659
|
22 Oct 2025, 09:47 |
Frederik Wolff-Fabris | General | Information | Notes XO Integration Meeting 22.10.2025 |
General Announcement:
- M. Doering announces on the LIMP-25 for next week:
1. Update on air conditioning issues: was repaired on Monday and is back in operation;
2. Karabo update: planned to come to an end during next week;
3. After Karabo3 is done then PLC updates will start;
4. HED radiation Interlock tests to be conducted on 29.10.
- Tobias C. informs on the gas monitoring system: Draeger company is onsite and work is continuing and there is a chance to still finish this week. Sirens were tested while people were not informed -
Tobias C. will discuss with workers.
- Kristina Lorenzen mentions that SRP can be contacted if gases are needed in the meantime. It is obligatory to contact SRP if gases are needed before the work mentioned by Tobias C. is finished.
- The XO integration elog will be moved to ZULIP / Metadata today. Link will be prepared and distributed by XO.
- Daniele La Civita raises two points:
1. Are CTRL and PLC available in tunnels in November? CTRLs will be ready and no deployments are scheduled for end of October in tunnels. So they shall be available for testing new devices;
2. XTD10 tunnel is closed due to the cabling installation: Cycling is not permitted and barriers shall not be removed. One still can go by foot and check if someone can pass through.
The activity is planned to finish by end of next week. Please contact XO is work in XTD10 has to be done by other groups.
CTRL:
- Tests with Karabo3 at FXE and SPB will be done;
- Continuing with migration of systems;
- Update by end of this week.
DA:
- All quiet at DA.
EEE:
- Remind that timing interruption will happen tomorrow, 23.10, between 9AM and 3PM.
VAC:
- Nothing to report.
XPD:
- Nothing to report.
DET:
- Apart of Surprised of loss of nitrogen in clean room, all fine.
ITDM:
- Humidity in balcony room 28 (SA2) is too high (in touch with Tobias Clever). Oxygen exchange is also not working - please get door open if one works inside this balcony room.
- Interruption of myMDC next Friday for upgrade.
XRO:
- Nothing to report.
LAS:
- Not present.
UNSYS:
- All fine.
SPB:
- Nothing to report.
FXE:
- Nothing to report.
MID:
- All fine at MID.
HED:
- Not present.
SCS:
- Nothing to report.
SQS:
- Nothing to report.
SXP:
- All fine. |
|
658
|
20 Oct 2025, 09:17 |
Andreas Galler | General | Information | Notes XO Integration Meeting 20.10.2025 |
General Announcement:
- the XO integration elog will move to Zulip / Metadata on Wednesday
- Martin updates
- humidity control in precision air conditioning is currently impeded due to a broken controller.
- Gas Monitoring System still out of service --> in case gases are needed pleasd contact SRP and prepare a risk assessment
CTRL:
- LA3 + all lab topics karabo are entering 3 delpoyment/testing
DA:
EEE:
- timing interruption on Thursday between 9:00 and 15:00
- SASE3 Tunnel PLC CPU maintenance will commence once karabo 3 is stable
VAC:
XPD:
DET:
- oxygen sensor to be installed E0.606
ITDM:
- dCache upgrade, max 1hour tomorrow morning
XRO:
- no urgent things to report
- mirror installations a bit slower than expected
-
LAS:
UNSYS:
SPB/SFX
FXE:
MID:
HED:
- hihgher humidity in hutch, see above
SCS:
SQS:
SXP:
DRC
PRC
AOB:
|
|
657
|
15 Oct 2025, 09:25 |
Andreas Galler | General | Information | Notes XO Integration Meeting 15.10.2025 |
General Announcement:
- Martin shows the preview for cw43
- Karabo 3 deploymebt ongoing
- Interruption of the main 1.3 GHz main referenfce
- Th. 23.10.25 from 9:00 - 15:00 --> requests for standalone? if yes, please contact xo-planning@xfel.eu or M. Doering directly
- electrical safety inspection and testing in XTDs
- SPIE starts testing in XTD1 & XTD2, testing all racks (CW42)
- EuXFEL will stay powered and Electrants won't be switched off --> please contact A. Albrecht (EEE) in case of questions
-
CTRL:
- proceeeding well with karabo 3 tests, LA1, LA2, HED
DA:
EEE:
- nothing specific
- troubleshooting issues with karbao 3 but nothing major
VAC:
- XTD1
- preventive maintenance -- caused valve closing at XGM --> Nerea & Theo supported
XPD:
- nothing to report
- XPD kindly to inform PES and XPD responsible people if works are suspected to close valves in the vicinity of PES or XGM
DET:
ITDM:
XRO:
LAS:
UNSYS:
SPB/SFX
FXE:
MID:
HED:
SCS:
SQS:
SXP:
DRC
PRC
AOB:
|
|
656
|
13 Oct 2025, 09:39 |
Frederik Wolff-Fabris | General | Information | Notes XO Integration Meeting 13.10.2025 |
General Announcement:
- Tobias Clever informs on the gas maintenance system: the central gas supply is currently disconnected;
One shall not bypass it by installing other gas bottles as the gas monitoring alarm is not working and thus pose a safety threat if leakage happens.
By the end of this week the activity is completed and possibly by mid of the week gas may be available again.
CTRL:
- Proceeding with tests of Karabo3; some instruments will be contacted this week for tests.
DA:
- All fine.
EEE:
- Nothing to report.
VAC:
- Nothing to report.
XPD:
- Nothing to report.
DET:
- Question on gases activity: XHQ lab areas are also affected, including clean rooms.
ITDM:
- E-mail will be sent later informing on next week's (Tuesday) interruption of DAQ storage due to a maintenance.
XRO:
- Not present.
LAS:
- Timing issues were happening but solved with help from EEE.
UNSYS:
- Nothing to report.
SPB:
- Nothing to report.
FXE:
- Nothing to report.
MID:
- All fine; no issues.
HED:
- Nothing to report.
SCS:
- Nothing to report.
SQS:
- Nothing to report.
SXP:
- Nothing to report. |
|
655
|
08 Oct 2025, 09:45 |
Frederik Wolff-Fabris | General | Information | Notes XO Integration Meeting 08.10.2025 |
General Announcement:
- M. Doering announces on the LIMP-25:
1. Karabo deployment ongoing;
2. PLC updates see works at FXE, HED for next week cw42 (SQS later time);
3. Central gas management will be implemented by TS - Tobias Clever informs that since yesterday company is onsite for programming the system changes. For the next couple of days
a short interruptions of gases bottles may happen and to be finished by the end of next week.
- On Monday M. Doering sent an e-mail regarding the next Winter maintenance "light" for recurring activities that always happens during a regular winter maintenance.
If groups have new tasks (unknown by the planning phase of the LIMP) that shall be done prior the start of operation, please let M. Doering know, especially if may affect other
groups.
For example, emergency OFF will be triggered in SA1 and SA2 instruments as well as cooling water will be interrupted for one day.
CTRL:
- Proceeding with Karabo updates.
DA:
- Nothing to report.
EEE:
- Timing system update happening at SA3 instruments today.
VAC:
- Not present.
XPD:
- Nothing to report.
DET:
- Nothing to report.
ITDM:
- Nothing to report.
XRO:
- Everything fine; yesterday the work in pre-absorber was finished well.
- This week the pre-alignment of ODL in SA3 is planned to be finished and then Vacuum can be closed.
LAS:
- Nothing to report.
UNSYS:
- Nothing to report.
SPB:
- Nothing to report.
FXE:
- Nothing to report.
MID:
- Nothing to report.
HED:
- Not present.
SCS:
- Next week works on the hutch will be made by an external company (area to be fenced). Please contact Jan Torben if access is needed.
SQS:
- Not present.
SXP:
- Nothing to report. |
|
654
|
06 Oct 2025, 09:45 |
Frederik Wolff-Fabris | General | Information | Notes XO Integration Meeting 06.10.2025 |
General Announcement:
- M. Doering announces on the LIMP-25:
1. Pressurizer exchange is postponed from today to a date likely in two weeks, to be informed;
2. Magnet cabling in XTD10 starts on Wednesday and pre-absorber work must finish before (see VAC/XRO);
3. News on timing system (see EEE).
CTRL:
- Preparing for Karabo3 rollout as scheduled.
DA:
- Nothing to report.
EEE:
- Update of timing system is scheduled for today after lunch. Groups are informed.
- PLC side: SPB and MID tests are ongoing.
VAC:
- XTD10 pre-absorber works: XPD part is done and VAC has to extract the pre-absorber and seal the vacuum, no issues to do in the next two days to avoid collision with magnet cabling.
XPD:
- Nothing to report.
DET:
- Nothing to report.
ITDM:
- Nothing to report.
XRO:
- Nothing to report; pre-absorber work is ongoing well.
LAS:
- Nothing to report; no collisions with timing update.
UNSYS:
- Nothing to report.
SPB:
- Nothing to report.
FXE:
- Nothing to report.
MID:
- All fine at MID.
HED:
- Nothing to report.
SCS:
- Nothing to report.
SQS:
- Nothing to report.
SXP:
- All fine at SXP. |
|
653
|
01 Oct 2025, 09:47 |
Frederik Wolff-Fabris | General | Information | Notes XO Integration Meeting 01.10.2025 |
General Announcement:
- M. Doering announces on the LIMP-25 for next week:
1. PLC updates in SA2 and SA3 tunnels (HED postponed to later week);
2. Karabo deployment happening (no availability);
3. Timing system update on Tuesday from 09:00 to 16:00 with interruptions during this time;
4. MKK maintenance on pressurizer for 8C water (e-mail to be sent - please avoid changes on cooling water on Monday);
5. Magnet cabling in XTD10 starts on Wednesday 08.10.
- M. Prollius says hot work permits are allowed again.
- I. de Diego says D3 will be testing AIBS / air boxes systems in SA3 experiments tomorrow (access is required).
- Nerea Jardon says please contact EEE if EEE systems need to be operated during the time Karabo is down.
CTRL:
- Preparing for Karabo3 rollout from today.
DA:
- Nothing to report.
EEE:
- Delay on PLC CPU replacement in tunnels: to be done after Karabo is back.
- Timing systems have to be updates - discussed with LAS already and fine with them.
VAC:
- Everything fine.
XPD:
- Nothing to report.
DET:
- Nothing to report.
ITDM:
- Long standing issue with SA2 storage system: needs to power cycle system probably tomorrow or Monday, when Karabo is anyway down.
- Update PCs in experiment Hall next week.
XRO:
- Not present.
LAS:
- Nothing to report.
UNSYS:
- Not present.
SPB:
- Nothing to report.
FXE:
- Nothing to report.
MID:
- Nothing to report.
HED:
- Nothing to report.
SCS:
- Nothing to report.
SQS:
- Not present.
SXP:
- Nothing to report. |
|
652
|
29 Sep 2025, 09:50 |
Frederik Wolff-Fabris | General | Information | Notes XO Integration Meeting 29.09.2025 |
General Announcement:
- On the LIMP-25: the XS4 shaft building elevator is not working and repair is to be done. Please use other shaft buildings or ways when accessing SA2 tunnel with equipment.
CTRL:
- From 01.10 Karabo will be unavailable due to scheduled necessary upgrade.
DA:
- Nothing to report.
EEE:
- Working on ODL SA3; continuing replacing CPUs in SA1 and SA2; and bringing up SQS parts this week.
VAC:
- All fine from VAC.
XPD:
- Nothing to report.
DET:
- Nothing to report.
- Power cuts on the X-ray sources: it was tested and both source and detector are working nice. No effects from that power cut.
ITDM:
- Cisco VPN is disconnected due to security issues and currently there is no info when might be available again. Please use other options such as eduVPN in the meantime.
XRO:
- Not present.
LAS:
- Nothing to report.
UNSYS:
- Not present.
SPB:
- Nothing to report.
FXE:
- Nothing to report.
MID:
- Nothing to report.
HED:
- Not present.
SCS:
- Nothing to report.
SQS:
- Nothing to report.
SXP:
- Nothing to report. |
|
651
|
24 Sep 2025, 09:43 |
Frederik Wolff-Fabris | General | Information | Notes XO Integration Meeting 24.09.2025 |
General Announcement:
- Martin Doering announces for next week's LIMP-25:
1. PLC updates to be continued in SA3 tunnels and instruments;
2. Karabo3 deployment starts facility wide with services being stopped;
3. ITDM will update and replace machines.
- Timing system maintenance will from Desy will interrupt the 1.3GHz RF main refence signal tomorrow, 25.09; in October a full maintenance will be done during the first two weeks.
Date(s) to be announced by XO when know. In case of date restrictions from EuXFEL groups, please contact XO.
CTRL:
- Nothing major to report. Tomorrow timing is required and may be provided by EEE, to be discussed offline.
DA:
- Nothing to report; calibration pipelines are being updated during the LIMP-25.
EEE:
- Nothing to report.
VAC:
- Not present.
XPD:
- Activities are ongoing.
DET:
- Tomorrow Karabo3 with AGIPD is planned to be tested; thus timing needs to be simulated (Train IDs) if not available.
ITDM:
- Nothing to report.
XRO:
- Not present.
LAS:
- Not present.
UNSYS:
- Not present.
SPB:
- Nothing to report.
FXE:
- Nothing to report.
MID:
- Nothing to report.
HED:
- Not present.
SCS:
- Not present / nothing to report.
SQS:
- Not present.
SXP:
- Nothing to report. |
|
650
|
22 Sep 2025, 09:42 |
Frederik Wolff-Fabris | General | Information | Notes XO Integration Meeting 22.09.2025 |
General Announcement:
- Construction noises heard at XHQ 2nd floor comes from HXS works at the experimental Hall.
- Tobias Clever: a power glitch was seen on Sunday around 17:00 and some pumps supplying cooling water to XHQ level 0 were affected; also ventilation at the buildings was affected.
TS OCD could restore the pumping system before temperatures have rising.
CTRL:
- Proceeding well with Karabo3 tests at MID.
DA:
- Nothing to report.
EEE:
- Continue with maintenance at SA2 PLC systems.
- SA3 undulators will be also upgrades.
VAC:
- Nothing to report.
XPD:
- Nothing to report; everything ongoing as planned; all normal with XGM pressure.
DET:
- Nothing to report; AGIPD 4M: to be discussed offline.
ITDM:
- Nothing to report.
XRO:
- Nothing to report.
LAS:
- Not present.
UNSYS:
- Everything is fine; installation in SA2 is ongoing.
SPB:
- Nothing to report.
FXE:
- Not present.
MID:
- All fine at MID.
HED:
- Nothing to report.
SCS:
- Not present - nothing to report.
SQS:
- Nothing to report.
SXP:
- Nothing to report. |
|
649
|
17 Sep 2025, 09:40 |
Frederik Wolff-Fabris | General | Information | Notes XO Integration Meeting 17.09.2025 |
General Announcement:
- F. Wolff-Fabris comments on the LIMP-25: for cw38 schedule sees:
1. the PLC updates as main activity;
2. Karabo upgrade in October with tests being carried out this week at MID;
3. One pump in the KW20 circuit is being serviced from today (17.09) and thus no redundancy exists for one week. The KW20 water is supplied normally in this period.
- Two short power glitches were detected at DESY yesterday (17.09) morning. We are not aware of any disturbances at the campus but please let XO know if you were affected.
CTRL:
- Started MID migration last Monday and Tuesday. It was successful and no major issues happened, only few devices still missing; minor issues with Beckhoff. All identified and a fix to be done
today/tomorrow.
DA:
- Nothing to report.
EEE:
- Nothing to report.
VAC:
- Not present.
XPD:
- Nothing to report.
- PLC was updated in SA1 and VC loop also. Few hours of pressure increase but still manageable and went fine.
DET:
- Nothing to report.
ITDM:
- Nothing to report.
XRO:
- Not present.
LAS:
- Not present.
UNSYS:
- Everything is fine; Installation is ongoing.
SPB:
- Nothing to report.
FXE:
- Nothing to report.
MID:
- All fine at MID.
HED:
- Not present.
SCS:
- Not present.
SQS:
- Not present.
SXP:
- Not present. |
|
648
|
15 Sep 2025, 09:45 |
Frederik Wolff-Fabris | General | Information | Notes XO Integration Meeting 15.09.2025 |
General Announcement:
- On the LIMP25, no news apart of what was mentioned last week by Martin Doering (see 10.09 minutes)
- Inaki de Diego informs that AIBS and airboxes installation is completed, with the exception of HED, where there is a problem with a cable (or connector) that needs to be
fixed by MPS during the next days.
It will be confirmed when fixed/done.
CTRL:
- Today proceed with test deployment at MID.
DA:
- Nothing to report.
EEE:
- PLC team starting to replace the PLC CPUs with SA1 after agreement with instruments.
VAC:
- Not present.
XPD:
- Nothing to report.
DET:
- Nothing to report.
ITDM:
- Nothing to report.
XRO:
- Nothing to report.
LAS:
- Not present.
UNSYS:
- All proceeding and the hardware is prepared; only waiting for construction/MEA work.
SPB:
- Nothing to report.
FXE:
- Thanks to Hall crew who helped with craning.
MID:
- All fine; Temperature in the control hutch to be addressed today.
HED:
- Not present.
SCS:
- Not present.
SQS:
- Nothing to report.
SXP:
- Nothing to report. |
|
645
|
10 Sep 2025, 10:31 |
Frederik Wolff-Fabris | General | Information | Notes XO Integration Meeting 10.09.2025 |
General Announcement:
- M. Doering announces on the LIMP-25:
1. XTD10 Scaffolding is installed for cabling work in October;
2. PLC updates: remaining work in tunnels to be done next week (discussed with VAC and XPD) as well as at SQS;
3. Update task list: M. Doering will send to the groups the Task list for that it is updated accordingly to the latest status (e.g. completed, cancelled, delayed...);
4. Recurring tasks for the Winter Maintenance will be planned for the end of the year. A list will be sent to the groups and please inform XO if you have new activities to be done before 2026.
CTRL:
- Karabo upgrade: start with MID next week to spot possible issues. MID topic will be accessible from the hutch only.
DA:
- Nothing to report.
EEE:
- PLC updates: see above.
VAC:
- Everything progressing well in XTD6 also with PLCs.
XPD:
- Nothing to report.
DET:
- Nothing to report; starting AGIPD at MID before Karabo is down in October.
ITDM:
- Nothing to report.
- Fast-X gateway upgrade last week is done.
XRO:
- Busy with SA1 activities.
LAS:
- Not present.
UNSYS:
- Delays with water and cable from Desy groups; but all ongoing.
SPB:
- Not present.
FXE:
- Nothing to report.
MID:
- MID control room is very warm: needs to check temperatures in control room; Gerd W. says technical infrastructure needs to be modified.
HED:
- Nothing to report.
SCS:
- Issue with installation of beam stop and AIBS position.
SQS:
- Not present.
SXP:
• Not present. |
|
644
|
08 Sep 2025, 09:42 |
Frederik Wolff-Fabris | General | Information | Notes XO Integration Meeting 08.09.2025 |
General Announcement:
- Regarding LIMP-25, there is nothing different apart of what was already mentioned on Wednesday for this week cw37.
CTRL:
- Nothing to report.
DA:
- Nothing to report.
EEE:
- Nothing to report.
VAC:
- Nothing to report.
XPD:
- Nothing to report.
DET:
- Nothing to report.
ITDM:
- Activity with electricity in Balcony room 30 was finished on Friday. DESY crates can be switched on again.
XRO:
- Not present.
LAS:
- Not present.
UNSYS:
- Everything is fine.
SPB:
- Nothing to report.
FXE:
- Nothing to report.
MID:
- All fine.
HED:
- Nothing to report.
SCS:
- Nothing to report.
SQS:
- Not present.
SXP:
- Nothing to report. |
|
643
|
03 Sep 2025, 10:29 |
Frederik Wolff-Fabris | General | Information | Notes XO Integration Meeting 03.09.2025 |
General Announcement:
- LIMP-25: next week cw37 sees the PLC updates starting in SPB/SFX and SQS; also the re-installation of AIBS will be completed.
CTRL:
- Nothing to report.
DA:
- Nothing to report.
EEE:
- Nothing to report.
VAC:
- Not present.
XPD:
- Not present.
DET:
- Nothing to report.
ITDM:
- Upgrade of Fast-X gateway: to be done this week. When finished, an e-mail will be sent to xo-info.
XRO:
- Not present.
LAS:
- Not present.
UNSYS:
- Nothing to report.
SPB:
- Nothing to report.
FXE:
- Nothing to report.
MID:
- All is fine.
HED:
- Nothing to report.
SCS:
- Nothing to report.
SQS:
- Nothing to report.
SXP:
- All fine. |
|
642
|
01 Sep 2025, 09:37 |
Frederik Wolff-Fabris | General | Information | Notes XO Integration Meeting 01.09.2025 |
General Announcement:
- There are no general updates regarding LIMP-25.
CTRL:
- No major updates from CTRL.
DA:
- Nothing to report.
EEE:
- PLC updates in tunnels: coordinating with VAC and XPD and updates are still ongoing this week.
VAC:
- Nothing to report.
XPD:
- Nothing to report.
DET:
- Nothing to report. All fine.
ITDM:
- Nothing to report.
XRO:
- Nothing to report.
LAS:
- Nothing to report.
UNSYS:
- Nothing to report.
SPB:
- Nothing to report.
FXE:
- Nothing to report.
- Construction of 2nd control hutch at FXE is ongoing accordingly to the plan.
MID:
- All fine at MID.
HED:
- Not present.
SCS:
- Nothing to report.
SQS:
- Not present.
SXP:
- Nothing to report. |
|
641
|
27 Aug 2025, 09:30 |
Andreas Galler | General | Information | Notes XO Integration Meeting 27.08.2025 |
General Announcement:
- Martin shows the preview for cw36,
- Implementation of central gas management
- safety lights maintenance
CTRL:
DA:
EEE:
VAC:
XPD:
DET:
ITDM:
XRO:
LAS:
UNSYS:
SPB/SFX
FXE:
MID:
HED:
SCS:
- small leakage yesterday in th ooling water circuit for the Turbo Pumps in the experiment
SQS:
SXP:
DRC
PRC
AOB:
|
|
640
|
25 Aug 2025, 09:28 |
Andreas Galler | General | Information | Notes XO Integration Meeting 25.08.2025 |
General Announcement:
- Martin Doering
- XTD6 today maintenance of cooling water pumps --> fluctuations can occur
- Safety: a couple of EPDs have not been logged out
CTRL:
DA:
EEE:
- Tunnel PLCs
- issues are being addressed with VAC & CTRLs
- FXE&SPB?SFX Beckhoff CPUs to be replaced
VAC:
XPD:
DET:
ITDM:
XRO:
LAS:
UNSYS:
SPB/SFX
- AIBS work will happen this week
- 4M installation infrastructure going forward as planned
FXE:
MID:
HED:
SCS:
SQS:
SXP:
DRC
PRC
AOB:
|
|
639
|
20 Aug 2025, 09:43 |
Frederik Wolff-Fabris | General | Information | Notes XO Integration Meeting 20.08.2025 |
General Announcement:
- Martin Doering announces on the LIMP-25 (Main infrastructure works are ending in general):
1. Water related activities will be finished this week;
2. Air conditioning will work again next week;
3. Guest House also will be opening again next week;
4. Electricity: tasks are finishing next week and minor tasks in SA1 and SA3 instruments will be discussed to be scheduled in future;
5. PLC updates are still ongoing in tunnels over next week;
6. AIBS and Air Boxes will be reinstalled next week;
7. MKK2 cooling water pump replacement in XHEXP1 takes place (there is a redundant pump system so it is a task without impact).
- M. Prollius says the NDR TV crew will be at XFEL after lunch and will go to XTD1 by 13:00, maybe also at XHEXP1.
CTRL:
- Nothing to report.
DA:
- Nothing to report.
EEE:
- Nothing apart of the PLC updates (see above).
VAC:
- Not present.
XPD:
- Nothing to report.
DET:
- X-ray pulse source that suffered from the power cut: depends on experts return from holidays.
ITDM:
- Nothing to report.
XRO:
- Not present.
LAS:
- Nothing to report.
UNSYS:
- Not present.
SPB:
- Nothing to report.
FXE:
- Not present.
MID:
- Nothing to report.
HED:
- Not present.
SCS:
- Not present.
SQS:
- Nothing to report.
SXP:
- All good at SXP. |
|
638
|
18 Aug 2025, 09:36 |
Frederik Wolff-Fabris | General | Information | Notes XO Integration Meeting 18.08.2025 |
General Announcement:
- O. Bilani informs transport and crane activities are being made at truck bay today. Please be careful when walking around.
- M. Prollius informs on Wednesday afternoon the NDR is making footages at undulator tunnels, organized by COMS.
CTRL:
- Nothing major to report.
DA:
- Nothing new / to report.
EEE:
- Work on PLC updates this week in tunnels and then moving forward to instruments.
VAC:
- Nothing to report.
XPD:
- Nothing to report.
DET:
- Not present.
ITDM:
- Nothing to report.
- Maxwell upgrades went fine and hiccups were fixed successfully.
XRO:
- Not present.
LAS:
- Nothing to report.
UNSYS:
- Nothing to report.
- Alignment MEA started working with UNSYS tasks.
SPB:
- Nothing to report.
FXE:
- Not present.
MID:
- All fine at MID.
HED:
- Not present.
SCS:
- Nothing special to report.
SQS:
- Nothing to report.
SXP:
- Everything fine for SXP. |