Technical integration and coordination SASE1 Status and SASE3 Readiness
  Technical integration and coordination logbook, Contact: A. Violante, G. Wellenreuther  Not logged in ELOG logo
Message ID: 654     Entry time: 06 Oct 2025, 09:45
Author: Frederik Wolff-Fabris 
Location: General 
Severity: Information 
Subject: Notes XO Integration Meeting 06.10.2025 
General Announcement:
- M. Doering announces on the LIMP-25: 
1. Pressurizer exchange is postponed from today to a date likely in two weeks, to be informed; 
2. Magnet cabling in XTD10 starts on Wednesday and pre-absorber work must finish before (see VAC/XRO); 
3. News on timing system (see EEE).

CTRL:
- Preparing for Karabo3 rollout as scheduled.

DA:
- Nothing to report.

EEE:
- Update of timing system is scheduled for today after lunch. Groups are informed.
- PLC side: SPB and MID tests are ongoing.

VAC:
- XTD10 pre-absorber works: XPD part is done and VAC has to extract the pre-absorber and seal the vacuum, no issues to do in the next two days to avoid collision with magnet cabling.

XPD:
- Nothing to report.

DET:
- Nothing to report.

ITDM: 
- Nothing to report.

XRO:
- Nothing to report; pre-absorber work is ongoing well.

LAS:
- Nothing to report; no collisions with timing update.

UNSYS:
- Nothing to report.

SPB:
- Nothing to report.

FXE:
- Nothing to report.

MID:
- All fine at MID.

HED:
- Nothing to report.

SCS:
- Nothing to report.

SQS:
- Nothing to report.

SXP:
- All fine at SXP.