issues with the new plan, please contact Gerd W.

CTRL:

- Few requests for tickets on Karabo devices were received. CTRL reminds to please add device ID in the ticket.

- SA3 motors: a few changes were done due to migration of MC2 motors. If someone or a group needs more input, please directly contact Steffen Hauf.

- Regarding Data Operation Center (DOC): CTRL would like to have a functional account to the instrument e-logs to be able to access it and track problems when OCD gets called. If instruments have any concerns with this, please contact Steffen Hauf.

DA:

- Nothing today.

EEE:

- No main issue.

- EEE also asks that when submitting tickets, please include the instrument and component name, preferentiably in the header.

- PLC side: ZZ to check motors.

VAC:

- Nothing to report.

XPD:

- Continuing today with beam commissioning of XTD6 components (HIREX and MCP).

DET:

- Nothing special to report.

ITDM:

- Nothing special.

XRO:

- Issues will be addressed when tunnels are open.

LAS:

- SA1 and SA3 PP-lasers are making progress.

UNSYS:

- Nothing to report.

SPB:

- Issues with Interlock and DACHS are solved.

FXE:

- Interlock issues are solved.

MID:

- Nothing special.

HED:

- Thomas Preston asks if the Covid regulations in hutches can be sent by e-mail. Sandra Plett will send the link to the documents after the meeting.

- The mask occupancy for the hutch was changed (are the signs updated or not?). Thomas P. says it was 4-5 but someone wrote new numbers in the signs. Sandra P. says that if everybody is using FFP2 masks, then more people are allowed than the max. occupancy.

- Pouneh S. says if people use laser safety googles, one can use FFP2 with filters. Sandra P. says that rules also apply for this case.

- Issues with cameras: DAQ did not run (did not take data, probably due to lost configurations). HED will send ticket.

SCS:

- Nothing to report.

SQS:

- Yesterday a meeting to review digitizers took place.

  204   03 Mar 2021, 09:23 Arvid GebhardtGeneralInformationNotes XO Integration Meeting 03.03.2021

General Announcement:

- Hick-ups in the beam operation are happening since last night. There is no obvious indications on the origin of the problem and MXL is investigating to restore a normal beam delivery condition.

- There is an issue with “Operation-2021” e-log where some SPB staff can’t login to create entries. This will be addressed by XO/PRC and ITDM (see ITDM entry).

CTRL:

- SA1 DAQ was dropping some trains (the late ones) in the XGM. CTRL and ITDM are following up and will test the XGM late this week or next week. CTRL will contact XPD for deployment first in SA2 and SA3.

DA:

- News from the DOC: deployment of major updates ongoing/to take place.

EEE:

- nothing to report

VAC:

- not present

XPD:

- Commissioning and setting up for SA3 HIREX

DET:

- preparing for commissioning Detectors

ITDM:

- Janusz S. says the configuration for the “Operation-2021” e-log uses the same configuration as previously set for 2020. F. Wolff-Fabris likens the issue with possible new users and asks SPB to provide the name of users who can’t login into the e-log.

Janusz S. says one can use the copy function from instruments e-log to place a copy into the Operations-2021 e-log. Jan G. says that login is necessary to avoid the entry being as “Anonymous”.

XO and ITDM will address it offline.

XRO:

- not present

LAS:

- In SA3 PP-laser one had exchange of power supply for AMPHOS due to communication errors.

- In SA1 PP-laser one observes a loss of 1/4 of power in AMPHOS. LAS is not sure if there is enough power for users.

- Two problems with triggers on Monday: 1. a faulty board in SA3; 2. MCS group update timing system caused trigger loss in all hutches (due to a bug in their server).

UNSYS:

- nothing to report

SPB:

- Couple of Helps asked to DOC and SPB/SFX are thankful for that.

- Login at Operation-2021 e-log does not work for 4 people.

FXE:

- Prepared for AIBS. Few PLC problems remain but not related to AIBS.

- Next week between Tuesday/Friday there are no access to the hutch due to floor work ongoing.

MID:

- all fine

HED:

- all fine

SCS:

- sliding door will probably be repaired today with an external company.

SQS:

- nothing to report

  206   10 Mar 2021, 09:20 Arvid GebhardtGeneralInformationNotes XO Integration Meeting 10.03.2021

General Announcement:

- nothing for now

CTRL:

- A few issues for DOC: Cameras IP addresses need to be reconfigured

- Continuing investigation of train-IDs on Doocs/XGM (they oscillate). CTRL will follow and close contact with Theo M. and Desy colleagues.

DA:

- nothing to report

EEE:

- nothing to report

VAC:

- nothing to report

XPD:

- Not present.

DET:

- nothing special – commissioning this week

ITDM:

- nothing to report

XRO:

- Maurizio V. reminds the SEPS interlock check in SA3 still has to happen as it is a condition prior beam operation. Zunaira A. says she sent an e-mail to xo-planning.

F. Wolff-Fabris asks if the SCS door is fixed or not, a pre-condition for the test. Zunaira A. replies the problem was with the power supply to the door and is fixed.

A date for the SEPS test can be planned by XO.

LAS:

- SASE2 interlock: LAS got unexpected calls when disconnecting AMPHOS cables (thus triggering SA2 Interlocks).

- SA3 AMPHOS no news since Monday. The ADC cards do not receive train-IDs.

- LAS suffer of lack of laser lab, missing PLC installation. LAS asks XO for a follow-up on prioritizations.

- Zunaira says that lasers are coupled to the interlocks (yesterday event happens as all lasers in room A23 and A07 are connected to the HED and MID interlocks). Thomas Preston says it triggers the warning lights for the laser lab. Zunaira A. says if shutters are closed it shall not be a problem if lasers reach this shutter signals. Tomasz J. says that ideally they must be decoupled.

UNSYS:

- nothing to report

SPB:

- going on with the plan; Detector commissioning from tomorrow.

FXE:

- the floor works are ongoing - looking good.

MID:

- not present

HED:

- nothing to report

SCS:

- A new experimental chamber (chemistry chamber) will be installed for beam commissioning on next month. A CPU in rack room is needed for recommissioning the motor an Martin T. waits for feedback.

SQS:

- Staff is getting the search training which was expiring.

- Noticed issues notice with DACHS system which show the access properties with delay. 