Technical integration and coordination
SASE1 Status and SASE3 Readiness
|
Technical integration and coordination logbook, Contact: A. Violante, G. Wellenreuther |
Not logged in |
 |
|
Message ID: 322
Entry time: 04 May 2022, 09:59
|
Author: |
Frederik Wolff-Fabris |
Location: |
General |
Severity: |
Information |
Subject: |
Notes XO Integration Meeting 04.05.2022 |
|
|
General Announcement:
- Issues with machine on Monday (misaligned photocathode laser). Beam delivery started only Tuesday at 15:00 instead of 07:00AM. Cause is understood and mitigation strategy is put in place by MXL.
CTRL:
- Nothing to report.
- Monday's Karabo deployment went well.
DA:
- Nothing to report.
EEE:
- Nothing to report.
VAC:
- Nothing to report.
XPD:
- Part of PES detectors were repaired on Monday's ZZ (14 out of 16 are now working).
DET:
- Nothing to report.
ITDM:
- SPB metro device causing Telegraph to stop sending data. Solved by DOC and a fix will be deployed today together with DA.
XRO:
- Not present.
LAS:
- Nothing to report.
UNSYS:
- Phase shifter cell 14 / SA3 is now fixed.
SPB:
- Few minor issues were solved.
- Gain were not closing - DOC is informed;
K. Wrona says some runs do not close (1-2 runs per shift): root cause of not understand but solution exist (close the run manually at MyMdc and restart; DOC can help with that).
FXE:
- Thank to SQS for helping with gas valve.
- Continuing with commissioning activities.
- CRLs were in the beam last Monday and were retracted.
MID:
- All fine at MID.
- Looking for a Keithley Pico-Ampere meter to borrow for cw20.
HED:
- Nothing to report.
- A. Galler informs a water pipe is blocking the construction of the pulsed room. It affects the cooling water. TS needs to coordinate with involved groups.
SCS:
- Experiment ongoing.
SQS:
- Nothing to report. |