Technical integration and coordination
SASE1 Status and SASE3 Readiness
|
Technical integration and coordination logbook, Contact: A. Violante, G. Wellenreuther |
Not logged in |
 |
|
Message ID: 617
Entry time: 02 Jun 2025, 09:51
|
Author: |
Frederik Wolff-Fabris |
Location: |
General |
Severity: |
Information |
Subject: |
Notes XO Integration Meeting 02.06.2025 |
|
|
General Announcement:
- The ongoing delivery sees a HXRSS at 12GeV with 1mJ total intensity (~350uJ background).
CTRL:
- Nothing major to report.
DA:
- Nothing to be reported.
EEE:
- Nothing to report.
VAC:
- Not present.
XPD:
- No issues to report.
- Big brother stopped SA1 because of HIREX power limit: J. Gruenert reports that all pulses of the train are now being seen by Big Brother and things worked as expected.
DET:
- Nothing major to report.
ITDM:
- Nothing to report.
XRO:
- Nothing to report.
LAS:
- Ticket was discussed for SPB (timing issues): under investigation and a bug on the code has been found and is under work.
UNSYS:
- Issue with PS in cell#8 in SA1 was already fixed remotely.
SPB:
- Two issues: 1. HIREX watchdog needs a change of filter then works fine; 2. Issue with sample delivery leads that SPB will not use beam tonight (FXE can take if wanted).
- uTCA tested a monitor for received timing info together with ITDM and this test was performed parasitically at SPB.
FXE:
- Nothing to report.
MID:
- Nothing to report.
HED:
- HXRSS performance this week is excellent.
SCS:
- Not present.
SQS:
- Nothing to report.
SXP:
- Not present. |