Group Selection Page HELP DOC Controls Group Data Analysis Group ITDM WP76 DET Vacuum EEE WP78 WP74 FXE SCS SPB MID HED SQS SXP Sample Environment Operation PSPO XO TS Migrated2Zulip
Technical integration and coordination SASE1 Status and SASE3 Readiness
  Technical integration and coordination logbook, Contact: A. Violante, G. Wellenreuther, Page 1 of 30  Not logged in ELOG logo
ID Date Author Location Severity Subject
  589   19 Feb 2025, 09:29 Andreas GallerGeneralInformationNotes XO Integration Meeting 19.02.2025

General Announcement:
-     

CTRL:
- nothing major to report

DA:
- everything in order

EEE:
- issue lens1 y crl1in SA1
   - seps interlock switches are not operational --> lens1 not operational and blocked for operation

VAC:
- nothing to report, regarding the CRL1 lens1 Benoit should be involved and Nerea confirms that he is

XPD:
- no issues to report

DET:
- nothing major, FXE LPD Q2M2 is back in operation

ITDM: 
- nothing to report

XRO:
- nothing

LAS:
- nothing to report

UNSYS:
- mitigation -->BKR now has a reset button available in doocs enabling them to reset any error during wavelength scans on their own

SPB:
- nothing to report

FXE:
- noting to report
 

MID:
- nothing to report
   - MID is kindly asked to share HXRSS perfomance from the MID point of view over the week.

HED:
- nothing to report

SCS:
- instrument setup change with support from XHCrew

SQS:
- nothing to report

SXP:
- not present

  588   17 Feb 2025, 09:39 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 17.02.2025
General Announcement:
-	 

CTRL:
- Small report: last week issue with bunch pattern configuration (Karabo reporting error). Seems to be obsolete properties removed from DOOCS were still in Karabo. 
Valerii B. is working with DOOCS people and will be ready next days. Device is operational.

DA:
- Couple of calls involving setting data analysis tools.

EEE:
- Nothing to report.

VAC:
- Nothing to report.

XPD:
- All fine with XPD.

DET:
- From DOC: hiccups from one module at LPD. Right now all of them are working. Confirmed by FXE.

ITDM: 
- Info today Maxwell servers will be reconfigured. It shall not disturb anyone.

XRO:
- Nothing to report, also from PRC side (Maurizio V.).

LAS:
- Issues with timing card update was solved by EEE.

UNSYS:
- Received 19 OCD calls due to stuck Apple-X undulators during SA3 scans. To understand software bug, one needs time to work with them.

SPB:
- Nothing to report.

FXE:
- Issues with LPD.
- Stuck motor that was not able to be reset (user motor 19). DOC is informed.

MID:
- All fine at MID.

HED:
- Not present.

SCS:
- Nothing to report.

SQS:
- Nothing to report.

SXP:
- Not present.
  587   12 Feb 2025, 09:53 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 12.02.2025
General Announcement:
- Delivery to instruments restarted this morning with good FEL performance (above the average). HXRSS in SA2 to be done during the day.
- As PRC, Maurizio Vannoni has nothing to report. So far so good.

CTRL:
- Instrument Control Integration team has a retreat today and tomorrow. So far only a "nothing to report" arrived to XO.

DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- Nothing to report; all fine.

XPD:
- Nothing to report.

DET:
- Nothing major;
- Jungfrau MID issue: looks to be permanently solved; further analysis on the reason behind is being done.

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.

LAS:
- It had to replace a uTCA in SA3 which was causing timing drifts; after replacement the restarted is ongoing and EEE helps. Hope to have delivery today by lunch time.

UNSYS:
- Nothing to report.

SPB:
- Nothing to report.

FXE:
- XTD2 CRL motion issue is solved: Nerea J. informs Leandro Z. did tests with SPB and motor is behaving properly.
- Issue with LPD appeared this morning (no further info on the issue details) but experts are contacted.

MID:
- Nothing to report.

HED:
- Nothing to report.

SCS:
- Thanks for EEE for recent help.
- Lasermet work is done accordingly to LAS.

SQS:
- Not present.

SXP:
- Nothing to report.
  586   10 Feb 2025, 09:45 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 10.02.2025
General Announcement:
-	 

CTRL:
- Nothing to report.

DA:
- Nothing to report.

EEE:
- Anything to be report.

VAC:
- Nothing to report.

XPD:
- No issues.

DET:
- No major issues;
- Small ones to follow up: Jungfrau at MID (connection issues); SQS Gotthard 2 with weird data.

ITDM: 
- Nothing to report.

XRO:
- Note to instruments: devices not used in operations are now locked. Please instruments contact XRO to unlock any instruments that may be needed. 

LAS:
- Nothing to report.

UNSYS:
- Nothing to be reported.

SPB:
- Nothing to report.

FXE:
- Motor X3 of the XTD2 CRL went into the limit switch while moving in the wrong direction. CTRL will further investigate on Tuesday.

MID:
- Nothing to report.

HED:
- Nothing to report.

SCS:
- Nothing to report.

SQS:
- Not present.

SXP:
- Not present.
  585   05 Feb 2025, 09:44 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 05.02.2025
General Announcement:
-	 

CTRL:
- Nothing to report.

DA:
- All quiet, good.

EEE:
- Nothing to report.

VAC:
- Nothing to report.

XPD:
- Nothing to report.

DET:
- Nothing to report.

ITDM: 
- Nothing to report.

XRO:
- Not present.

LAS:
- Report from SCS with double pulses coming from the laser: still in further investigation (may not be related to LAS, but with experimental setup).

UNSYS:
- Optimization of Circular polarization yesterday: went fine accordingly to expectations; after switching air coils all was in symmetric way; contrast is fine.

SPB:
- Nothing to report.

FXE:
- Nothing to report.

MID:
- All fine.

HED:
- Not present.

SCS:
- BKR was surprised that SCS gets beam.
- Problem with magnet chiller; internal valve can not be controlled and needs to be sent to the company for repair. 
If another groups has a similar chiller to help SCS, please get in touch with Jan Torben.

SQS:
- Not present.

SXP:
- Not present.
  584   03 Feb 2025, 09:39 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 03.02.2025
General Announcement:
- Experiment tuning week is ongoing; Two downtimes happened over the weekend due to 1. an electronic component part of quench circuit of a cold magnet in A20 (11hs) and 2. interlock issues at the injector 
laser (3hs).

CTRL:
- Nothing to report.

DA:
- Nothing to report.

EEE:
- Nothing major to report.

VAC:
- Nothing to report.

XPD:
- Nothing to report;
- Naresh K. work went fine on Saturday (wavefront sensor at HED); program was cut because of short time due to downtime.

DET:
- Nothing to report.

ITDM: 
- Nothing to report.

XRO:
- No major problems; hiccups were investigated and there is nothing preventing operation.

LAS:
- Not present.

UNSYS:
- Nothing to report.

SPB:
- Nothing to report.

FXE:
- Nothing to report.

MID:
- Nothing to report.

HED:
- Not present.

SCS:
- Nothing to report.

SQS:
- Not present.

SXP:
- Not present.
  583   29 Jan 2025, 09:50 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 29.01.2025
General Announcement:
- Steffen Hauf comments that DOC is active from today and also requests SXP and SCS to get in touch with DRC on needed nodes.
- UOM will restart next Friday at 9AM.

CTRL:
- Successful bring-up days were concluded.

DA:
- One last bring-up day to be done today.

EEE:
- Successful bring-up days.

VAC:
- All fine with VAC.

XPD:
- Concluded last action of XPD preparations. Small issues were addressed.
- ZZ in XTD6 yesterday: Shimadzu camera ZZ everything is fine by restarting PC.

DET:
- Nothing to report.

ITDM: 
- Nothing to report.

XRO:
- ZZ in XTD10: stuck pre-mirror in soft-mono due to Elmo controller; physical activity brought back.
- 1mm of limit switch of M5 SA3 is also corrected.
- ZZ in SA2: piezo cables of M1 was swapped and working back.
- Bring up days went fine yesterday.

LAS:
- Nothing to report.

UNSYS:
- Nothing to report.

SPB/SFX: 
- PBLM was found in front of the beam; took a time to realize that, fixed by now.

FXE: 
- Nothing to report.

MID: 
- Issues with power slits at tunnel; but fix ongoing; not a show stopper.

SCS: 
- Nothing to report.

SQS:
- Not present.

SXP:
- Getting beam today.
  582   27 Jan 2025, 09:59 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 27.01.2025
General Announcement:
- Maurizio Vannoni reports on behalf of XRO on the ramp-up activities over the weekend: 
SA1 - positions of mirrors were found (post in Zulip) No major problems were found; Attenuators look fine; 
SA2 - positions of mirrors were found and placed at commissioning logbook; one Attenuator had a problem and feedback from instruments will be asked; 
Piezo in M1 was misbehaving and is repaired, but still to be set by XRO; 
SA3 - positions were found and almost the same as before maintenance, small differences are set and shall be used as a guide when beam is taken; 
A limit switch in M5 need a ZZ to be moved by 1mm; Horizontal SCS slit has relative encoders and work with 1um in accuracy. Soft-mono auto collimator is also commissioned (XRO can help if needed). 

CTRL:
- Proceeding with bring-up days. All fine so far.

DA:
- Bring-up days: 5 out 7 days went well so far.

EEE:
- Nothing to report.

VAC:
- Nothing to report.

XPD:
- Taking beam this morning in SA3 for MCP detector.
- Last days: Spectrometers in SA1 and SA2 are up and running also calibrated with Mono; HXRSS setup was also commissioning (all motors working); All good from spectrometers (HIREX and PES).
- All fine for Imagers.

DET:
- Nothing to report.

ITDM: 
- Reminder for update/service on Dcache tomorrow.

XRO:
- Couple of things that need access in XTD10 (stuck motor and a switch). Probably to be done on Tuesday morning.
- Motor/temperature issues with SRA SA1: Terminals were replaced and everything is fine.

LAS:
- Nothing to report.

UNSYS:
- Everything is fine;
- On Friday afternoon measurements with K-mono in SA1 and SA3 were done; analysis is ongoing.

SPB:
- Bring up days went fine.

FXE:
- Nothing to report.

MID:
- Nothing to report.

HED:
- Concluded bring up days. Thanks for the support.

SCS:
- Bring up day today; changed day plan due to a change with Gotthard-II that has to be fixed.

SQS:
- Nothing to report.

SXP:
- Bring up days: all good.
  581   22 Jan 2025, 09:47 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 22.01.2025
General Announcement:
- Please call DOC number and get in touch with DRC is one needs to save data for any activity or face issues with CTRL and DAQ.
- User and Operation Meeting will start only next week 31.01.

CTRL:
- Nothing to report.

DA:
- Nothing to report.

EEE:
- Following up the issue with SRA in SA1: issues with temperature in motors (not sure if terminals or motor itself) still happening. 
Another ZZ is being organized together with PRC for tomorrow for further investigation. Temperatures seem to be beyond 60C while in other tunnels is around 30C.

VAC:
- Everything fine for VAC.
- Will support with the SRA ZZ in tunnel tomorrow.

XPD:
- All fine for XPD.
- W. Freund adds to the SRA that it was moved yesterday to open for K-mono tests but it did not close again.

DET:
- Nothing to report; bring-up days ongoing - so far so good.

ITDM: 
- Tomorrow Update on Zulip accordingly to the shared e-mail.

XRO:
- Not present.

LAS:
- Nothing to report.

UNSYS:
- Hardware: no problems;
- Small issues with software that are under investigation.
- K-mono measurements were not finished because of the issues with the SRA. Wolfgang F. adds the data was not saved; it is liked because bring-up days happens only today and no ticket for saving data was 
submitted.

SPB:
- Monday the bring-up days happened with EEE and went quite well; On Friday bring-up days with DET and DA.

FXE:
- Nothing to report.

MID:
- Nothing to report.

HED:
- Not present as busy with Workshop.

SCS:
- Not present.

SQS:
- Not present.

SXP:
- Not present.
  580   20 Jan 2025, 09:50 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 20.01.2025
General Announcement:
- E. Boyd reminds on the return of the beam shutter keys: actual plan is to return keys no later than Friday. The SA3 hutches are to be closed on the weekend.
- The User & Operation meeting will start from next week, Friday 31.01.

CTRL:
- Proceeding with bring up days.

DA:
- Busy with bring up days.

EEE:
- OCD was called due to rack 1.1 (SRA motors in SA1). ZZ was done yesterday and today another access at 10:00 to replace fuses.

VAC:
- Everything fine.

XPD:
- For XPD all is fine;
- As PRC Jan Gruenert reports on Friday problems with SRA slits in SA1 with motors in error and could not move. At some point it was moved but with wrong calibration; 
On Sunday a fire alarm in rack 1.1 and extinguisher bottle was empty. No fire was found; Similar issue happened in November but this time the terminals seem to be OK - it seems to be only the fuse. 
The gas bottle has to be exchanged and an access request is placed.

DET:
- Nothing to report; involved in bring-up days.

ITDM: 
- An e-mail will be sent to announce on Thursday this week an upgrade to the Zulip backend of myLog to be done.

XRO:
- SA1 accident with SRA rack; nothing else to report.

LAS:
- Nothing to report.

UNSYS:
- Nothing to report.

SPB:
- Nothing to report.

FXE:
- Nothing to report.

MID:
- Busy at their satellite meeting.

HED:
- Busy with bring-up days;
- Power went down on Wednesday due to emergency OFF triggered by D3. XO is following up: no task that would trigger it was planned; mitigations will be done for the future.

SCS:
- Planned emergency OFF was successful and thanks to everyone who helped.

SQS:
- Not present.

SXP:
- Nothing to report.
  579   15 Jan 2025, 09:40 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 15.01.2025
General Announcement:
- A. Galler announces that yesterday the cooling water of 20C was leaking. The reason is still to be found, as per e-mail from TS sent to the xo-info.

CTRL:
- Proceeding with updates and nothing to report.

DA:
- Ready for bring-up days.

EEE:
- Nothing to report.

VAC:
- Nothing to report.

XPD:
- Information: in XTD6 the PLC loop was repaired.
- XGMs are started (upstream ones).
- As PRC, J. Gruenert says a ZZ is ongoing in XTD10.

DET:
- Nothing to report; prepared for bring-up days.

ITDM: 
- Nothing to report.

XRO:
- The XTD10 H-slit access is finished and cable connection is fixed;
- M. Vannoni sent the draft for the ramp-up plan during next week to the instruments.

LAS:
- Continuing with maintenance tasks.

UNSYS:
- Trying to understand why alignment quadrupoles were inserted in cell#24.

SPB:
- Nothing to report.

FXE:
- Nothing to report.

MID:
- Nothing to report.

HED:
- Not present.

SCS:
- Not present due to interlock tests.

SQS:
- Not present.

SXP:
- Not present.
  578   13 Jan 2025, 09:29 Andreas GallerGeneralInformationNotes XO Integration Meeting 13.01.2025

General Announcement:

 

CTRL:
- nothing majhor

DA:

EEE:
- ZZ on Friday successful.

VAC:
- nothing to report

XPD:
- several issues with devices in the tunnekl, some of which coul be solved from outside, others needed ZZ acces
- MPOD crate in XTD10 needed to be revived
- XTD6 MCP base detector issue --> root cause found: issue in the PLC due to a failing power supply --> ZZ scheduled for today together with Benoit
- Thursday K-Mono

DET:
- Nothing to report. 

ITDM: 
- Nothing to report.

XRO:
- preparing for next week startup

LAS:
- Not present.

UNSYS:
- Everything is fine.

SPB:
- Nothign to report.

FXE:
- Not present

MID:
- All fine at MID.

HED:
- All fine.

SCS:
- Nothing to report.

SQS:
- Not present.

SXP:
- nothing to report.

  577   08 Jan 2025, 08:36 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 08.01.2025
General Announcement:
- Interlock tests are ongoing in tunnels and good progress has been made.
- Planning for the LIMP-2025: it has been worked on; currently there is not a detailed plan available as discussion for tasks is ongoing. 
In case of questions or recommendations please do not hesitate in contacting XO. As soon as a timetable is available, it will be shared with everyone.

CTRL:
- Reminder that this week the camera acquisition system will be deployed to switch OFF them on Tuesdays 12:00, accordingly to the shared info in the e-mail. 
Please contact CTRL for details, questions and suggestions.

DA:
- Al fine; nothing to report.

EEE:
- Situation in XTD2 rack 1.0: fast ADC does not work properly. To be followed up after the meeting.

VAC:
- Not present.

XPD:
- Nothing to report.

DET:
- Nothing to report. Restarting things prior bring-up dates.

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.

LAS:
- Not present.

UNSYS:
- Everything is fine.

SPB:
- Not present.

FXE:
- Nothing to report.

MID:
- All fine at MID.

HED:
- All fine.

SCS:
- Nothing to report.

SQS:
- Not present.

SXP:
- Not present.
  576   06 Jan 2025, 09:42 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 06.01.2025
General Announcement:
- Interlock tests shall start tomorrow 07.01. In case of questions please do not hesitate in contacting XO.
- Eric Boyd says on Wednesday 10AM two hutches shall be interlocked for the tests (FXE exp. Hutch and MID optical hutch) for ~15 minutes. It shall work for both instruments. 
- A. Silenzi reminds that a tentative schedule for the bring-up days was sent to the instruments and a feedback is expected to be returned by the end of today.

CTRL:
- Present but with technical difficulties; it shall be all fine for CTRL.

DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- Nothing to report.

XPD:
- No incoming calls last weeks for the XPD OCD.

DET:
- Nothing to report.

ITDM: 
- Reminder that tomorrow Desy computer center will perform central maintenance; it shall not affect XFEL.

XRO:
- Nothing to report.

LAS:
- Not present.

UNSYS:
- Nothing to be reported.

SPB:
- All quiet.

FXE:
- Nothing to report.

MID:
- All fine at MID.

HED:
- All fine at HED.

SCS:
- Nothing to report.

SQS:
- Not present.

SXP:
- Not present.
  575   18 Dec 2024, 09:55 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 18.12.2024
General Announcement:
- This is the last XO Integration meeting this year.
- Wajid E. reminds attendance to write a ticket to CTRL when needed 

CTRL:
- Done with SA1 and SA2 Karabo update; today proceeds the SA3 update, to be done by mid-late afternoon.

DA:
- Nothing to report.

EEE:
- uTCA updates have been performed in all SASEs; All system up and running.
- One small CPU needs manual intervention in tunnel.
- GATT loop update is up and running now.
- Wolfgang F. says the XFELO crate in SA1 has a crate not working; EEE is looking into it and CTRL is working on the new device. A ticket is created.

VAC:
- Ending most of tunnel activities (XTD2, XTD6 and XTD10) which progressed well. Seems to be all done by end of this week.

XPD:
- PES has been put back in tunnel: was connected and pumped; looks all fine so far and can be brought in operation.
- XFELO worked were done, just missing the ADC (see EEE report);
- Imagers work were done with good progress.

DET:
- Systems are put in Christmas break.
- Tests after Karabo and uTCA updates looked good.

ITDM: 
- E-mail to xo-info was sent about office switches.
- Friday afternoon the XFEL gateway will be updated.

XRO:
- Finishing the last activities.
- Cameras in SA2 had problems (not know if hardware or software issues). In January new tests will be done. Maybe access could be required to check or fix at later 
date.

LAS:
- Not present.

UNSYS:
- Nothing to report.

SPB:
- Nothing to report.

FXE:
- Not present.

MID:
- Nothing to report.

HED:
- Not present.

SCS:
- Nothing to report.

SQS:
- Not present.

SXP:
- Not present.
  574   16 Dec 2024, 09:44 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 16.12.2024
General Announcement:
- Next Wednesday it is the last XO Integration Meeting.

CTRL:
- Proceeding with Karabo update accordingly to the schedule.

DA:
- Nothing to report.

EEE:
- Issue with PLCs: on Friday the SA3 GATT Loop had issue; not fixed until now and loop will be brought back as soon as possible. Working is ongoing.

VAC:
- Nothing to report.

XPD:
- Proceeding with: 
PES repair (today afternoon goes back to tunnel); 
SA1 XFELO photon diode and grating was installed (electronics ADC card in the uTCA crate was not found in the crate and EEE was contacted – P. Gessler says a normal card will be installed in the coming 
days).

DET:
- Nothing to report; tests to be performed after Karabo updates.

ITDM: 
- SA1 control network switches updates were done (two switches not yet operational but Desy experts are working on it).

XRO:
- Progressing well with maintenance activities.
- Note to CTRL: today Karabo update in SA1, tomorrow in SA2 and Wednesday in SA3; Also EEE makes an update today in SA3.

LAS:
- Not present.

UNSYS:
- Nothing to report.

SPB:
- Nothing to report.

FXE:
- Nothing to report.
- LPD burned cable and plugs: new connectors were ordered and will be replaced.

MID:
- All fine.

HED:
- Nothing to report.

SCS:
- Nothing to report.

SQS:
- Not present.

SXP:
- Not present.
  573   11 Dec 2024, 09:43 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 11.12.2024
General Announcement:
- A. Galler comments the maintenance period started; already yesterday tunnels were opened due to the stop in operation from caused by the power glitch at Desy.

CTRL:
- Preparing for the Karabo deployment, to be done next week accordingly to the schedule.
- Dennis Goeries presents on the authentication factor: 
1. tunnel SA1 topic was deployed months ago - the Open Access form is used to generate a 6-digit number that can copied and pasted in the login window. 
2. Thus authentication is then done; One can escalate the access user to have high level access (it is highlighted in Green color at the Karabo); 
3. After 1 hour the session will be closed; When choosing the “remember me” option one needs to make it only once. 

DA:
- Nothing to report.

EEE:
- Schedule for tunnels updates was shared and will be started today. In case of question please get in touch with EEE or Nerea Jardon.

VAC:
- Started with maintenance activities in tunnels.

XPD:
- Working on the maintenance tasks: PES already vented; SA1 XFELO was also vented; Progressing well.

DET:
- Nothing to report.

ITDM: 
- Ongoing with maintenance tasks; some were postponed due to unavailability of software.
- Announcement will be sent for consolidating Maxwell display mode into the cluster mode. Second try to happen tomorrow. Session will be disconnected and users shall connect again later.

XRO:
- Working in tunnels since yesterday.

LAS:
- Start with activities; so far so good.

UNSYS:
- Fixed problem with PS in cell20 SA3.

SPB:
- All fine at SPB.

FXE:
- Nothing to report.

MID:
- Nothing to report.

HED:
- Nothing to mention.

SCS:
- Start maintenance activities.

SQS:
- Not present.

SXP:
- Not present.
  572   09 Dec 2024, 09:56 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 09.12.2024
General Announcement:
- A. Galler informs two downtimes happened last two nights totalizing 10-12hs due to communication issues (between terminals) at the accelerator. 

CTRL:
- Nothing to report.

DA:
- Not present.

EEE:
- Nothing to report in issues.
- Tomorrow from 12:30-13:30 a readout of parameters in tunnels will be made; PLC updates has also a plan.

VAC:
- Everything fine with vacuum.

XPD:
- Reminder the photon ramp-down days take place tomorrow; SA3 hutches must be interlocked.
- SA2 XTD1 XGM stopped working and BKR could resolve by experienced crew.

DET:
- Nothing major to report.

ITDM: 
- Nothing to report.

XRO:
- M1 in SA2: a ZZ on Friday take place to switch OFF and disconnect a controller that was misbehaving and was acting on the piezo without Karabo control.
- U. Boesenberg reports it got better on Saturday and it did not completely fixed the source of problem (beam jitter). Discussion with Johannes M. and Ulrike B. will take place.

LAS:
- Nothing to report.

UNSYS:
- PS cell20 SA3 to be fixed in the WMP.

SPB:
- Nothing to report.
- Request for tuning to improve photon intensities higher than 1mJ today. To be addressed by XO and PRC.

FXE:
- Nothing to report.

MID:
- Apart of beam stability on Friday; a radiation Interlock was triggered by a Lamp. As consequence, could not interlock the hutch. Got solved temporarily and further investigation on the WMP.

HED:
- Not present.

SCS:
- Not present.

SQS:
- Nothing to report.

SXP:
- Not present.
  571   04 Dec 2024, 09:41 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 04.12.2024
General Announcement:
- A. Galler informs X-rays for cw49 are currently been tuned today due to the issues with the cryo plant last week. Schedule for delivering the beam to instruments is to start by 15:00 today.

CTRL:
- Nothing to report.

DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- Nothing to report.

XPD:
- Everything is fine; switch to 17keV XGM went fine.
- As PRC, J. Gruenert has nothing to report.

DET:
- Nothing to report.
- Burned power plugs on LPD: no updates, however all modules are working.

ITDM: 
- Not present.

XRO:
- Nothing to report.

LAS:
- All quiet with Lasers.

UNSYS:
- Everything fine apart of the PS in cell20/SA3 (to be fixed in the WMP).

SPB:
- Nothing to report.

FXE:
- Regarding the LPD: cable was by-passed.

MID:
- All fine at MID.
- On Monday 09.12 there will be a switch in beam delivery to HED.

HED:
- Not present.

SCS:
- Nothing to report.

SQS:
- Nothing to report.

SXP:
- Preparing for beamtime this week.
  570   02 Dec 2024, 09:56 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 02.12.2024
General Announcement:
- A. Galler informs on the changed schedule for Operation due to the difficulties with the cry plant last week: the current beamtimes are extended until Wed 07:00 and then tuning for cw49 will take place. 
It is possible to have special arrangements between instruments - in such case please let XO know. 
Expectation is to have delivery from 15:00 on Wednesday to cw49 delivery, but depends on the promptness of the tuning.
- A. Silenzi announces that DOC has scheduled one extra day of support on Tuesday from 07:00 to 23:00.

CTRL:
- Nothing to report.

DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- Nothing to report.

XPD:
- Everything fine with Diagnostics.

DET:
- Nothing to report.

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.

LAS:
- OCD call from Desy looking for SA3 instrument to change repletion rate - to be clarified.

UNSYS:
- Cell20 SA3 phase shifter motor has a problem. Repair postponed to the winter maintenance period.

SPB:
- Using the beam until Wednesday morning.

FXE:
- Nothing to report.

MID:
- All fine.

HED:
- Not present.

SCS:
- Nothing to report.

SQS:
- 2CPP experiment: unexpected changes happened on Saturday when SA2 was tuned. 
- R. Villanueva as PRC comments that a tuning to recover SA1 intensity is under discussion now and being coordinated.

SXP:
- Nothing to report.
ELOG V3.1.4-7c3fd00