598
|
24 Mar 2025, 09:42 |
Frederik Wolff-Fabris | General | Information | Notes XO Integration Meeting 24.03.2025 |
General Announcement:
- A. Galler informs that on Friday there is the LIMP meeting organized by Martin Doering. Please contact him in case of questions. Information will be transmitted to people who does not attend it.
- As PRC, A. Galler mentions the SXP laser shutter issue happened on Saturday (see SXP).
- As DRC, David Lomidze informs it was a quiet week.
CTRL:
- Nothing to report.
DA:
- Not present.
EEE:
- Issue with CRL lenses in XTD2 with a stuck motor. A ZZ is needed tomorrow if possible to fix it.
VAC:
- Nothing to report.
XPD:
- Nothing to report.
DET:
- Nothing to report.
ITDM:
- Problems with GPFS system still in investigation.
XRO:
- Nothing to report.
LAS:
- Not present.
UNSYS:
- Nothing to report.
SPB:
- Nothing to report.
FXE:
- Data were collected; CRL got stuck.
- Pulse energy decreased ~20% every day and recovered in the morning; Also when SA2 changed number of pulses.
- uTCA crate crashed and a ticket is sent to EEE, together with DOC being called.
MID:
- Nothing to report.
HED:
- Not present.
SCS:
- Nothing to report.
SQS:
- Not present.
SXP:
- Saturday problem with Laser interlock related to AMPHOS shutter. A quick fix was found by PRC and Pouneh S.
- Responsibility for AMPHOS shutter will be discussed with LAS. |
599
|
26 Mar 2025, 09:43 |
Frederik Wolff-Fabris | General | Information | Notes XO Integration Meeting 26.03.2024 |
General Announcement:
- A. Galler reminds on the LIMP-2025 meeting taking place next Friday. If any group misses an invitation, please contact Martin Doering.
XO expects that the information distributed on Friday will be shared between the group by the present representative.
CTRL:
- Nothing to report.
DA:
- Not present.
EEE:
- Nothing to report.
VAC:
- Nothing to report.
- GATT/SA3 returned to normal operation after last week with gas exchange.
XPD:
- Nothing to report.
DET:
- Nothing to report.
ITDM:
- Nothing to report.
- Gateway issue just happened and may need a reboot after investigation.
XRO:
- A ZZ in XTD2 happened to CRL accumulated problems. It found one encoder is finally dead.
It was communicated to instruments that arm#2 vertical motion is in open loop as does not have an encoder reading. Realignment is needed as position is lost. Operation can continue and replacement of part
will be organized.
LAS:
- Can not access the gateway; ongoing fix with ITDM.
- SA1 PP-laser is down due to AMPHOS computer down.
- A. Galler enquires on responsibility for the AMPHOS shutter safety; clarification between LAS and SRP has to be done.
- SA3 ADC PP-laser missing values: understood by LAS and EEE; issue with settings of number of pulses. An update will be done to permit pulses higher than 800.
UNSYS:
- Nothing to report.
SPB:
- Nothing to report.
FXE:
- Nothing to report.
MID:
- Nothing to report.
HED:
- Nothing to report.
SCS:
- Nothing to report.
SQS:
- Nothing to report.
SXP:
- Not present. |
600
|
31 Mar 2025, 09:36 |
Frederik Wolff-Fabris | General | Information | Notes XO Integration Meeting 31.03.2025 |
General Announcement:
-
CTRL:
- Announcement: tomorrow around 10AM an upgrade of dataloggers will take place (to version Karabo 2.20.10) due to issues with data aggregator causing dataloggers to crash. E-mail to xo-info will be sent.
DA:
- Nothing to report.
EEE:
- Nothing to report.
VAC:
- Nothing to report.
XPD:
- Nothing to report.
DET:
- Nothing to report.
ITDM:
- Nothing to report.
XRO:
- Not present.
LAS:
- Not present.
UNSYS:
- Nothing to report; all fine.
SPB:
- Nothing to report.
FXE:
- Problem with encoder happened on Saturday evening, it was reported to EEE; It does not look like a showstopper.
MID:
- Nothing to report.
HED:
- Nothing to report.
SCS:
- Nothing to report.
SQS:
- Nothing to report.
SXP:
- Not present. |
601
|
02 Apr 2025, 10:31 |
Frederik Wolff-Fabris | General | Information | Notes XO Integration Meeting 02.04.2025 |
General Announcement:
- A. Galler reminds instruments that enquiring and requests on beam parameters shall come prior the respective RC meeting. Otherwise it will be difficult to accommodate last minute
changes.
CTRL:
- Performed update of dataloggers yesterday.
DA:
- All fine with DA.
EEE:
- Nothing to report.
VAC:
- Issue with broken power supply in SA3 on Monday 2PM. Downtime of 2 hs and it was fixed by exchanging it in a ZZ.
XPD:
- Nothing to report.
DET:
- Nothing to report.
ITDM:
- Nothing to report.
XRO:
- Not present.
LAS:
- Laser system working;
- Last Thursday evening decisions were done that incurred effects on PP-laser and access. An e-mail to XO will be sent with details.
UNSYS:
- Everything is fine.
SPB:
- Nothing to report.
FXE:
- Reported motor issues are fixed.
MID:
- Nothing to report.
HED:
- Not present.
SCS:
- Nothing to report; busy preparing DSSC2 setup.
SQS:
- Nothing to report; ready for beam.
SXP:
- Not present. |
602
|
07 Apr 2025, 09:42 |
Frederik Wolff-Fabris | General | Information | Notes XO Integration Meeting 07.04.2025 |
General Announcement:
- Reminder from A. Galler: please use the Operations e-log to report issues or comments instruments may have.
CTRL:
- Nothing to report.
DA:
- Nothing to report.
EEE:
- P. Gessler informs in activity organized by Desy: 10Hz synchronization signal has to be synchronized to the 50Hz of the power work.
A measurement campaign will happen on 17.June without the sync with the 50Hz. There is the possibility to run this day for tests.
A meeting on 06.June will take place; please contact Patrick Gessler to be included in the preparation meeting.
It does not affect normal users and is intended to evaluate possible drifts.
VAC:
- Having a group retreat.
XPD:
- Nothing to report.
DET:
- Nothing to report. Jola S.-D. will discuss with Patrick G. on the 50Hz sync tests.
ITDM:
- Nothing to report.
XRO:
- Nothing major to report.
LAS:
- Various issues with 1. interlock failing; 2. reset timing; 3. water leakage at sub-sync hutch.
UNSYS:
- Everything is fine.
SPB:
- Nothing to report.
FXE:
- Nothing to report.
MID:
- All fine at MID.
HED:
- Lbsync was down over the weekend.
- Bucket jumps on the PP-laser: needs to be readjusted delay time between PP-laser and FEL. Daniel K. says a call to OCD will help to set it up. Probably due to Lbsync issues.
SCS:
- Not available.
SQS:
- Not present.
SXP:
- Preparing the experiment for this week. |
603
|
09 Apr 2025, 10:07 |
Frederik Wolff-Fabris | General | Information | Notes XO Integration Meeting 09.04.2025 |
General Announcement:
-
CTRL:
- Nothing major to report.
DA:
- Nothing to report.
EEE:
- Issue early morning with SPB PLC server which stopped communicating. It has recovered, if it happens again please contact EEE.
VAC:
- Nothing to report.
- Nerea J. comments in SA1 Si attenuator: a ZZ seems to be needed; A. Trapp says XRO is not involved so far; Chan K. says that SPB is fine with the current situation and thus the ZZ can be postponed.
XPD:
- Nothing to report.
- As PRC, J. Gruenert says all is fine and has also no information on the ZZ for SA1 attenuator.
DET:
- Nothing to report.
ITDM:
- Info for following week:
1. Maxwell cluster maintenance next Wednesday between 10:00-11:00 (e-mail to be sent);
2. Additional investigation on the GPFS performance will also be performed next week 15.04 (e-mail also to be sent).
XRO:
- Nothing to report.
LAS:
- Nothing to report.
UNSYS:
- Problem with SA3 cell 26: bottom shifter driver was stuck. Attempt to recovered via remote failed; a ZZ is mandatory to power cycle (next possible action for a fix).
SPB:
- Everything on PLC and Attenuator already discussed. Own SPB attenuators are in use.
FXE:
- Nothing to report.
MID:
- Continue measurements with FD activity until next Thursday.
HED:
- Nothing to report.
SCS:
- Preparing the DSSC2 tests taking place next week. A special electrical setup is in place at the hutch which needs a special training to allow access into the hutch. Warning signs will be placed.
SQS:
- Not present.
SXP:
- Not present. |
607
|
28 Apr 2025, 09:44 |
Frederik Wolff-Fabris | General | Information | Notes XO Integration Meeting 28.04.2025 |
General Announcement:
- From PRC, Maurizio V. and Raul V. have no new things to report, apart of the HXRSS difficult tuning.
- As DRC, Luis Maia says the main points were discussed (see below).
CTRL:
- Friday heard from Desy an update on servers that hold DOOCS and uTCA has to be done, and is planned for tomorrow. In case it is not transparent, the DOOCS servers will need
to be restarted from our
side.
DA:
- Nothing to report.
EEE:
- uTCA system to be restarted in case Tuesday's intervention affects it.
VAC:
- Everything is fine.
XPD:
- Nothing to report.
DET:
- Nothing to report.
ITDM:
- Nothing to report.
- Related to Tuesday's updates with JDDD: in case of issues one option is to redefine the variables in the servers, as once tested.
XRO:
- Nothing to report.
LAS:
- Not present.
UNSYS:
- Everything is fine.
- Issues with lost of high level controls in the last blue week: not fully understandable why the fiber optics was lost.
SPB:
- Pulse energy during the nights is low; started with 1mJ and later dropped to ~600uJ.
FXE:
- Digitizer problem during the week was solved:
This occurred when a change of bunch number was requested; the digitizers are reconfigure via mid-layer device whenever number of pulses/frequency is updated.
It is not clear if this was the cause of the issue. DOC reboot the hardware which resume data acquisition.
Today (Monday) morning FXE noted that another mid-layer device was not displaying digitizer data properly; since the digitizers are the base class, it could be that
communication was not reinitiated after the hardware reboot. Re-instantiating the mid-layer fix the issue.
- A temperature drift on the Mono is still to be investigated and XRO is aware of it.
MID:
- Nothing to report.
HED:
- Not present.
SCS:
- Nothing to report.
SQS:
- Nothing to report; running instrument.
SXP:
- Not present. |
608
|
30 Apr 2025, 10:12 |
Frederik Wolff-Fabris | General | Information | Notes XO Integration Meeting 30.04.2025 |
General Announcement:
- Kimon F. informs that tests for a multi-mode fiber communication in XTD4 have to be scheduled with an external company. XO will organize it.
CTRL:
- Update about the name server update at the Desy side on the DOOCS: not done yesterday and shall happen next Tuesday 06.May.
CTRL is prepared for corrective actions if needed (restarting DOOCS devices in Karabo).
- Bridges Karako-DOOCS may need to be restarted with the new name server (Flash default). Shall be further investigated if this would be the case.
DA:
- All fine at DA.
EEE:
- Timing system and DOOCS update: EEE was in contact with Desy and confirmed the XFEL information is going to the new server.
Middle layer devices were not affected by changing to the new server.
VAC:
- Everything is fine.
XPD:
- No issues to report.
DET:
- Nothing to report.
ITDM:
- Nothing to report.
XRO:
- Everything fine. Seems the ZZ yesterday was fine.
LAS:
- Nothing to report.
UNSYS:
- SA3 cell#26: under work and trying to fix.
SPB:
- Nothing to report.
FXE:
- Nothing to report.
MID:
- All fine at MID.
- A. Galler says the HXRSS could benefit from a signal looking at the seeded beam with the mono and downstream XGM (from last week HED).
MID may use a downstream HIREX that may be used. J. Gruenert proposes to use the diamond detector.
HED:
- Nothing to report.
SCS:
- Nothing to report.
SQS:
- Not present.
SXP:
- Not present. |
609
|
05 May 2025, 09:55 |
Frederik Wolff-Fabris | General | Information | Notes XO Integration Meeting 05.05.2025 |
General Announcement:
-
CTRL:
- Reminder: Desy will perform update tomorrow and DOOCS server will be restarted tomorrow at 13:00.
DA:
- Nothing to report.
EEE:
- Nothing to report.
VAC:
- Nothing to report.
XPD:
- Nothing to report.
DET:
- Nothing to report.
- As DRC, Jola S.-D. says it was a quiet week only a cooling water issue at the balcony rooms happened on May 01.05; a fast reaction prevented major issues.
High temperature in balcony room 28 (SASE2) was measured and DOC reacted by being called from ITDM-OCD.
The MKK technicians also acted; doors were opened to control temperature. Issue caused by a valve (Desy side) controlled that had to be exchanged.
ITDM:
- Nothing to report.
XRO:
- Nothing to report.
- Drift of Mono at FXE: investigation in the shows the cryo cooling needs to be serviced for refill during a tunnel access that is requested.
LAS:
- Not present.
UNSYS:
- Nothing to report.
SPB:
- Nothing to report.
FXE:
- Nothing to report.
MID:
- All fine at MID.
HED:
- Not present.
SCS:
- Not present.
SQS:
- Not present.
SXP:
- Problem with LabSync timing synchronization from Desy side happened last days but seems to be fixed. |
610
|
07 May 2025, 09:50 |
Frederik Wolff-Fabris | General | Information | Notes XO Integration Meeting 07.05.2025 |
General Announcement:
-
CTRL:
- Yesterday update/intervention with DOOCS server was done and went fine; Systems are up and running.
DA:
- Nothing major for DA.
EEE:
- Nothing to report.
VAC:
- Everything fine.
XPD:
- 3 ZZs done yesterday: camera alignment in SA1; scroll pump belonging to PES XTD2 fixed; and XTD6 shimadzu camera intervention fine;
DET:
- Nothing to report.
ITDM:
- Not present.
XRO:
- Attenuator fixed in SA1. All fine.
LAS:
- Not present,
UNSYS:
- Everything is fine with Undulators.
- Suren K. reports and entry at TTFinfo for missing communication between undulators and XGM. Seems to be DOOCS related issue. Theo M. will be contacted by A. Koch.
SPB:
- Nothing to report.
FXE:
- Not present.
MID:
- Nothing to report.
HED:
- Nothing to report.
SCS:
- Not present.
SQS:
- Not to report.
SXP:
- Not present. |
611
|
12 May 2025, 09:36 |
Frederik Wolff-Fabris | General | Information | Notes XO Integration Meeting 12.05.2025 |
General Announcement:
- Successful delivery last days with exceptional machine performance. From tomorrow we have a FD week followed by a 12GeV week.
CTRL:
- Nothing to report.
DA:
- Quiet at DA.
EEE:
- Nothing to report.
VAC:
- Nothing to report.
XPD:
- Nothing to report.
DET:
- Nothing to report.
ITDM:
- Nothing to report.
XRO:
- Nothing to report.
LAS:
- Wednesday CTRL helped with SPB/FXE but fixed.
UNSYS:
- Nothing to report.
SPB:
- Challenges with PP-laser not being able to use WED and THU (switch between masters FXE/SPB); also SAT alignment issues all fixed with help from OCD. LAS and SPB will further discuss.
FXE:
- Nothing to report.
MID:
- Nothing to report.
HED:
- Not present.
SCS:
- Nothing to report.
SQS:
- Nothing to report.
SXP:
- Not present. |
612
|
14 May 2025, 09:39 |
Frederik Wolff-Fabris | General | Information | Notes XO Integration Meeting 14.05.2025 |
General Announcement:
- As PRC, Jan Gruenert reports a problem with fire detection system in XTD4 needed the entire day yesterday to fix and by 18:00 was concluded. The North branch was
not having beam during this time.
SA1 started from the evening and SA3 started with beam today morning.
CTRL:
- Remind that today it's planned an intervention to upgrade the SMS service. Ongoing until about 12:00. Notifications are not being sent in this period.
DA:
- Nothing to report.
EEE:
- Nothing to report.
VAC:
- Yesterday an intervention with open tunnel for the FXE mono to refill system with gas.
XPD:
- All fine with XPD.
DET:
- Nothing to report.
ITDM:
- Nothing to report.
XRO:
- Nothing to report.
LAS:
- Not present.
UNSYS:
- Nothing to report.
SPB:
- Involved on night shifts from tomorrow with PAM/BAM/LAM.
FXE:
- Not present.
MID:
- Nothing to report.
HED:
- Not present.
SCS:
- Nothing to report.
SQS:
- Not present.
SXP:
- Not present. |
613
|
19 May 2025, 09:42 |
Frederik Wolff-Fabris | General | Information | Notes XO Integration Meeting 19.05.2025 |
General Announcement:
- Harald Sinn inform on the first lasing for XFELO on Sunday morning shift; 100 bunches in the pulse train was giving synchrotron already on Saturday showing the cavity was aligned.
On Sunday was difficult to find FEL intensity but successful by ~14:30 while scanning cavity. After getting the signal, it was surprisingly stable and running well.
CTRL:
- Nothing major to report.
DA:
- Nothing to report.
EEE:
- Nothing to report.
VAC:
- Nothing to report.
XPD:
- No issues from XPD;
- Success with FD activities.
DET:
- Nothing to report.
ITDM:
- Nothing to report.
XRO:
- Not present.
LAS:
- Not present.
UNSYS:
- Yesterday a ZZ was done in XTD4 to fix SASE3 cell26 Phase shifter.
SPB:
- Issue with Laser interlock in laser hutch; it will be discussed with Pouneh S. soon.
FXE:
- Not present.
MID:
- All fine at MID.
HED:
- Nothing to report.
SCS:
- Not present.
SQS:
- All good.
SXP:
- Nothing to report. |
614
|
21 May 2025, 09:36 |
Frederik Wolff-Fabris | General | Information | Notes XO Integration Meeting 21.05.2025 |
General Announcement:
-
CTRL:
- Nothing major to report.
DA:
- Quiet at DA.
EEE:
- Nothing to report.
VAC:
- Not present.
XPD:
- Nothing to report.
DET:
- Nothing to report.
ITDM:
- Nothing to report.
XRO:
- Not present.
LAS:
- Not present.
UNSYS:
- Nothing to report.
SPB:
- Problem at Laser hutch was fixed yesterday by exchanging a door magnet.
FXE:
- Not present.
MID:
- All fine at MID.
HED:
- Everything is fine.
SCS:
- All fine at SCS.
SQS:
- Not present.
SXP:
- Not present. |
615
|
26 May 2025, 09:56 |
Frederik Wolff-Fabris | General | Information | Notes XO Integration Meeting 26.05.2025 |
General Announcement:
- A. Galler mentions the V0 was operated by another group after being interlock on Saturday by a vacuum issue in XTD6 while VAC-OCD was investigating the issue.
Operation by anyone else has to be prevented in future and only VAC staff shall operate it.
CTRL:
- Issue at MID GUI server being investigated.
DA:
- Nothing major to report.
EEE:
- Nothing to report.
VAC:
- Issue with SA2 Saturday handled by VAC-OCD and PRC.
- Several mails came from Karabo issue with vacuum pumps in SA1 - to be forwarded to CTRL and discussed.
XPD:
- Nothing to report.
DET:
- Nothing to report.
ITDM:
- Not present.
XRO:
- Nothing major to be reported.
LAS:
- Not present.
UNSYS:
- Nothing to report.
SPB:
- Continue with measurements; some difficulties with sample synchronization; nothing else to report.
FXE:
- Nothing to report.
MID:
- Nothing to report apart of the mentioned vacuum issue.
HED:
- Nothing to report.
SCS:
- Nothing to report.
SQS:
- Not present.
SXP:
- Not present. |
616
|
28 May 2025, 09:42 |
Frederik Wolff-Fabris | General | Information | Notes XO Integration Meeting 28.05.2025 |
General Announcement:
-
CTRL:
- Investigate issue reported last Monday with MID is scheduled for next Monday.
DA:
- Not present.
EEE:
- One topic: motor in CRL in XTD2 found by FXE when doing larger steps caused issues (ZZ seems to be needed); however, with smaller steps it works fine and can be used.
A ticket is here: https://redmine.xfel.eu/issues/221334#change-751944
VAC:
- Nothing to report.
XPD:
- Nothing to report.
DET:
- Nothing to report.
ITDM:
- Adding data space for the last two weeks of operation: a server integration shows an issue and ITDM works on it for the next days.
XRO:
- Not present.
LAS:
- Not present.
UNSYS:
- Nothing to report.
SPB:
- This week still fine;
- Issues for the Data measured in March with timing drifts and compensation for PP-laser did not work for three weeks. Contact with LAS to be made later today.
FXE:
- Not present.
MID:
- Nothing to report.
HED:
- Not present.
SCS:
- Not present.
SQS:
- Not present.
SXP:
- Not present. |
617
|
02 Jun 2025, 09:51 |
Frederik Wolff-Fabris | General | Information | Notes XO Integration Meeting 02.06.2025 |
General Announcement:
- The ongoing delivery sees a HXRSS at 12GeV with 1mJ total intensity (~350uJ background).
CTRL:
- Nothing major to report.
DA:
- Nothing to be reported.
EEE:
- Nothing to report.
VAC:
- Not present.
XPD:
- No issues to report.
- Big brother stopped SA1 because of HIREX power limit: J. Gruenert reports that all pulses of the train are now being seen by Big Brother and things worked as expected.
DET:
- Nothing major to report.
ITDM:
- Nothing to report.
XRO:
- Nothing to report.
LAS:
- Ticket was discussed for SPB (timing issues): under investigation and a bug on the code has been found and is under work.
UNSYS:
- Issue with PS in cell#8 in SA1 was already fixed remotely.
SPB:
- Two issues: 1. HIREX watchdog needs a change of filter then works fine; 2. Issue with sample delivery leads that SPB will not use beam tonight (FXE can take if wanted).
- uTCA tested a monitor for received timing info together with ITDM and this test was performed parasitically at SPB.
FXE:
- Nothing to report.
MID:
- Nothing to report.
HED:
- HXRSS performance this week is excellent.
SCS:
- Not present.
SQS:
- Nothing to report.
SXP:
- Not present. |
618
|
04 Jun 2025, 09:44 |
Frederik Wolff-Fabris | General | Information | Notes XO Integration Meeting 04.06.2025 |
General Announcement:
-
CTRL:
- Nothing to report.
DA:
- Nothing to report.
EEE:
- Nothing to be reported;
- Yesterday Patrick G. received invitation for the meeting on the 50Hz tests on 17.06 taking place at Desy. Patrick G. will forward it to xo-info.
VAC:
- Not present.
XPD:
- Nothing to report.
DET:
- Nothing to report;
- DSSC issue faced last week: problem was solved; S. Hauf said the follow up was taking place Friday afternoon together with SCS by debugging the detector.
ITDM:
- Nothing to report.
- A. Galler saw issues while logging in Fast-X and will discuss with J. Szuba on it.
XRO:
- No issues to report.
LAS:
- Not present.
- LIMP activities: instruments that requested use of PP-laser during LIMP shall be secured. Otherwise please contact XO.
UNSYS:
- Positioning HXRSS crystal showed a lost communication in DOOCS server: solved;
- PS in SA2 cell10 was stuck yesterday and is also solved.
SPB:
- Nothing to report.
FXE:
- Not present.
MID:
- Nothing to report.
HED:
- Everything seems to be fine at HED.
SCS:
- Not present.
SQS:
- Nothing to report.
SXP:
- Not present. |
182
|
30 Nov 2020, 09:15 |
Arvid Gebhardt | General | Information | Notes XO Integration Meeting 30.11.2020 |
General Announcement:
- /
CTRL:
- Karabo 2.10 FXE was sucessful.
- go on with SPB and go on with other instruments. On Thurthday 3rd all SASE3 topics.
- Connenting Gui clients, if gateway there is no need to write a tiket this week. If local installation, please make an update.
- network upgrade takes place at SASE1 tomorrow. Karabo will be updated later.
DA:
- /
EEE:
- MircoTCA updates today and on going. Timing won´t be avaliable for short period.
VAC:
- /
XPD:
- /
DET:
- /
ITDM:
- Tomorrow network update SASE1, but there no Karbo update.
- at the beginning of January DESY-IT will do some work on data center / maxwell clust. interuptions are expected. Schedule is still be to expacted.
XRO:
- Not present.
LAS:
- Tests on the mircoTCA failt. More tests needs to be done.
- LAS request comunication from instruments go thru XO.
UNSYS:
- Not present.
SPB:
- Aigipd intervention is running well. To be tested by the end of this week.
FXE:
- cable installation on going.
MID:
- all fine
HED:
- /
SCS:
- Not present.
SQS:
- / |
186
|
14 Dec 2020, 09:00 |
Arvid Gebhardt | General | Information | Notes XO Integration Meeting 14.12.2020 |
General Announcement:
- Please write to xo.planning, if something comes up with intteruption of the maintenance due to new COVID-19 regulations.
CTRL:
- Migration of Beckhoff MC2 motors at SA3.
- Checking operation (e.g. soft mono at SA3).
- Final checks together with EEE.
DA:
- nothing to report
EEE:
- Migration at SA3 MC2 PLC´s.
- Fast ADC: SA2 maintenance starts.
- Cabling to be done in SQS today and tomorrow at HED.
- Crate was sent to Poland and shall arrive this week.
VAC:
- not present.
XPD:
- problem / alarm XGM at SASE1 / XTD2 - Needs to re-cable and install new gauges; requires VAC group.
- PES was re-installed in XTD10 and has been pumped down.
- DAQ test on friday - things are fine.
- XTD6 XGM alignment starts today - used to be confirmed with VAC.
DET:
- AGIPD intervention: need some internal coordination also with DASY groups - it will let XO know, if support needed
ITDM:
- XFEL gateway next Monday
- pre-anouncement: 90% of maxwell cluster update to be done on January 4/5. Communication to be send to Readiness mailing list.
XRO:
- Testing Controls in tunnel devices - needs to fix SA3 expected bugs.
- XTD10 close the vaccuum for M6 mirror chamber this week.
- XTD6 some problems with M3 mirror: to be pumped down this week and checked start of January.
LAS:
- Small delay on works at SA3, but no risk for users.
- Question from LAS: is the SA1 laser interlock update takes place?
- SA2 AMPHOS: external company is coming today
UNSYS:
- not present
SPB:
- nothing to report
FXE:
- nothing to report
MID:
- all fine
HED:
- don´t have anything
SCS:
- nothing to report
SQS: