| Group Selection Page
HELP
Controls Group
ITDM
DET
Vacuum
WP78
FXE
SPB
HED
SQS
SXP
Sample Environment
PSPO
XO
TS
Migrated2Zulip
Archived2GitlabPages
Archived2PDF
MigratedByGroup | 
| SCS
Photon Commissioning Team
XRO
DOC
WP74
MID
XO_mig
XO_Operation
SQS Migrated2Zulip | 
| Technical integration and coordination | 
| 
| Technical integration and coordination logbook, Contact: A. Violante, G. Wellenreuther | Not logged in |  |  | 
|
| 
| Message ID: 326
    Entry time: 18 May 2022, 11:02 |  | | Author: | Frederik Wolff-Fabris |  | Location: | General |  | Severity: | Information |  | Subject: | Notes XO Integration Meeting 18.05.2022 | 
 |  | 
| General Announcement:
- The cold compressor of the accelerator failed yesterday night at around 23:15. The current expectation is that beam shall be back on Thursday morning. 
Instruments and DRC were informed by the PRC via phone. A status entry can be found in the TTfinfo e-log, Operation-2022 e-log and XO Alfresco landing page.
- Update on the summer maintenance planning: Some groups have the review process finalized. Scheduling meetings are ongoing. 
If a group thinks it is needed to have an scheduling meeting please feel free to contact Martin Doering.
CTRL:
- Nothing to report.
DA:
- Nothing to report.
EEE:
- Nothing to report.
- SA3 PP-L parts that were not behaving properly are under investigation with LAS.
VAC:
- Nothing to report.
XPD:
- Nothing to report.
DET:
- Nothing to report.
ITDM: 
- Nothing to report.
XRO:
- Nothing to report.
LAS:
- Not present.
UNSYS:
- High doses observed in Apple-X are under investigation; A plan to move undulators in the last night did not take place.
SPB:
- Nothing to report.
FXE:
- Nothing to report.
MID:
- Yesterday a loop update cost time with loosing motor parameters but solved at the end.
- Broker pileup: root cause was the physical location of the board (configuration) was changed in between times. Location was changed when configuration was requested.
HED:
- Nothing to report.
SCS:
- Fast sample scanner has problems and needs to be fixed. Involved groups are informed.
SQS: