Technical integration and coordination SASE1 Status and SASE3 Readiness
  Technical integration and coordination logbook, Contact: A. Violante, G. Wellenreuther  Not logged in ELOG logo
Message ID: 650     Entry time: 22 Sep 2025, 09:42
Author: Frederik Wolff-Fabris 
Location: General 
Severity: Information 
Subject: Notes XO Integration Meeting 22.09.2025 
General Announcement:
- Construction noises heard at XHQ 2nd floor comes from HXS works at the experimental Hall. 
- Tobias Clever: a power glitch was seen on Sunday around 17:00 and some pumps supplying cooling water to XHQ level 0 were affected; also ventilation at the buildings was affected. 
TS OCD could restore the pumping system before temperatures have rising. 

CTRL:
- Proceeding well with Karabo3 tests at MID.

DA:
- Nothing to report.

EEE:
- Continue with maintenance at SA2 PLC systems.
- SA3 undulators will be also upgrades.

VAC:
- Nothing to report.

XPD:
- Nothing to report; everything ongoing as planned; all normal with XGM pressure.

DET:
- Nothing to report; AGIPD 4M: to be discussed offline.

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.

LAS:
- Not present.

UNSYS:
- Everything is fine; installation in SA2 is ongoing.

SPB:
- Nothing to report.

FXE:
- Not present.

MID:
- All fine at MID.

HED:
- Nothing to report.

SCS:
- Not present - nothing to report.

SQS:
- Nothing to report.

SXP:
- Nothing to report.