Technical integration and coordination
|
| Technical integration and coordination logbook, Contact: A. Violante, G. Wellenreuther |
Not logged in |
 |
|
|
Message ID: 659
Entry time: 22 Oct 2025, 09:47
|
| Author: |
Frederik Wolff-Fabris |
| Location: |
General |
| Severity: |
Information |
| Subject: |
Notes XO Integration Meeting 22.10.2025 |
|
|
General Announcement:
- M. Doering announces on the LIMP-25 for next week:
1. Update on air conditioning issues: was repaired on Monday and is back in operation;
2. Karabo update: planned to come to an end during next week;
3. After Karabo3 is done then PLC updates will start;
4. HED radiation Interlock tests to be conducted on 29.10.
- Tobias C. informs on the gas monitoring system: Draeger company is onsite and work is continuing and there is a chance to still finish this week. Sirens were tested while people were not informed -
Tobias C. will discuss with workers.
- Kristina Lorenzen mentions that SRP can be contacted if gases are needed in the meantime. It is obligatory to contact SRP if gases are needed before the work mentioned by Tobias C. is finished.
- The XO integration elog will be moved to ZULIP / Metadata today. Link will be prepared and distributed by XO.
- Daniele La Civita raises two points:
1. Are CTRL and PLC available in tunnels in November? CTRLs will be ready and no deployments are scheduled for end of October in tunnels. So they shall be available for testing new devices;
2. XTD10 tunnel is closed due to the cabling installation: Cycling is not permitted and barriers shall not be removed. One still can go by foot and check if someone can pass through.
The activity is planned to finish by end of next week. Please contact XO is work in XTD10 has to be done by other groups.
CTRL:
- Tests with Karabo3 at FXE and SPB will be done;
- Continuing with migration of systems;
- Update by end of this week.
DA:
- All quiet at DA.
EEE:
- Remind that timing interruption will happen tomorrow, 23.10, between 9AM and 3PM.
VAC:
- Nothing to report.
XPD:
- Nothing to report.
DET:
- Apart of Surprised of loss of nitrogen in clean room, all fine.
ITDM:
- Humidity in balcony room 28 (SA2) is too high (in touch with Tobias Clever). Oxygen exchange is also not working - please get door open if one works inside this balcony room.
- Interruption of myMDC next Friday for upgrade.
XRO:
- Nothing to report.
LAS:
- Not present.
UNSYS:
- All fine.
SPB:
- Nothing to report.
FXE:
- Nothing to report.
MID:
- All fine at MID.
HED:
- Not present.
SCS:
- Nothing to report.
SQS:
- Nothing to report.
SXP:
- All fine. |