Technical integration and coordination
SASE1 Status and SASE3 Readiness
|
Technical integration and coordination logbook, Contact: A. Violante, G. Wellenreuther |
Not logged in |
 |
|
Message ID: 650
Entry time: 22 Sep 2025, 09:42
|
Author: |
Frederik Wolff-Fabris |
Location: |
General |
Severity: |
Information |
Subject: |
Notes XO Integration Meeting 22.09.2025 |
|
|
General Announcement:
- Construction noises heard at XHQ 2nd floor comes from HXS works at the experimental Hall.
- Tobias Clever: a power glitch was seen on Sunday around 17:00 and some pumps supplying cooling water to XHQ level 0 were affected; also ventilation at the buildings was affected.
TS OCD could restore the pumping system before temperatures have rising.
CTRL:
- Proceeding well with Karabo3 tests at MID.
DA:
- Nothing to report.
EEE:
- Continue with maintenance at SA2 PLC systems.
- SA3 undulators will be also upgrades.
VAC:
- Nothing to report.
XPD:
- Nothing to report; everything ongoing as planned; all normal with XGM pressure.
DET:
- Nothing to report; AGIPD 4M: to be discussed offline.
ITDM:
- Nothing to report.
XRO:
- Nothing to report.
LAS:
- Not present.
UNSYS:
- Everything is fine; installation in SA2 is ongoing.
SPB:
- Nothing to report.
FXE:
- Not present.
MID:
- All fine at MID.
HED:
- Nothing to report.
SCS:
- Not present - nothing to report.
SQS:
- Nothing to report.
SXP:
- Nothing to report. |