Technical integration and coordination
SASE1 Status and SASE3 Readiness
|
Technical integration and coordination logbook, Contact: A. Violante, G. Wellenreuther |
Not logged in |
 |
|
Message ID: 652
Entry time: 29 Sep 2025, 09:50
|
Author: |
Frederik Wolff-Fabris |
Location: |
General |
Severity: |
Information |
Subject: |
Notes XO Integration Meeting 29.09.2025 |
|
|
General Announcement:
- On the LIMP-25: the XS4 shaft building elevator is not working and repair is to be done. Please use other shaft buildings or ways when accessing SA2 tunnel with equipment.
CTRL:
- From 01.10 Karabo will be unavailable due to scheduled necessary upgrade.
DA:
- Nothing to report.
EEE:
- Working on ODL SA3; continuing replacing CPUs in SA1 and SA2; and bringing up SQS parts this week.
VAC:
- All fine from VAC.
XPD:
- Nothing to report.
DET:
- Nothing to report.
- Power cuts on the X-ray sources: it was tested and both source and detector are working nice. No effects from that power cut.
ITDM:
- Cisco VPN is disconnected due to security issues and currently there is no info when might be available again. Please use other options such as eduVPN in the meantime.
XRO:
- Not present.
LAS:
- Nothing to report.
UNSYS:
- Not present.
SPB:
- Nothing to report.
FXE:
- Nothing to report.
MID:
- Nothing to report.
HED:
- Not present.
SCS:
- Nothing to report.
SQS:
- Nothing to report.
SXP:
- Nothing to report. |