Technical integration and coordination SASE1 Status and SASE3 Readiness
  Technical integration and coordination logbook, Contact: A. Violante, G. Wellenreuther  Not logged in ELOG logo
Message ID: 322     Entry time: 04 May 2022, 09:59
Author: Frederik Wolff-Fabris 
Location: General 
Severity: Information 
Subject: Notes XO Integration Meeting 04.05.2022 
General Announcement:
- Issues with machine on Monday (misaligned photocathode laser). Beam delivery started only Tuesday at 15:00 instead of 07:00AM. Cause is understood and mitigation strategy is put in place by MXL.

CTRL:
- Nothing to report.
- Monday's Karabo deployment went well.

DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- Nothing to report.

XPD:
- Part of PES detectors were repaired on Monday's ZZ (14 out of 16 are now working).

DET:
- Nothing to report.

ITDM: 
- SPB metro device causing Telegraph to stop sending data. Solved by DOC and a fix will be deployed today together with DA.

XRO:
- Not present.

LAS:
- Nothing to report.

UNSYS:
- Phase shifter cell 14 / SA3 is now fixed.

SPB:
- Few minor issues were solved.
- Gain were not closing - DOC is informed; 
K. Wrona says some runs do not close (1-2 runs per shift): root cause of not understand but solution exist (close the run manually at MyMdc and restart; DOC can help with that).

FXE:
- Thank to SQS for helping with gas valve.
- Continuing with commissioning activities.
- CRLs were in the beam last Monday and were retracted.

MID:
- All fine at MID.
- Looking for a Keithley Pico-Ampere meter to borrow for cw20. 

HED:
- Nothing to report.
- A. Galler informs a water pipe is blocking the construction of the pulsed room. It affects the cooling water. TS needs to coordinate with involved groups.

SCS:
- Experiment ongoing.

SQS:
- Nothing to report.