Technical integration and coordination SASE1 Status and SASE3 Readiness
  Technical integration and coordination logbook, Contact: A. Violante, G. Wellenreuther  Not logged in ELOG logo
Message ID: 335     Entry time: 22 Jun 2022, 10:20
Author: Frederik Wolff-Fabris 
Location: General 
Severity: Information 
Subject: Notes XO Integration Meeting 22.06.2022 
General Announcement:
- An e-mail with DOC and DRC status during the maintenance period will be sent. There is no DOC but DRC will receive the calls. Also ticketing system is a way to contact. 

CTRL:
- Nothing to report.

DA:
- Nothing to report.

EEE:
- Fuse modification in tunnels and PLC updates: progressing well. 

VAC:
- No issues to report and busy inside the tunnels

XPD:
- Not present.

DET:
- AGIPD 1M at SPB: maintenance is over. Put back the faulty module online. It is working now.

ITDM: 
- Started the updates.

XRO:
- Not present.

LAS:
- Nothing to report.

UNSYS:
- Test for the Apple-X radiation: only 2 bunches were used; no signal in the Radfets and Pandora data has to be analyzed
- Yesterday started removing the cables of Apple-X.

SPB:
- Good news from detector side.

FXE:
- Nothing to report.

MID:
- All fine.

HED:
- All fine at HED; shutdown ongoing.
- Stability measurements: cooling / ventilation off between 14:00-15:00 on Monday. HED took data from HED POP-IN (two devices) and FEL imagers. 
It went well and it was seen 10-15% jitter reduction. Tunnel ventilation is not main source of jitter. 

SCS:
- Nothing to report.

SQS:
- Not present.