285
|
08 Dec 2021, 11:02 |
Frederik Wolff-Fabris | General | Information | Notes XO Integration Meeting 08.12.2021 |
General Announcement:
- The temperatures in the Hall are warming and accordingly to Tobias C. this is related to cooling water as ventilation is also affected.
- A. Galler reminds on an e-mail sent yesterday related to check-in at XFEL today: one has to show vaccination status at the gate. For next week likely one can register the Covid status at the badge reader
and further communication will be sent.
- On next Saturday 11.Dec tunnels between Osdorf-Born and XHEXP1 will also be closed in the context of the fire extinguisher maintenance.
It is also reminded that all Schenefeld campus buildings are inaccessible and only SRP, TS and external company are allowed in the site.
CTRL:
- After the control server network update, Karabo is up again in all the topics.
DA:
- Nothing to report also including calibration team.
EEE:
- All maintenance tasks progressing in tunnels and instruments.
VAC:
- Not present due to tunnel works.
XPD:
- Progress yesterday was done by bringing hard Xray PES in XTD2 which was installed in the beamline with help from VAC and MEA groups
- Loop update with EEE. Bernard B. says SA3 motion2 PLC will be updated/finished today.
DET:
- Nothing to report.
ITDM:
- Commissioning proposals: interested people got an e-mail on the closing/reviewing of the current proposals. ITDM will eventually close it this week.
- Request for changes on new proposals have to be sent today to ITDM, before its creation. After being created, remains valid for the next half year. New proposals will be available for use from Monday.
- Maintenance tasks: online storage was finished yesterday evening. Currently everything online is available again. DAQ will be brought up today and cross-checked specially for SA1 where servers were
exchanged (new clean installation).
- Exchange of switches for transferring data between Desy and Schenefeld was done.
- Early morning network maintenance: just two routers need further investigation by NOC (using old firmware). Action shall be unnoticed as there is a redundant system.
XRO:
- Proceeding with maintenance planned tasks.
- Reminder on the delayed installation of the XTD2 new bender for SA1 because of problems with cooling/ air conditioning at the labs.
- XTD9 distribution mirror M3 for SA1: XRO noticed the soft limits were changed and position of one mirror was different.
Changes in soft limits may be related to power cut; XRO has changed back to the proper values but this has to be checked again during re-start of operation.
LAS:
- Nothing to report.
UNSYS:
- SA1 cell#33 undulator and rack have been shifted to cell#2.
- Apple-X small hiccups but optimistic that will be good for next week.
SPB:
- Nothing different from Monday.
FXE:
- Usual activities ongoing; tests with robot software library and middle layer devices for movements to be done today.
MID:
- All fine at MID.
HED:
- Nothing to report.
SCS:
- Nothing to report. All fine with transportation activities.
SQS:
- Nothing to report. |
284
|
06 Dec 2021, 11:54 |
Frederik Wolff-Fabris | General | Information | Notes XO Integration Meeting 06.12.2021 |
General Announcement:
- Cooling water situation at XHQ: initially there is no cooling water until possibly 13.12. To the best of XO knowledge all groups are informed. If this is not the case please contact XO.
As soon as water comes back to normal an e-mail will be sent.
- Jorg H. asks on the safety trainings for employees (relates to the sexual harassment traning from an e-mail of Sven M. / Desy this morning).
Sandra Plett comments that this is not mandatory to XFEL colleagues but it will be clarified today via an e-mail. The Basic training and hygiene trainings are the ones mandatory to all the staff.
CTRL:
- Last week Karabo deployment done except of the Lasers (to be done this week). If any issue is found please contact CTRL.
- Control network maintenance: control server maintenance takes place on Wednesday between 07:00 and 09:00.
DA:
- Online data analysis service is also down due to maintenance tasks.
EEE:
- Start this week with tunnel loop updates.
- Ongoing HED installation cables; also cabling work at SPB ongoing.
VAC:
- Continuing with shutdown activities (ongoing accordingly to the schedule).
- Power cut in XTD2 last Friday is not yet understood.
- Broken power supply that affected fire extinguisher system was resolved.
XPD:
- Continuing with maintenance tasks: XTD2 differential pumping systems; transport of hard X-ray PES taking place tomorrow at XTD2.
DET:
- Nothing to report.
ITDM:
- Wednesday early 7:00 to 9:00 no control network due to switches upgrade.
- Today and tomorrow online storage system will be upgraded in offline mode by being disconnected from the clients (therefore it takes shorter time).
- Planned for today and tomorrow the exchange of switches to Desy.
XRO:
- Continuing the list of activities: due to the stop of cooling water the preparation of the re-installation of the bender in XTD2 is delayed.
Lab is currently at 28C and when temperature is stable activities will resume. Only then will evaluate if intervention will be feasible or not.
- Tasks with EEE and motors will start next days.
LAS:
- Confusion with cooling water on lab area that was lost around 15:00 on Friday. Apart of that all is fine. XO will look into it when cooling water is back.
UNSYS:
- Two Apple-X undulators are in the shaft building for connecting vacuum pipes.
- Undulator SA#1-cell#33 to be moved to cell#2. Collimator/Pb shield was moved to downstream of Diagnostic Undulator.
SPB:
- Installations of hardware planned for this week.
- Working with EEE and others to get hardware moved to the new rack room.
- Needs to negotiate to keep vacuum running.
FXE:
- Not present.
MID:
- All fine at MID with maintenance works.
HED:
- Laser interlock update at HED: laser interlock not functional this week;
- Tunnel activities by HED is done.
SCS:
- Activities are ongoing accordingly to the plan.
- Experimental chamber is moving to SCS hutch today.
- Contacted TS in order to run the air flow in the laser run (due to SXP installations): discussed and solved with Alexander K. (TS). About the rack room the 20C is running but rack rooms must be kept
open.
- Alarm of the Draeger cabinets appeared this morning but not yet understood.
SQS:
- Nothing to report. |
283
|
01 Dec 2021, 09:49 |
Frederik Wolff-Fabris | General | Information | Notes XO Integration Meeting 01.12.2021 |
General Announcement:
- Info that today the 20C cooling water will be switched to the towers was sent. Please also open rack doors to help until further notice. Tomorrow we will understand if cooling water tower is working and
if not, then A. Block and XO will communicate.
- Fire alarm happened this morning but not affecting people working at XHQ.
- Steffen H. says that DOC is not operational until middle January.
- Next Friday there won't be an UOM.
CTRL:
- Start with deployment today.
DA:
- Nothing to report.
EEE:
- Fully busy with preparation works and starting updates today.
VAC:
- Maintenance period activities been prepared. Tunnels are opened - if staff access rights are expired, please contact M. Dommach.
XPD:
- Not present.
DET:
- Nothing to report.
ITDM:
- Starting the maintenance activities today; On-line processes are unavailable until end of the week.
XRO:
- Last Monday: ramp down activities (stored motor positions for instruments with proper beam trajectories; XPD also worked with MCP detectors for all 3 SASEs (not done in SCS);
- XRO activities will be reported during this meeting series.
- Calibration SASE2 mirrors FD proposal was submitted for starting 2022.
- One PC at BKR (middle one) is extremely slow and shall be investigated during the maintenance time.
LAS:
- Maintenance on the PP-lasers are started.
UNSYS:
- Not present.
SPB:
- Not present.
FXE:
- Nothing to report.
MID:
- All fine at MID. It will investigate the water leak that happened this morning with chiller.
HED:
- Preparing XTD6 activity (exchange screen in monochromator) next week.
SCS:
- Nothing to report.
SQS:
- Nothing to report. |
282
|
29 Nov 2021, 11:50 |
Frederik Wolff-Fabris | General | Information | Notes XO Integration Meeting 29.11.2021 |
General Announcement:
- Today and tomorrow are the two last days of operation with ramp down of tunnels components. On Wednesday many activities are planned for the start of the maintenance period.
- Sandra Plett comments there are 1000 packages o Self-tests at EuXFEL with 5 tests each. Sandra P. also mentions that FFP2 masks can be taken from reception (few amounts) or warehouse (larger amounts).
CTRL:
- Karabo deployment will start accordingly to the maintenance planning.
DA:
- Nothing to report.
EEE:
- Preparing for maintenance tasks.
VAC:
- Nothing to report.
XPD:
- Naresh K. mentions the issue with emergency light test carried by TS. HED planned to make measurements with a dark room (all lights OFF).
DET:
- Nothing to report.
ITDM:
- Nothing to report.
XRO:
- Nothing to report.
LAS:
- Nothing to report.
UNSYS:
- Not present.
SPB:
- Nothing to report.
FXE:
- Cooling issue in cw49 (opening rack doors): A. Galler says that for the experiments does not need to open racks. On 02.12 XO will inform if the cooling backup system for 20C water works.
MID:
- Training to operate air compression in the Hall was done. Normal state for MID compressor will be OFF and only switched ON when this is needed.
- Jan-Torben D. also asks for the training. This has to be scheduled with TS and XO can assist with it.
HED:
- Emergency light problem occurring on Friday: A. Galler says that this test is being done remotely every week on Mondays; The referred test was a maintenance task and TS was not aware of the presence of
users.
SCS:
- Nothing to report.
SQS:
- Re-arrangement of the beamline starting today.
- SQS is also interested in the training for compressors also. |
281
|
24 Nov 2021, 09:56 |
Frederik Wolff-Fabris | General | Information | Notes XO Integration Meeting 24.11.2021 |
General Announcement:
- Discussions on 3G rules access controlling are ongoing by the Covid task force. However, there is nothing else apart of what was recently announced.
- Next Monday and Tuesday (29-30.11) is dedicated to the ramp-down of the accelerator and photon systems and from Wednesday 01.12 it is the start of the Maintenance period.
CTRL:
- Nothing to report.
DA:
- P. Schmidt informs that instruments noticed early in the morning some issues with calibration.
DA is catching up to make it stable again (it relates to the new measure/state for the expected high data on this week). Please contact DOC if issues can't be solved by staff instrument.
EEE:
- Nothing to report.
VAC:
- Not present.
XPD:
- SA2 Filter interlock is put back (EPS limit of 300 bunches).
DET:
- DSSC cooling system issue (reported at SCS operation e-log): chiller had an alarm due to low level of coolant. The detector was stopped; chiller was refilled and brought back to operation; it seems to be
fine.
DET is investigating why the level had dropped. SCS is also investigating if it relates to a leak or low temperatures. Monica T. is in contact with Jan-Torben D.
ITDM:
- Nothing to report.
XRO:
- Nothing to report.
LAS:
- Nothing to report.
UNSYS:
- Nothing to report.
SPB:
- Confirm that data will be taken also during the night.
FXE:
- Nothing to report; happy with beam performance.
MID:
- Organizing to get a training for the compressor to be able to switch it off when this is not needed.
HED:
- User onsite at the end of the week.
SCS:
- PLC-1 crashed on Monday taking time away for the experiments. A fan went off. Patrick G. says this is recognized that the fan went off and some cooling had to be switched down.
The maintenance of cooling systems is done by TS and it relates to a closed/sealed rack that can't exchange heat.
A solution permitting to spot/alarm when issues with cooling system appears in the racks must be put in place.
SQS:
- Nothing to report. Users are expected this week. |
280
|
22 Nov 2021, 10:13 |
Frederik Wolff-Fabris | General | Information | Notes XO Integration Meeting 22.11.2021 |
General Announcement:
- On Accessing EuXFEL premises at Schenefeld: it is no longer necessary to present the test result at the Gate; it is necessary to present the QR code for vaccination/recovery as well as the DACHS card at
the new terminal. For non-vaccinated people an official test certificate is mandatory.
CTRL:
- No major updates this time.
DA:
- Nothing special to report.
EEE:
- On Saturday EEE had to exchange a fuse at a MID motor (motor burned).
VAC:
- Nothing to report.
XPD:
- Nothing to report.
- A. Galler reported that for SA2 the interlock conditions for the upstream filters in SA2 are temporarily lifted allowing to go to 350 bunches (limit is 300 bunches). This is an exception that is valid
until tomorrow.
DET:
- Nothing to report; IT group is working to increase space for data.
ITDM:
- It collected 2.2 Petabytes of raw data for one user (MID) plus the same amount of calibrated data and there is still one day of beam delivery until tomorrow. Also SPB produced about another 1 Petabyte.
- If such requirements are needed in future please communicate to ITDM well in advance, largely more than one week before.
- A. Madsen says that the reason such big amount of data relates to an exceptionally well run, so it is difficult to predict how many data will be collected. K. Wrona says the communication went very well
this week. M. Turcato also says that when many detectors are running in parallel.
- Further discussions on this topic will take place.
XRO:
- Nothing to report; next Monday XRO plan to have the ramp down activities to have the current positions for the recovery.
LAS:
- From tomorrow on only SA1 will use the PP-laser.
UNSYS:
- Nothing to report.
SPB:
- Issue with calibration pipeline with AGIPD is under investigation (performance of the pipeline is not the expected one). P. Schmidt says that used calibration can not be fully supported on the weekend so
a fix can't be delivered in short time. In such cases it is better to use the old version.
- K. Wrona say one can plan for the maximum expected of acquired data but needs to have full resources for it. The current week was an exception. If one needs similar conditions like the current week it is
a big challenge.
- M. Sikorski completes that about 2-3 weeks before they can have an idea of how much data will be generated.
FXE:
- Nothing to report. M. Biednov says that they work at 9.3 keV that machine performance was poor and that would need to retune on Tuesday (about 1.5mJ).
MID:
- Nothing to report; all fine at MID.
HED:
- Nothing to report.
SCS:
- Experiment running so far good with minor issues.
SQS:
- Nothing to report. |
279
|
17 Nov 2021, 11:20 |
Frederik Wolff-Fabris | General | Information | Notes XO Integration Meeting 17.11.2021 |
General Announcement:
- XO will publish on Friday the full maintenance task list. Everyone is invited to also look at the Infrastructure calendar which contains main dates on this topic.
Please contact XO in case you have questions. The task list will be published via e-mail containing also the file location in an Alfresco folder.
- A power glitch was observed today at around 07:40AM. Machine was not affected. Please check your systems.
- Jan G. asks on Zoom operation issues seen yesterday (link of PBS meeting was shared with non-XFEL staff).
K. Wrona says that this particular case the link was posted at the website including the password and everyone from the world could access. ITDM will prepare an e-mail describing good working practices.
CTRL:
- No major updates.
DA:
- No major updates.
EEE:
- Nothing to report.
VAC:
- Nothing to report.
XPD:
- Systems were checked after this morning's power glitch and they seem fine.
- The transmissive imager (Diamond screens) in SA1 and SA2 are still in. To remove them the instruments shall contact Andreas Koch.
DET:
- Nothing to report.
ITDM:
- ITDM expects this week a lot of data for the user experiments that may overflow systems. ITDM is preparing contingency space for it.
XRO:
- Nothing to report.
LAS:
- No effects were seen from the power glitch; lasers are running.
UNSYS:
- Last Monday the ZZ access in SA3 (cell#22) was successful and the Phase Shifter motor was exchanged. Currently discussions are taking place to evaluate counter-measures for the case it is related to
radiation damage.
SPB:
- Nothing to report.
FXE:
- Nothing to report.
MID:
- All fine at MID.
HED:
- Nothing to report.
SCS:
- Nothing to report.
SQS:
- Nothing to report. |
278
|
15 Nov 2021, 09:57 |
Frederik Wolff-Fabris | General | Information | Notes XO Integration Meeting 15.06.2021 |
General Announcement:
-
CTRL:
- Nothing to report.
DA:
- Interruption during the weekend on the automatic data processing: was disrupted on Saturday night (proposal that was finished and treated as same priority). A change of priorities had to take place for
HED having the data analyzed.
EEE:
- Faulty sensor at ATD broker - EEE will take a look.
VAC:
- No issues to report.
XPD:
- Nothing to report for XPD.
- Jan G. reports the machine overall performance was quite good without major incidents. Several issues were reported on the Operation e-log concerning the calibration pipeline and DAQ.
DET:
- Nothing to report.
ITDM:
- On the prioritization (refers to DA): major reorganization of priorities took place. This results in the fact jobs that are submitted to the partition, (many jobs for a current beamtime) are killed.
If instrument has beamtime please request reservations for the proper amount of jobs.
XRO:
- Nothing to report.
LAS:
- Nothing to report.
UNSYS:
- Planned access to exchange motor of PS21/SA3 this morning.
SPB:
- AGIPD data issues were seen and is in contact to DET and DOC. Issue relates to memory modules not sending data from time to time. Jolanta S.-D. says it can happen for 1-2 modules a train may miss and the
DAQ will discard the data.
This is not unusual and one has to look at the frequency which happens - there is nothing wrong with Detector; data looks as usual. Further discussions will take place.
FXE:
- Nothing to report. User beamtime seems to have run well.
MID:
- Restriction of priorities: MID jobs went through. Experiment jobs have priority and for this week one has to put back in priorities.
- K. Wrona says a system will prioritize the user beamtimes for each week, getting out of the system automatically.
HED:
- Two user experiments using AGIPD went nicely but a bit stuck due to the priorities list (slow data processing).
- Beam instabilities occasionally: appearing and disappearing from time to time (maybe related to mirrors). It was reported to the stability task force.
Harald Sinn mentions about a crosstalk between SA2 with SA3. This HED case will be further studied.
SCS:
- Nothing to report.
SQS:
- Nothing to report. |
276
|
10 Nov 2021, 10:16 |
Frederik Wolff-Fabris | General | Information | Notes XO Integration Meeting 10.11.2021 |
General Announcement:
-
CTRL:
- Issue with mc2 motor (pop-up issue for step-up command): it has been identified and fixed. New version will be deployed in the shutdown. Workaround until then is to stop and restart device.
DA:
- On the slow migration/calibration at MID: it is understood as overload of cluster nodes responsible for migration; mitigated by adding two more nodes. Calibration services shall run better from now.
EEE:
- Drifts with SQS digitizers: yesterday Bruno F. was working on it and it shall be fixed now.
VAC:
- Nothing to report.
XPD:
- Nothing to report.
DET:
- Nothing to report.
ITDM:
- Nothing else to add apart of DA report - still more investigation is ongoing.
XRO:
- Nothing to report.
LAS:
- All fine with lasers.
UNSYS:
- In SA3: two encoders that were exchanged (cell#17 and cell#20) on Monday's ZZ.
- Another PS (SA3/cell21) stopped working. Motor has to be replaced in a next ZZ (request placed).
Suren K. also says that the whole intersection is not working (not able to recover after restart the system - Quad stays in position for operation).
- SA1/cell14 a coupler of the undulator terminal was replaced.
SPB:
- AGIPD issue also observed last week and is under investigation. DET is aware and under investigation.
FXE:
- Nothing to report.
MID:
- Issue with calibration: MID would like to test it in order to close the review.
HED:
- Running user experiment this week.
SCS:
- Nothing to report.
SQS:
- Nothing to report. |
275
|
08 Nov 2021, 10:07 |
Frederik Wolff-Fabris | General | Information | Notes XO Integration Meeting 08.11.2021 |
General Announcement:
- During the weekend there was a cryo plant failure which caused more than 30 hours downtime. This was due to the cold compressor failure on Friday evening.
Machine work hard to get back in operation and Sunday by 06:00AM beam was available to the experiments.
- Chris Y. asks if FXE had used the PAM. It seems not to be the case due to the beam downtime. C. Youngman will contact Yifeng J.
CTRL:
- Nothing to report.
DA:
- DA is interested on the MID migration problem (discussion is following below).
EEE:
- Problem with SQS digitizer regarding a drift when looking into pulse laser pattern. Problem seems to be coming from the source; to be further investigated;
- Beckhoff PLC at SCS had a problem and will be investigated today.
VAC:
- No issues to report.
XPD:
- This week XPD will measure at HED with the calorimeter.
- XPD needs confirmation from MID if Diamond detector was used at MID.
DET:
- Few OCD calls related to the AGIPD operation support.
ITDM:
- The MID issue seems not be linked to migration in a first analysis. It may relate with calibration. Queue was busy as many experiments taking data simultaneously.
By the other side, there were no indications of calibration being used. Today the migration was running normally.
XRO:
- Nothing to report.
LAS:
- Not present.
UNSYS:
- Another Phase shifter (SA3/cell20) presented a problem like the cell17. Waiting for getting access to fix and investigate the encoders. ZZ is scheduled for this morning.
SPB:
- Problem with AC unit at the laser hutch. TS was called onsite during the weekend and it was solved.
FXE:
- Nothing to report.
MID:
- Issue with data processing last night: if it looks good for IT and DA, then MID is relieved.
- Diamond detector use: looks reasonable and data was taken. The final analysis has still to be seen.
- MID refers that it was positively impressed how fast the seeding was brought back after the cryo failure.
HED:
- Nothing to report.
SCS:
- EEE got a call about scanner-y motor. A problem with cable was found and it was exchanged on Sunday morning. Since then it appears to be solved.
SQS:
- Nothing to report. |
274
|
03 Nov 2021, 10:12 |
Frederik Wolff-Fabris | General | Information | Notes XO Integration Meeting 03.11.2021 |
General Announcement:
-
CTRL:
- Nothing major to report.
DA:
- Nothing to report.
EEE:
- Nothing to report.
VAC:
- Not present.
XPD:
- Nothing to report.
DET:
- Issue concerning AGIPD cooling system at MID being not very effective: there is ice formation which stopped the flow of water. This already happened once but it is not so often.
Fix consists in flushing with dry air. Later today Detector will be running again.
ITDM:
- Fire incident yesterday on the labs (ITDM/EEE) was caused by a broken cooling system; the lab cooling water did not work for hours and let to problems with GPFS system in the lab as well as with servers
(same type of racks as the ones in the rack room).
- ITDM suggests the handling of such alarms have to be improved.
XRO:
- Nothing to report.
LAS:
- Nothing to report.
UNSYS:
- Issues with SA3/cell17: Phase shifter can not move. After rebooting PLC system one had to power cycle leading to lose half the SA3 undulator system.
A ZZ was done to recover downstream cells but finally the encoder of the PS motor is found damaged and need replacement. A request for access is created and is needed 4 persons for 2-3 hours.
SPB:
- Nothing to report.
FXE:
- Nothing to report.
MID:
- All fine apart of the mentioned Detector issue.
HED:
- HED asks if the last Sunday's problem with machine (drop in intensity) is understood or if it may happen again. XO says until yesterday this was not fully understood and will enquire again with BKR
colleagues.
SCS:
- Nothing to report.
SQS:
- Nothing to report. |
273
|
01 Nov 2021, 10:10 |
Frederik Wolff-Fabris | General | Information | Notes XO Integration Meeting 01.11.2021 |
General Announcement:
- XO is currently setting scheduling meetings with the groups for planning and cross-checking the preparation for the Winter maintenance 2021. Meetings will take place between this and next week.
CTRL:
- Nothing to report.
DA:
- Announcement on the online calibration: for SPB it will be upgraded to Karabo 2.11. Today is preparation and later this week it will be deployed for the user beamtime.
EEE:
- Nothing to report.
VAC:
- Nothing to report.
XPD:
- Nothing to report.
DET:
- Nothing to report.
ITDM:
- Together with CTRL and DA and HED/MID instrument: solving hardware problem of online cluster - one has to swap locations of SA3 and SA1. This is ongoing right now.
XRO:
- Nothing to report.
LAS:
- Water leak in SA1. TS is aware and fixing it. The PP-laser was not switched OFF.
UNSYS:
- All is good; The seeding crystal in SA2 is on the right position for the self-seeding. Support will be available for helping the expert.
SPB:
- Nothing to report; Interesting data was acquired along the week and analysis will take few weeks.
FXE:
- Nothing to add.
MID:
- All fine.
HED:
- User experiment;
- Yesterday after midnight beam intensity dropped down from 1mJ down to 300uJ and BKR did not managed to recovered it.
SCS:
- Nothing to report.
SQS:
- Nothing to report. |
272
|
27 Oct 2021, 10:34 |
Frederik Wolff-Fabris | General | Information | Notes XO Integration Meeting 27.06.2021 |
General Announcement:
-
CTRL:
- Nothing major to report.
DA:
- Nothing to report.
EEE:
- Nothing to report.
VAC:
- Nothing to report.
XPD:
- Not present.
DET:
- Nothing to report.
ITDM:
- Nothing to report.
XRO:
- Nothing to report.
LAS:
- Nothing to report.
UNSYS:
- Issue with mono in cell 18 / SA2 self-seeding: Encoder for the y-motor is found to be damaged. UNSYS tried to fix it during several hours ZZ but was unsuccessful. Encoder is damage for the y station.
Later a solution with stepper without feedback (only image) was put in place and this managed to insert crystal in the proper position.
- Probably re-writing software to switch from encoder to image feedback may be a solution. The full fix need to open the vacuum chamber.
It is not sure if this action will take place during winter shutdown. This taks will be included in ME list and involves several groups.
SPB:
- Nothing to report.
FXE:
- Nothing to report.
MID:
- All fine.
HED:
- It seems that beam @18keV was seen at the HED hutch, differently from the 30keV situation.
SCS:
- Nothing to report.
SQS:
- Nothing to report. |
271
|
25 Oct 2021, 10:50 |
Frederik Wolff-Fabris | General | Information | Notes XO Integration Meeting 25.10.2021 |
General Announcement:
- An e-mail was sent to "xo-info" mailing list concerning the cooling water maintenance scheduled for one week starting on Dec. 6th.
More information will be sent by the end of this week and if you have any concerns, please contact us at xo-planning@xfel.eu.
CTRL:
- Shimadzu camera at SPB to be followed up; Also, the pop-up motor at HED needs a feedback.
- Related to DRC: on Friday SQS was using the bunch patter server and the machine server was going back to zero pulses. Cause was another Karabo device at SCS topic which was working / forgotten and was
setting bunches to zero.
Important is that none was knowing this was running. Follow up with XO for new procedures.
DA:
- Nothing major to report.
EEE:
- PLC side: backlash 2 step compensation successfully tested.
- Cabling at FXE had some troubles and today there will be a recheck.
VAC:
- Friday incident with Interlock on SA3 (faulty gauge at GATT): reason is known and was communicated to the involved parts. Long term plan to mitigate is in place.
XPD:
- Involved at high energy tests in SA1 and SA2; SA1 worked well delivering beam at SPB; SA2 had 300uJ in XTD1 but a high intensity at HED was not achieved. On Sunday HED colleagues did some tests;
Calorimeter did not see beam.
- Imagers YAG imagers could see the beam at the end of HED station. YAG is not too bad at these high energies (only factor 2x less). Diamond is not suitable as one needs to integrate lot of pulses to get
signal.
- Upgrade on Imagers together with Andrea Parenti is already concluded, tested and shall be working fine. Some Karabo devices had to be restarted in SA1, SA2 and SA3. In case of issue, please contact
Andrea Parenti.
DET:
- DSSC activities with DEPFET ladder measurements at SQS went well; happy with acquired data.
ITDM:
- Nothing to report.
XRO:
- SA1 re-alignment of mirror was not immediately possible and therefore done in several attempts. Started from none position but went well at the end.
- In SA2 re-alignment was not possible (settings of mirrors not ideal and therefore drop of beam intensity); In future a second attempt shall be made with the lessons learned. In SA1 went well.
- SA3 activities went well without problems.
LAS:
- From SQS high energy fluctuations were seen at PP-L and fixed after switching to another setting.
UNSYS:
- Motor of monochromator of chicane 2 / SA2: remotely action did not recover it. Access is needed. Suren K. needs a 2-3 hours of access (realistic time) and there is no guarantee it will work.
SPB:
- Got beam at 24keV.
- On Saturday a problem with camera Shimadzu not communicating to PLC was solved.
- Beam drift at downstream of SA1 (mm order) was seen.
FXE:
- Preparing for Users this week.
- Work with cabling ongoing.
MID:
- All fine.
HED:
- Having the 30keV beam and trying to align; Diffraction seen but could not say that the beam goes to the beam stop. Beam intensity too low for absorption edges.
- Preparing for Users this week.
SCS:
- Not present.
SQS:
- Nothing to report. |
270
|
20 Oct 2021, 10:28 |
Frederik Wolff-Fabris | General | Information | Notes XO Integration Meeting 20.10.2021 |
General Announcement:
- XO received some enquires on the status of the winter maintenance scheduling: We have about 750 tasks submitted and we are currently analyzing all of them to spot conflicts to be solved as well as
identifying the infrastructure dates.
In case you have any question or would like to bring any point to our attention, please feel free to contact us at XO.
CTRL:
- Nothing to report.
DA:
- Today a minor update of offline calibration system occurs at 10:00. No service interruptions will happen.
EEE:
- From the PLC team: 1. An e-mail will be sent as reminder for tomorrow SA2 move2 update (together with XRO); 2. Today SA3 GATT EPS update will take place.
VAC:
- Not present.
XPD:
- XPD team is busy with the facility development week as well as with a beamtime at Flash.
- SA1 is setting up to 24keV. Is under tuning and has so far achieved 500uJ intensity
DET:
- Nothing to report.
ITDM:
- All fine.
XRO:
- SA1 beam transport is aligned with 24keV beam.
- SA2 will be also aligned from today using 30keV beam.
LAS:
- Not present.
UNSYS:
- Issue with 1 motor in the chicane cell#18 / SA2 (crystal) that triggered the limit switch. The motor is stuck and an attempt to remotely fix it will take place.
SPB:
- From tomorrow SPB/SFX will work with beam.
FXE:
- Preparing activities and all is OK.
MID:
- All fine at MID.
HED:
- Nothing to report.
SCS:
- Nothing to report.
SQS:
- Nothing to report. |
269
|
18 Oct 2021, 10:14 |
Frederik Wolff-Fabris | General | Information | Notes XO Integration Meeting 18.10.2021 |
General Announcement:
-
CTRL:
- Nothing to report.
DA:
- On the mention of offline calibration being slow: DA reminds to call the DOC as soon as the issue occurs. It is hard to find root causes at a later time.
EEE:
- Issue with SCS Scannery: solved during the weekend and follow up further;
- Coax cable installation in FXE to start from this Tuesday 19.10.
VAC:
- Nothing to report.
XPD:
- No issues to report; This week XPD is involved at Hard X-rays activities with 24keV in SA1 and >30keV in SA2.
DET:
- Nothing to report.
ITDM:
- Nothing to report.
XRO:
- Attempt to measure the beam position in SA2 this morning was missed as machine started to change parameters.
LAS:
- Not present.
UNSYS:
- Nothing to report.
SPB:
- Observed beam drift of up to 2mm on the 17.10; Theo M. confirms that horizontal direction moved up to 7mm at the XGM.
FXE:
- Nothing to add.
MID:
- All fine at MID; successful user beam time; Issues with Laser being helped during the weekend.
HED:
- Agipd-mini half back to HED; checked with DAQ; tests during this week.
- Also calibration for the single shot operation this week (Single shot with Agipd; picking only trains that have signal).
- Weekend to get 30keV beam: Zuzana K. is the main contact for communication and planning.
SCS:
- Scanner-y issues: it does not run stable (not allowing to be used in automated motion); Beamtime successful.
SQS:
- Nothing to report. |
268
|
13 Oct 2021, 09:26 |
Andreas Galler | General | Information | Notes XO Integration Meeting 13.10.2021 |
General Announcement:
- This meeting is a tool to share information/experiences across scientific and technical groups
CTRL:
DA:
EEE:
- next week
- update on GATT and EPS loop in SA3 in roder to allow for new protection of GATT for the whole beaemtime
- SA2 on Thursday (maybe Friday), try to correct backlash issue --> loop update
VAC:
- all is running
- HED VAC event
- miscommunication between operators led to this issue
XPD:
- no issue to report
- next week, during the whole week there'll be a high photon energy test at SA1 and SA2 see a big involvement of XPD
- 24 keV @SA1 (Tue)
- ~30 keVC @ SA2 (Wed/Thu)
- PI/Planner is Frank Brinker
DET:
- investigating JF1M issue of 4-6Hz instead of 10 Hz operation
ITDM:
XRO:
- SA1 M1/M2 drifts under investigation
- XRO is involved as well with next weeks high photon energy effort as well as EEE loop updates
LAS:
UNSYS:
SPB/SFX:
- user exp this week, 24 keV next week
FXE:
MID:
HED:
- next week high photon energy
SCS:
SQS:
- next week material tests, maybe also detector group.
AOB:
|
267
|
11 Oct 2021, 09:27 |
Andreas Galler | General | Information | Notes XO Integration Meeting 11.10.2021 |
General Announcement:
CTRL:
DA:
EEE:
- several motors in SPB/SFX had trouble, all originating from the same crate
VAC:
- VAC problems at HED last Wed
- monochromator section in the tunnel, two unidentified vacuum bursts
XPD:
DET:
ITDM:
XRO:
- FXE (PZ) reported a large jump in the bender setting, sebsequently Ry and pitch drifted for days and stabilized later
- M1 M2 alignment changed as well
- currently stable and being investigated
LAS:
UNSYS:
SPB/SFX:
- unstable pulse energy jittering ~ 35% over days.
FXE:
- Experiment went well, apart from minor issue with calibration pipeline with JF
MID:
HED:
SCS:
SQS:
AOB:
|
266
|
06 Oct 2021, 09:28 |
Andreas Galler | General | Information | Notes XO Integration Meeting 06.10.2021 |
General Announcement:
CTRL:
DA:
EEE:
VAC:
XPD:
DET:
- nothing to report (SPB reports JF1M issue --> suspected readout board issue)
ITDM:
- issues with Nagios
- misconfig by puppet mangement (DESY)
XRO:
LAS:
UNSYS:
- Phaseshifter tables for higher energies in blue week had been uploaded
- two quad movers from SA2 moved to 0
- triggered by doocs --> quad movers moved back but it is unclear if they actually returned the BBA optimized position
- clarification with M. Scholz confirms that quad movers did not move.
SPB/SFX:
FXE:
- User Experiment starts
- C&C update requested until next week for LPD (uTCA)
MID:
HED:
SCS:
SQS:
AOB:
|
265
|
04 Oct 2021, 09:30 |
Andreas Galler | General | Information | Notes XO Integration Meeting 04.10.2021 |
General Announcements
none
CTRL
- late train IDs at XGM, being sorted
DA
- nothing to report
EEE
DET
ITDM
- nothing to report
XRO
-
LAS
- Failure of Power SUpply on AMPHOS in SA3, had been replaced over the weekend,
- observed jump on ODL in SA2 around midnight --> being investigated
UNSYS
- nothing to report
- PKG status to be discussed
SPB/SFX
- nothing major to report
FXE
MID
- Feedback for M2 stopped working, started calculating wrong values
HED
- nothing to report
SCS
- problems with DAQ: DA1 stuck --> DOC and ITDM are aware
SQS
- nothing to report
AOB
|