Message ID: 609     Entry time: 05 May 2025, 09:55
Author: Frederik Wolff-Fabris 
Location: General 
Severity: Information 
Subject: Notes XO Integration Meeting 05.05.2025 
General Announcement:
-	 

CTRL:
- Reminder: Desy will perform update tomorrow and DOOCS server will be restarted tomorrow at 13:00.

DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- Nothing to report.

XPD:
- Nothing to report.

DET:
- Nothing to report.
- As DRC, Jola S.-D. says it was a quiet week only a cooling water issue at the balcony rooms happened on May 01.05; a fast reaction prevented major issues. 
High temperature in balcony room 28 (SASE2) was measured and DOC reacted by being called from ITDM-OCD. 
The MKK technicians also acted; doors were opened to control temperature. Issue caused by a valve (Desy side) controlled that had to be exchanged.

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.
- Drift of Mono at FXE: investigation in the shows the cryo cooling needs to be serviced for refill during a tunnel access that is requested.

LAS:
- Not present.

UNSYS:
- Nothing to report.

SPB:
- Nothing to report.

FXE:
- Nothing to report.

MID:
- All fine at MID.

HED:
- Not present.

SCS:
- Not present.

SQS:
- Not present.

SXP:
- Problem with LabSync timing synchronization from Desy side happened last days but seems to be fixed.  