  271   25 Oct 2021, 10:50 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 25.10.2021
General Announcement:
- An e-mail was sent to "xo-info" mailing list concerning the cooling water maintenance scheduled for one week starting on Dec. 6th. 
More information will be sent by the end of this week and if you have any concerns, please contact us at xo-planning@xfel.eu.

CTRL:
- Shimadzu camera at SPB to be followed up; Also, the pop-up motor at HED needs a feedback.
- Related to DRC: on Friday SQS was using the bunch patter server and the machine server was going back to zero pulses. Cause was another Karabo device at SCS topic which was working / forgotten and was 
setting bunches to zero. 
Important is that none was knowing this was running. Follow up with XO for new procedures.

DA:
- Nothing major to report.

EEE:
- PLC side: backlash 2 step compensation successfully tested.
- Cabling at FXE had some troubles and today there will be a recheck.

VAC:
- Friday incident with Interlock on SA3 (faulty gauge at GATT): reason is known and was communicated to the involved parts. Long term plan to mitigate is in place.

XPD:
- Involved at high energy tests in SA1 and SA2; SA1 worked well delivering beam at SPB; SA2 had 300uJ in XTD1 but a high intensity at HED was not achieved. On Sunday HED colleagues did some tests; 
Calorimeter did not see beam.
- Imagers YAG imagers could see the beam at the end of HED station. YAG is not too bad at these high energies (only factor 2x less). Diamond is not suitable as one needs to integrate lot of pulses to get 
signal.
- Upgrade on Imagers together with Andrea Parenti is already concluded, tested and shall be working fine. Some Karabo devices had to be restarted in SA1, SA2 and SA3. In case of issue, please contact 
Andrea Parenti.

DET:
- DSSC activities with DEPFET ladder measurements at SQS went well; happy with acquired data.

ITDM: 
- Nothing to report.

XRO:
- SA1 re-alignment of mirror was not immediately possible and therefore done in several attempts. Started from none position but went well at the end. 
- In SA2 re-alignment was not possible (settings of mirrors not ideal and therefore drop of beam intensity); In future a second attempt shall be made with the lessons learned. In SA1 went well.
- SA3 activities went well without problems.

LAS:
- From SQS high energy fluctuations were seen at PP-L and fixed after switching to another setting. 

UNSYS:
- Motor of monochromator of chicane 2 / SA2: remotely action did not recover it. Access is needed. Suren K. needs a 2-3 hours of access (realistic time) and there is no guarantee it will work.

SPB:
- Got beam at 24keV. 
- On Saturday a problem with camera Shimadzu not communicating to PLC was solved.
- Beam drift at downstream of SA1 (mm order) was seen.

FXE:
- Preparing for Users this week.
- Work with cabling ongoing.

MID:
- All fine.

HED:
- Having the 30keV beam and trying to align; Diffraction seen but could not say that the beam goes to the beam stop. Beam intensity too low for absorption edges.
- Preparing for Users this week.

SCS:
- Not present.

SQS:
- Nothing to report.
  270   20 Oct 2021, 10:28 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 20.10.2021
General Announcement:
- XO received some enquires on the status of the winter maintenance scheduling: We have about 750 tasks submitted and we are currently analyzing all of them to spot conflicts to be solved as well as 
identifying the infrastructure dates. 
In case you have any question or would like to bring any point to our attention, please feel free to contact us at XO. 

CTRL:
- Nothing to report.

DA:
- Today a minor update of offline calibration system occurs at 10:00. No service interruptions will happen.

EEE:
- From the PLC team: 1. An e-mail will be sent as reminder for tomorrow SA2 move2 update (together with XRO); 2. Today SA3 GATT EPS update will take place.

VAC:
- Not present.

XPD:
- XPD team is busy with the facility development week as well as with a beamtime at Flash.
- SA1 is setting up to 24keV. Is under tuning and has so far achieved 500uJ intensity

DET:
- Nothing to report.

ITDM: 
- All fine.

XRO:
- SA1 beam transport is aligned with 24keV beam.
- SA2 will be also aligned from today using 30keV beam.

LAS:
- Not present.

UNSYS:
- Issue with 1 motor in the chicane cell#18 / SA2 (crystal) that triggered the limit switch. The motor is stuck and an attempt to remotely fix it will take place.

SPB:
- From tomorrow SPB/SFX will work with beam.

FXE:
- Preparing activities and all is OK.

MID:
- All fine at MID.

HED:
- Nothing to report.

SCS:
- Nothing to report.

SQS:
- Nothing to report.
  269   18 Oct 2021, 10:14 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 18.10.2021
General Announcement:
-	 

CTRL:
- Nothing to report.

DA:
- On the mention of offline calibration being slow: DA reminds to call the DOC as soon as the issue occurs. It is hard to find root causes at a later time.

EEE:
- Issue with SCS Scannery: solved during the weekend and follow up further;
- Coax cable installation in FXE to start from this Tuesday 19.10.

VAC:
- Nothing to report.

XPD:
- No issues to report; This week XPD is involved at Hard X-rays activities with 24keV in SA1 and >30keV in SA2.

DET:
- Nothing to report.

ITDM: 
- Nothing to report.

XRO:
- Attempt to measure the beam position in SA2 this morning was missed as machine started to change parameters.

LAS:
- Not present.

UNSYS:
- Nothing to report.

SPB:
- Observed beam drift of up to 2mm on the 17.10; Theo M. confirms that horizontal direction moved up to 7mm at the XGM.

FXE:
- Nothing to add.

MID:
- All fine at MID; successful user beam time; Issues with Laser being helped during the weekend.

HED:
- Agipd-mini half back to HED; checked with DAQ; tests during this week.
- Also calibration for the single shot operation this week (Single shot with Agipd; picking only trains that have signal).
- Weekend to get 30keV beam: Zuzana K. is the main contact for communication and planning. 

SCS:
- Scanner-y issues: it does not run stable (not allowing to be used in automated motion); Beamtime successful.

SQS:
- Nothing to report.
  268   13 Oct 2021, 09:26 Andreas GallerGeneralInformationNotes XO Integration Meeting 13.10.2021

General Announcement:

  • This meeting is a tool to share information/experiences across scientific and technical groups

CTRL:

  • system are working

DA:

  •  

EEE:

  • next week
    • update on GATT and EPS loop in SA3 in roder to allow for new protection of GATT for the whole beaemtime
    • SA2 on Thursday (maybe Friday), try to correct backlash issue --> loop update

VAC:

  • all is running
  • HED VAC event
    • miscommunication between operators led to this issue

XPD:

  • no issue to report
  • next week, during the whole week there'll be a high photon energy test at SA1 and SA2 see a big involvement of XPD
    • 24 keV @SA1 (Tue)
    • ~30 keVC @ SA2 (Wed/Thu)
    • PI/Planner is Frank Brinker

DET:

  • investigating JF1M issue of 4-6Hz instead of 10 Hz operation

ITDM:

  • nothing

XRO:

  • SA1 M1/M2 drifts under investigation
  • XRO is involved as well with next weeks high photon energy effort as well as EEE loop updates

LAS:

  • sub sync

UNSYS: 

  • nothing

SPB/SFX:

  • user exp this week, 24 keV next week

FXE:

  •  

MID:

  • all fine at MID

HED:

  • next week high photon energy

SCS:

  • nothing to report

SQS:

  • next week material tests, maybe also detector group.

AOB:

  •  

  267   11 Oct 2021, 09:27 Andreas GallerGeneralInformationNotes XO Integration Meeting 11.10.2021

General Announcement:

  •  

CTRL:

  • nothing report

DA:

  • nothing to report

EEE:

  • several motors in SPB/SFX had trouble, all originating from the same crate

VAC:

  • VAC problems at HED last Wed
    • monochromator section in the tunnel, two unidentified vacuum bursts

XPD:

  • nothing to be reported

DET:

  • nothing to report

ITDM:

  • nothing to report

XRO:

  • FXE (PZ) reported a large jump in the bender setting, sebsequently Ry and pitch drifted for days and stabilized later
    • M1 M2 alignment changed as well
    • currently stable and being investigated

LAS:

  • nothing to report

UNSYS: 

  • nothing to report

SPB/SFX:

  • unstable pulse energy jittering ~ 35% over days.

FXE:

  • Experiment went well, apart from minor issue with calibration pipeline with JF

MID:

  • all fine

HED:

  • nothing to report

SCS:

  • not present

SQS:

  • not present

AOB:

  •  

  266   06 Oct 2021, 09:28 Andreas GallerGeneralInformationNotes XO Integration Meeting 06.10.2021

General Announcement:

  •  

CTRL:

  • nothing to report

DA:

  • nothing to report

EEE:

  • nothing to report

VAC:

  • nothing to report

XPD:

  • nothing to report

DET:

  • nothing to report (SPB reports JF1M issue --> suspected readout board issue)

ITDM:

  • issues with Nagios
    • misconfig by puppet mangement (DESY)

XRO:

  • nothing to report

LAS:

  • nothing to report
    • SA3 PPL up and running

UNSYS: 

  • Phaseshifter tables for higher energies in blue week had been uploaded
  • two quad movers from SA2 moved to 0
    • triggered by doocs --> quad movers moved back but it is unclear if they actually returned the BBA optimized position
    • clarification with M. Scholz confirms that quad movers did not move.

SPB/SFX:

  • JF
  • nothing to report

FXE:

  • User Experiment starts
  • C&C update requested until next week for LPD (uTCA)

MID:

  • all fine at MID

HED:

  • nothing to report

SCS:

  • not present

SQS:

  • nothing to report

AOB:

  •  

  265   04 Oct 2021, 09:30 Andreas GallerGeneralInformationNotes XO Integration Meeting 04.10.2021

General Announcements
none

 

CTRL
- late train IDs at XGM, being sorted

 

DA
- nothing to report

 

EEE

DET

ITDM
- nothing to report

XRO
-

LAS
- Failure of Power SUpply on AMPHOS in SA3, had been replaced over the weekend,
- observed jump on ODL in SA2 around midnight --> being investigated

UNSYS
- nothing to report
- PKG status to be discussed

 

SPB/SFX
- nothing major to report

 

FXE

 

MID
- Feedback for M2 stopped working, started calculating wrong values

HED
- nothing to report

SCS
- problems with DAQ: DA1 stuck --> DOC and ITDM are aware

SQS
- nothing to report

 

AOB

 

 

 

  264   29 Sep 2021, 09:49 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 29.09.2021
General Announcement:
- Tomorrow 30.09 is the deadline to submit the winter maintenance task list. In case of questions please do not hesitate in contacting XO.

CTRL:
- Nothing to report; systems are fine.

DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
•	Nothing to report.

XPD:
- High pulse energy in SA3: about 15-16mJ was seen at 1keV and XPD confirmed the accuracy of this value. By the other side, XPD is checking for potential damages in the YAG screens (not yet identified but 
this is close to the limit).
- A. Koch sent information on the screen limits and corresponding watchdogs. Info will be shared at the readiness mailing list.

DET:
- Nothing to report.

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.

LAS:
- Lasers are running. Question on spectral stability in SA3 from Monday: LAS investigated but they lack some diagnostics; LAS will need to work with SQS colleagues (Gotthard) to further complement 
diagnostic.

UNSYS:
- Alarm that PKG of SA3 is off. Nevertheless, SA3 is well performing with good temperatures.

SPB:
- Issue resolved by DRC in seeing the beam.

FXE:
- Nothing to report.

MID:
- All fine at MID; all in progress.

HED:
- Setting up experiment.

SCS:
- Progress with new setup.

SQS:
- Nothing to add; in touch with LAS.
  263   27 Sep 2021, 10:06 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 27.09.2021
General Announcement:
- The subscription for the User and Operation mailing list can be found at the regular announcements. Please forward the e-mail to new colleagues who are interested in getting the meeting link. 
- For any required operation that is not in the normal envelope, please keep in mind to discuss with XO in advance, to better planning and organization together with Desy-MXL / BKR colleagues. 
If possible, please let XO know with weeks in advance.

CTRL:
- No major updates from CTRL to be announced.

DA:
- Quiet blue week in terms of support.

EEE:
- Nothing to report.

VAC:
- Nothing to report for VAC.
- From PRC / Raul V.: photon intensity >15mJ in SA3 seems to be real. Spectrum analysis is under way and confirms >14mJ and it may be related to the chirp studies.

XPD:
- Self-seeding studies during the weekend (13keV @ HED): seeded signal of about 400mJ - data to be analyzed.

DET:
- Nothing to report.

ITDM: 
- Last week Gitlab update: some bug fixes were done during the weekend. In case of issues please let ITDM know. Gitlab is now available at the distributed link: gitlab.xfel.eu.

XRO:
- SA2 mirrors changed to platinum stripe.

LAS:
- Nothing to report.

UNSYS:
- Nothing to report.

SPB:
- Nothing to report.

FXE:
- Nothing to report.

MID:
- All fine at MID - thanks to XRO to have changed the optics.

HED:
- Nothing to report.

SCS:
- Nothing to report.

SQS:
- Issues with spectral stability of PP-lasers. To be addressed by LAS.
  262   22 Sep 2021, 09:47 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 22.09.2021
General Announcement:
- A reminder that in case staff members suffer from cold symptoms, please remain at home and do home-office.
- TS informs the restrooms at XHEXP1 are out of service. The fix is under way.

CTRL:
- Update of Beckhoff mc2 devices at all tunnels and experiments was done yesterday. No substantial problems occurred and first checks show also no issues. Please check if past configurations are used as it 
may cause a crash. 
- PP-Laser device (PPL multi-pattern device) will be update at instruments and down during this time. In case instruments do not want this upgrade, please contact CTRL / Valerii Bondar.
- No reports from DOC.

DA:
- Nothing to report.

EEE:
- Fast electronics: adding uTCA for SCS.
- Cabling installation at HED ongoing.

VAC:
- Nothing to report.

XPD:
- Yesterday ZZ with Gotthard was done and went as planned. It is now working nicely.
- XPD is prepared for the activities related to the blue/development week.
- Wavefront measurements were successfully done last Monday.

DET:
- First test of DSSC at SQS taking place today and tomorrow.

ITDM: 
- Reminder for the Gitlab update taking place tomorrow at 16:00.

XRO:
- Nothing to report.

LAS:
- Nothing to report.

UNSYS:
- Issue with SA3 quad movers that were blocked on Monday. A re-start of Movers and phase shifter was done which solved the issue.

SPB:
- Nothing to report.

FXE:
- Nothing to report.

MID:
- All fine at MID.

HED:
- Nothing to report.

SCS:
- Not present.

SQS:
- All good at SQS.
  261   20 Sep 2021, 10:19 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 20.09.2021
General Announcement:
- On last week's cryogenic failure at the machine: the root cause is tracked to a failed temperature sensor that bring down several pumps.

CTRL:
- Time slot for Beckhoff update of Mc2 motors is tomorrow between 09:30-11:00. This update is for all topics in tunnels and experiments. 
Change of parameters must not occur (for the ones which are stored in Beckhoff). Nevertheless, it is good for groups to check parameters that are not stored. 
An e-mail will be sent to communicate it and a second one when the update is finished.

DA:
- Nothing to report.

EEE:
- EEE supports the mentioned loop updates (care of PLC system).
- Cabling installation in FXE and HED have started and are ongoing during this week.

VAC:
- Nothing to report.

XPD:
- Nothing to report.

DET:
- Nothing to report.

ITDM: 
- Gitlab update takes this week, on Thursday at 16:00. An e-mail will be sent to readiness.

XRO:
- Nothing to report.

LAS:
- Nothing to report.

UNSYS:
- Nothing to report.

SPB:
- Nothing to report.

FXE:
- Stable operation during the weekend with a problem solved by DOC. A beam jitter was also observed on the weekend related to a feedback.

MID:
- All fine at MID.

HED:
- Finished user experiment; nothing to report.

SCS:
- Nothing to report.

SQS:
- Not present.
  260   15 Sep 2021, 10:37 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 15.09.2021
General Announcement:
- Machine stop running yesterday around 21:00 due to problems with the cold compression. A repair was done during the night but there are not yet stable conditions. It is unclear at what time today the 
machine will be back. 
By the other side, gun conditioning was done during the night which may help to have less gun trips.
- Steffen H. on behalf of DRCs reminds the instruments to please attend the jour-fix meeting on Mondays. 

CTRL:
- Beckhoff upgrade is set to take place next Tuesday 21.09 at 09:30 (during ZZ access). It relates to only Karabo devices with Mc2 motor loops; the PLC continues to run. 

DA:
- Nothing to report.

EEE:
- An update of SA2 motion loop to integrate the shutter / Gotthard is to take place next Tuesday 21.09 morning. Nerea J. will coordinate with CTRL (Valerii B.) and Naresh K. on the best time.

VAC:
- Nothing to report.

XPD:
- Nothing to report.

DET:
- Nothing to report.

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.

LAS:
- Reported last Monday that SA1 PP-laser was down due to air conditioning. In fact, it was a broker chiller that is repaired already Monday was a broker chiller. The PP-laser in SA1 is available since 
yesterday.

UNSYS:
- Nothing to report.

SPB:
- Change of setup happened yesterday. It will be ready for beam at 23:00 if possible.

FXE:
- Nothing to report; not yet clear if program will be affected due to the beam down.

MID:
- All fine at MID.

HED:
- Got beam yesterday morning and made use of it.
- Had issues with Interlocks (see operation-2021 e-log). A DACHS terminal stopped working and could not do hutch search. The Dachs terminal was replaced by Desy colleagues. 

SCS:
- Issue with the GATT mentioned last meeting: Jan-Torben D. has contacted XO (F. Wolff-Fabris). Discussions with further groups will take place.

SQS:
- Not present.
  259   13 Sep 2021, 10:04 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 13.09.2021
General Announcement:
-	 

CTRL:
- Next week CTRL will upgrade Beckhoff devices containing MC2 loops. This is done to avoid the PLC to crash. This is only Beckhoff devices and is for all tunnels and loops. This is a Karabo devices upgrade 
and not the PLCs. 
Naresh K. says systems are still needed on Monday morning. A. Galler tells that a ZZ will take place on Wednesday and this may be a better time for the update. XO and Valerii B. will discuss offline.

DA:
- Nothing particular; DOC and OCDs were quiet.

EEE:
- Nothing to report.

VAC:
- Yesterday effect of the power glitch at 15:03. VAC-OCD checked with SCS - the interlock reacted and GATT stopped for a while.
- SCS comments that the problem with GATT gave 300x more photons than expected to the sample and detector. A better safety / interlock is to be prepared. 
Raul V. says that topic was first discussed in 2019 with SQS (using the B4C block in the interlock loop for the GATT). It may require interaction from SA3 instruments, VAC, XRO, CTRL.

XPD:
- Small confusion on the SA3 XGMs during the weekend: BKR mixed the SCS and SQS XGM's not working and this triggered a few reactions on the weekend. A better way to do not mix up XGMs will be made. 
Please look to the right device before informing experts on possible errors.

DET:
- PnCCD detector is brought back to operation.

ITDM: 
- Next week (not yet date) a follow up of the Gitlab update will take place. Mostly likely on Wednesday; details will come by e-mail.
- Update of the GPFS metadata: to be replaced on a time without activity. Shall be transparent.

XRO:
- Nothing to report.

LAS:
- Lost SA1 PP-laser due to change of temperature and humidity at midnight this morning. No information when it will be made available for use.

UNSYS:
- Nothing to report.

SPB:
- Looks fine apart the fact it did get only 188 and not 202 bunches.

FXE:
- Nothing to report.

MID:
- All fine at MID - experiment running smooth; seeded beam running well. Only issue that Gotthard in tunnel has triggered Big Brother a couple of times. It was not a real signal. Naresh K. will talk to 
Ulrike B.

HED:
- All fine at HED.

SCS:
- Nothing else to add.

SQS:
- Successfully brought up pnCCD. It replaced physically one sensor. Reasons for the crash is understood at SQS (bad communication among the involved people). 
  258   08 Sep 2021, 10:06 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 08.09.2021
General Announcement:
- Quick report of yesterday incident of water running down to XHEXP1: a washing machine in the clean room at ground level leaked; the water went down to the SA4/5 area of XHEXP1. 
Both ground floor and XHEXP1 floors were wet. The washing machine is taken out of service.

CTRL:
- The ticketing system "control-integration" is working again and can be used.

DA:
- Nothing to report.

EEE:
- Fast electronics announcement: tomorrow late afternoon EEE will apply the fix to DSSC camera to correct train-IDs.

VAC:
- A test on the signal optimization in SA3 vacuum loop was done. VAC found a fix that will be applied during the shutdown (together with CTRL, EEE).

XPD:
- Nothing to report.

DET:
- pnCCD risk analysis: DET says that there is a path to avoid accident again and has been discussed with instrument. The misbehavior of the bottom module is to be investigated and replaced.

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.

LAS:
- Improvement of sync system in SA3 laser hutch took place this week. The laser is available to instruments.

UNSYS:
- Nothing to report.

SPB:
- Nothing to report.

FXE:
- Nothing to add.

MID:
- All fine at MID.

HED:
- Nothing to report.

SCS:
- Nothing to report.

SQS:
- Nothing to report.
  257   06 Sep 2021, 11:00 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 06.09.2021
General Announcement:
- XO thanks the instruments for posting in the Operations e-log.
- Jan G. says calorimeter measurements last Friday on HED hutch took place in order to measure transmission of pulse energy in the hutch and compare with tunnel HED-XGM. 
It is found a factor 2 loss - half beam intensity arriving at the end of the hutch. 
- Lorenz K. says that the Barista machine triggered a fire alarm. TN did a check and may be caused by the self-cleaning program of the machine by producing enough steam.
- Call for tasks to be carried on next Winter maintenance period were sent out to the are sent out via e-mail last Friday. Groups shall submit one group list by 30.09.2021.

CTRL:
- From tomorrow morning all the mails sent to the "controls integration" ticketing service will be offline due to an update. Please contact DOC instead. An e-mail will be sent as soon as the service is 
back.

DA:
- Nothing to report.

EEE:
- OCD calls from SQS last week were solved. 
- Nerea J. and F. Wolff-Fabris say the issue with SQS EPS is temporarily solved by now (masked signal at the Big Brother). SQS has to plan when it wants the EPS running.

VAC:
- Quiet week in terms of OCD.
- Today in the morning: please refrain to use this morning any SA3 device like GATT.

XPD:
- Nothing to report.

DET:
- Follow up of the pnCCD detector: upper part of the detector has scratches after Thursday accident. SQS will replace parts this week. The lower part of the detector has also some issues (noisy). 
It is unclear if the detector can be used.

ITDM: 
- Today and tomorrow ITDM carries the integration of the offline storage into the new system (new storage blocks; it shall be unnoticed by the users). The old one goes out by replacement.

XRO:
- Apart of the beam point instability @ HED (stochastic instabilities that appear from time to time) there is nothing else to report.

LAS:
- Change repetition rate at SA2 PP-laser this week.
- SA1 has a higher jitter than normal that has to be investigated on-site.

UNSYS:
- All fine at Undulators.

SPB:
- Running night shifts: on SAT night some X-ray trains not arriving; It did not disturb operation but a bit disturbing.

FXE:
- Lost of pulses and many issues on Saturday such as instability and tuning without prior communication. To FXE team.
- F. Wolff-Fabris says the beam became more stable on Sunday afternoon after the restart of a server and the feedback for the compression.

MID:
- All fine at MID.

HED:
- Suffered from beam jitter: measurements were done with different mirrors settings, CRL configs; MID branch. Analysis ongoing this week (Sebastian Goede).

SCS:
- Nothing to report.

SQS:
- Nothing to report.
  256   01 Sep 2021, 10:36 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 01.09.2021
General Announcement:
- A change of meeting room occupancy will happen soon (increase by some %) and will be posted at each meeting room door. 

CTRL:
- Together with EEE, CTRL updated the pnCCD system and is working again. Hardware train-IDs acquisition was used by SQS yesterday afternoon and was successful.

DA:
- Nothing to report.

EEE:
- Nothing special to report.

VAC:
- Nothing to report.

XPD:
- Nothing to report.

DET:
- Follow up for the pnCCD today (offline calibration fixed). Detector is being cooled down and then data will be collected. DET supports CTRL that one had to make better plan earlier.

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.

LAS:
- Nothing to report.

UNSYS:
- Nothing to report; Cell#16 in SA3 got repaired on Monday.

SPB:
- Nothing to report.

FXE:
- Nothing to report.

MID:
- All fine at MID.

HED:
- Yesterday the beam was available for delivery later than 15:00 due to issues with machine tuning.

SCS:
- Not present.

SQS:
- Not present.
  255   30 Aug 2021, 10:08 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 30.08.2021
General Announcement:
- XO will send next Wednesday the call for the Winter maintenance tasks. This time there will be a ticketing system and the call will be also send to Readiness list but please check with your group leader 
to submit a single task list per group.
- Please we ask instruments to place shift summaries at the Operations E-log.
- Suren K. asks TS for the trainings of TS staff as some people do not have access to tunnels areas. Lorenz K. will verify with TS members.

CTRL:
- Broker pileup issue at FXE on Wednesday: resolved with tracing on specific devices. Work is ongoing to prevent future incidents.

DA:
- Nothing to report.

EEE:
- Test on turbo pump on SQS to take place (by Bernard B. and VAC).

VAC:
- Nothing to report besides the test. This morning also a PLC test takes place.

XPD:
- Nothing to report.

DET:
- Nothing to report.

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.

LAS:
- Nothing to report.

UNSYS:
- There is a problem with cell#16/SA3. A ZZ is currently ongoing to fix it.

SPB:
- Nothing to report apart of the intensity slope last week. It was improved during the weekend but still an issue for data collection.

FXE:
- Nothing to report.
- BYU trigger delay change was observed: it was fixed but root cause still to be found.

MID:
- Problem with AGIPD processing data (automatic calibration did not work): under analysis/fix.

HED:
- Not present.

SCS:
- Strong contribution of SA1 dedicated bunches last week; one need to have zero bunches at SA1 to be able to see the SA3 beam. Not interleaved mode may solve it but was not yet tested/tried.

SQS:
- Nothing to report.
  254   25 Aug 2021, 10:08 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 25.08.2021
General Announcement:
- A power glitch happened this morning at around 5:46AM. The drop of voltage was seen in two stations (about 0.6kV) and it's smaller than the last Monday's one. In case groups find affected systems, please 
let XO know.

CTRL:
- Last night DOC informed on a Broker pileup at FXE. The FXE loop was restarted and mitigated the situation. Further investigations are ongoing and will be coordinated with FXE.

DA:
- Nothing to report.

EEE:
- EEE helps on the Loop 6 pileup reported by CTRL.
- Call from DOC reporting connection issue to Karabo (broker PLC was replaced and had to be configured the connection).

VAC:
- Effects of power glitch seem to be none. Cooling water for the vacuum systems was not affected.

XPD:
- XGM in SCS being offline due to surge of pressure. This was informed by e-mail from SCS last night; interlock tripped due to high-voltage. XPD checked and put back during the night. 
Laurent M. says it was not clear why the pressure was increased. It is under investigation and SCS will inform XPD.

DET:
- Nothing to report.

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.

LAS:
- Amphos were not switched OFF due to power glitch. PP-laser in SA3 are under maintenance.

UNSYS:
- Nothing to report.

SPB:
- Issue with EPS at 14:10 yesterday: beam permission was blocked by EPS despite both shutters closed and all gate valves open. The signals had to be manually restarted (this info was not transmitted and 
EPS blocked beam permission). 
Issue appeared when they use beam for the first time; EEE / Nerea J. will further investigate.

FXE:
- Nothing to report.

MID:
- After the power glitch the SA2 beam intensity decreased by 10%. BKR will not do any interaction right now. It is still fine for MID to work in such conditions.

HED:
- Nothing to report.

SCS:
- Apart of the XGM issue, nothing else to add.

SQS:
- Nothing to report.
  253   23 Aug 2021, 10:03 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 23.08.2021
General Announcement:
- There were two minor power glitches on Saturday morning but with negligible effects to machine.

CTRL:
- Nothing to report.

DA:
- Nothing to report.

EEE:
- Update of EPS-SA1 loop was done this morning in order to enable the FXE imagers modes.

VAC:
- Nothing to report.

XPD:
- Nothing to report.

DET:
- DSSC is installed back to SCS and put into operation last Friday.

ITDM: 
- Nothing to report.

XRO:
- Not present.

LAS:
- All AMPHOS are ON and LAS is preparing PP-lasers for instruments today.

UNSYS:
- Issue with cell5/SA1 phase shifter: M. Yakopov confirms a power cycle was made to recover it.

SPB:
- Problem with Karabo (misread 2 of vacuum gauge values): the problem was a terminal of the crate was broken. After the terminal has changed, it works fine. 

FXE:
- Nothing to report.

MID:
- All fine at MID.

HED:
- Nothing to report.

SCS:
- Nothing to report.

SQS:
- Nothing to report.
  252   18 Aug 2021, 10:48 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 18.08.2021
General Announcement:
- In the aftermath of the severe power glitch, XO will be grateful if groups drop a message of what was affected in your groups. This will help us to understand effects of the latest power glitch.
- Status of machine: last night we had 2.3mJ in SA3 and 0.5mJ in SA1. Right now machine is under tuning - good chance of beam available for FDs today.

CTRL:
- Follow-up to the power glitch. CTRL had to restart the Karabo systems due to the main network to the brokers being down for minutes. Few follow-ups later that day but in general things have recovered. 
If groups experience troubles after running systems, please write ticket to CTRL.

DA:
- DA has deployed at SPB the latest Karabo 2.11.4. This concludes the cycle to all instruments.

EEE:
- Nerea J. informs Andreas K. detected that FXE imagers needs to be debugged by restarting the EPS loop. This will take out beam permission and may be organized for Monday morning. 
- Clock and control system was downgraded (confirmation from Bruno F.).

VAC:
- Nothing to report.

XPD:
- XPD had to restart manually many devices, macros and MDLs. One had to fix the broken Karabo bridges.
- No hardware and XGM gas supply were affected; they are running fine.
- SASE recovery only happened Tuesday afternoon and FD in SA2 was cancelled.
- A. Koch asks if Monday it is a good day for the IMG intervention. XO will check with MXL.

DET:
- AGIPD in SPB was the only detector ON during the power outage. It quickly recovered as it was in power voltage.
- DSSC being moved this week among SA3 instruments.

ITDM: 
- Network issue due to the power glitch (distribution layers switchers); connectivity of different parts of network affected. This in turn affected Karabo. 
- Gitlab upgrade today at 13:00.

XRO:
- M. Vannoni informs that to evaluate better tunnel devices (initially seems OK), one needs the beam back to check them in full.

LAS:
- PLCs and Karabo issues were found; in touch with EEE to make redundant power supply to PLCs. 
- Lasers went OFF and plan is to have PP-Ls available by Friday evening.

UNSYS:
- Problem with SA1/cell27 on Monday as motor drivers went in error state after the power glitch. It was recovered remotely. 
- Tables for 3keV @ 14GeV were updated on Monday.

SPB:
- Problem with Karabo and vacuum gauges (EEE is working on them).
- Problem with PP-laser shutter last week (unable to set interlock). It is now solved.

FXE:
- Detectors were OFF and therefore no issues due to the power glitch.
- Similar Karabo problems as described earlier.

MID:
- All fine at MID. Summary will of the effects of power glitch will be sent soon to XO.

HED:
- Lost the tests for the wavefront sensor as machine was down (FD). Plan to use beam tonight if it comes back. On Friday Karen A. plans to use beam for tests.
- Ulf Z. has sent a report to XO; Detectors were OFF and unaffected.

SCS:
- Not present.

SQS:
- Not present.
ELOG V3.1.4-7c3fd00