Entry   Notes XO Integration Meeting 09.11.2022, posted by Frederik Wolff-Fabris on 09 Nov 2022, 10:07 
General Announcement:
- Martin Doering informs on the winter maintenance period: XO will publish the final task list on next Friday. For next Monday a short presentation will be done in the XO Integration meeting.
- As PRC, F. Wolff-Fabris says many machine downtimes happened since yesterday afternoon due to the trip in one LLRF station, the A6. 
This early morning an intervention was done to reduce the gradient from 620MV to 530MV. Observation in coming hours will say if this has helped to suppress or decrease the ammount of trips.

CTRL:
- News on HED VAC loop6: interlock condition was flickering. Together with HED and EEE it was found the reason and update will be done soon.

DA:
- Calibration team: two weeks ago it was introduced a picture for automatic correction. MyMdc system is still showing bugs and permanent solution is being worked out. 
Until its deployment, please call DOC for solution. K. Wrona says bug happens only if at the beginning of the run it is forgotten to change the run type.

EEE:
- Nothing to report.

VAC:
- Nothing to report.

XPD:
- Nothing to report.

DET:
- Nothing to report.

ITDM: 
- Graphana upgrade went OK. In case of issues in the coming days please contact ITDM

XRO:
- Nothing to report.

LAS:
- AMPHOS maintenance in SA2 is under way.

UNSYS:
- M. Yakopov repaired another encoder in SA3/cell22 phase shifter on Monday morning. Also as OCD the support for moving the HXRSS crystal is being done.

SPB:
- Yesterday photon intensity jumped down as BKR mistakenly tune down one corrector in SA1 undulators instead of SA2 (when tuning HXRSS). Recovered after 1 hour.

FXE:
- Nothing to add.

MID:
- All fine at MID.

HED:
- Setting up experiment for next week. Troubles with SmarAct devices under investigation.

SCS:
- Nothing to report.

SQS:
- Not present.
Entry   Notes XO Integration Meeting 07.11.2022, posted by Frederik Wolff-Fabris on 07 Nov 2022, 09:57 
General Announcement:
- Jan Gruenert, as PRC, reports on the Saturday night access (SA2 remained running) and on Friday evening at XTD6 done by HED. The remainder of the weekend worked well with instruments.
- A. Silenzi, as DRC, says the SA2/HED loop6 had flickering conditions that makes it irresponsible for short times. Apart of it, it was a quiet week.
- A. Galler suggests groups to check the TS announcement concerning the Dec.3rd electrical maintenance as well as the interruption of drinking water from Dec. 2nd. 
It is suggested to reduce the number of people onsite after 15:00 on Friday 02/12.

CTRL:
- Issue with update of cameras: A. Parenti says that this morning an update for Bassler cameras was installed in agreement with A. Koch. 
It addresses the issue that after pressing "stop" at cameras the Karabo was irresponsible. Cameras will be re-instantiated and will be under monitoring for the next days.
- Unresponsiveness of VAC loop6 in HED will be followed up.

DA:
- Quiet OCD last week.

EEE:
- Nothing to report.

VAC:
- Saturday evening in SA3: failure of fast valve controller for interface to Desy. Access by VAC-OCD and PRC was needed to exchange the controller and beam interruption of 4.5hs in the north branch 
happened (investigation + access). 
Rack 3.1 was affected (located behind the concrete wall at the dump).

XPD:
- All fine with XPD.

DET:
- Nothing to report.

ITDM: 
- Status of "Readthedocs": the possibility to generate new documentation is now fixed by a workaround. In mid-term a different documentation system will be used - still to be decided.
- Pre-announcement: 
1. upgrade of InfluxDB to happen during the winter maintenance period; 
2. today the update of Graphana is taking place at a proposed time 15:00 (service down for a short period). An e-mail will be sent and in case of any concerns from other groups it may be shifted to next 
Monday.

XRO:
- Nothing to report.

LAS:
- Regular maintenance and tests being carried out today.

UNSYS:
- Issues with SA3 cell9 and cell17 undulators which had taper values blocking their movement. It was solved from remote action.

SPB:
- Good data were measured last week.

FXE:
- Nothing to report; experiment was successful.

MID:
- All fine at MID.

HED:
- Apart of small issue last Friday, nothing to report.
- Transmission with MONO was too low and HED decided to stop using it during the weekend. 
- J. Gruenert adds the recalibration of SA2 XGM has to be done when changing beam path or alignment of beam.

SCS:
- Preparation for beamtime; issue with motion being addressed.

SQS:
- Not present.
Entry   Notes XO Integration Meeting 02.11.2022, posted by Frederik Wolff-Fabris on 02 Nov 2022, 10:20 
General Announcement:
- A. Galler informs groups are very welcome to contact XO for questions and discussions on the electrical maintenance task taking place on 3rd of December.
- A. Galler reminds on the beam quality Karabo device that was announced in an e-mail to xo-info@xfel.eu. 
Please instruments are asked to make use of it for that a database can be built to further investigate correlation between beam quality and environment and operating conditions.

CTRL:
- Nothing to report.

DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- Nothing to report.

XPD:
- All fine with XPD.
- As PRC J. Gruenert informs machine had trouble on Monday while switching to 14GeV, which took longer time than planned. As consequence tuning started later on Tuesday. 
The HXRSS tuning is starting only this morning. The SA2 regular SASE intensity is still low but SA1 and SA3 runs fine.

DET:
- Nothing to report.

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.

LAS:
- Nothing to report.

UNSYS:
- Last week SA1/cell27 PS encoder motor was replaced. Suren K. says Unsys still has 5 spare motors to be used in such cases.
- Issue with stages of the Monochromator crystal in second chicane of SA2: X-axis, Y-axis and roll angle have to be controlled in local mode as encoders are broken. 
Crystal was inserted this morning into beam by Unsys staff using the local controls. Roll angle can not be seen in the camera, only Y and X-axis can be seen in camera with accuracy of 0.5mm.

SPB:
- Nothing to report.

FXE:
- Test on digitizer of a motor that worked nicely.

MID:
- Special thanks for support from Suren K., HXRSS team and XO during the weekend for providing HXRSS beam.

HED:
- Nothing to report.

SCS:
- Theta rotator last week: experiment last week went fine and motors are working.

SQS:
- Nothing to report.
Entry   Notes XO Integration Meeting 26.10.2022, posted by Frederik Wolff-Fabris on 26 Oct 2022, 09:59 
General Announcement:
- F. Wolff-Fabris as PRC says beam delivery is working fine and only last night it was interrupted for about 1 hours due to an issue with RF system. 
SA1 and SA3 beam is running in good performance and currently the HXRSS in SA2 improved as compared to yesterday and has achieved around 500uJ with 100uJ SASE background as of now.
- Gero Flucke as DRC says all is fine but suffering with shortage of people in DOC.
- A. Galler says that please contact XO for information/question on the power cut of December 3rd.

CTRL:
- Nothing to report.

DA:
- Nothing major to report.

EEE:
- Nothing major for the moment to report.

VAC:
- Not present.

XPD:
- No issues to report. All fine.

DET:
- Jungfrau issue reported by FXE: the detector was not expected to be used in burst mode and this probably caused the issue. The burst mode is not yet optimized (some experiments/tests were done At SPB) 
and this was not prepared at FXE.  

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.

LAS:
- Issue with SA1 PP-laser: trigger delay device at the instruments showed issues and yesterday a patch was deployed and it works now.
- SPB requested improvement in the beam shape and LAS colleagues are working on it today.

UNSYS:
- All fine.

SPB:
- Nothing to report.

FXE:
- A. Galler informs a new He gas delivery in on the way to EuXFEL.

MID:
- DOOCS device crashed overnight: e.g. information from the undulator was lost and the clone device was gone. Fixed by DOC. 
Wajid E. and Steffen H. comment that the "refresh" button helped to re-start; the server that runs the clones for MID crashed due to unknown reasons and the refresh button worked; reason under 
investigation.

HED:
- Nothing to report.
- HED will need XGM next week.

SCS:
- User operation and issue with theta rotation of a chamber. SCS will contact EEE and CTRL.
- Question on ReadtheDocs problem: SCS uses with users for documentation and shows malfunction. 
K. Wrona comments that the servers were put in operation but software is not in good state and not easy to fix. Progress is being done with preparing a workaround. Once a strategy is known ITDM will inform 
accordingly. 

SQS:
- Nothing to report. Estimation for pulse duration during last week: Alberto De Fanis will find out internally and inform accordingly.
Entry   Notes XO Integration Meeting 24.10.2022, posted by Frederik Wolff-Fabris on 24 Oct 2022, 09:47 
General Announcement:
- Processing of the maintenance tasks lists is delayed but effort in background is ongoing. Lists will not be published next Friday and scheduling meetings will take place during this and next week. 
The release will take place on November 11th.
- As PRC, A. Galler says that nothing major is to report apart of the laser interlocks issues on Thursday and Saturday, fixed either by SRP or the instruments.
- A. Galler inform on the e-mail sent to the xo-info@xfel mailing list on the the beam quality device at Karabo. Instruments are very much invited to use it at least once per shift or when beam conditions 
change.

CTRL:
- Nothing to report.

DA:
- Nothing to report.

EEE:
- Having group retreat today but OCD is available.

VAC:
- Nothing to report.

XPD:
- Nothing to report.

DET:
- Nothing major to report.

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.

LAS:
- Incidents: AMPHOS was OFF in SA3 - reason not fully understood but OCD has brought it up again.

UNSYS:
- Nothing to report.

SPB:
- Last week's Extra-foam issue with AGIPD was solved by DOC.

FXE:
- Problem with calibration of Jungfrau: it was fixed but an issue still remains. DET will discuss together with Calibration team.
- Question regarding the He gas supply: A. Galler in forms there is no new supply apart of what was received two weeks ago. The central supply must have around 40 bars as of today.

MID:
- All fine at MID.

HED:
- Not present.

SCS:
- Nothing to report.

SQS:
- Nothing to report.
Entry   Notes XO Integration Meeting 19.10.2022, posted by Andreas Galler on 19 Oct 2022, 08:45 

General Announcement:

  •  

CTRL:

  • nothing major

DA:

  • nothing special

EEE:

  • Group retreat on Monday, Tuesday next week --> OCD available
    • ion pump controller broken in XTD1

VAC:

  • not present

XPD:

  • nothing

DET:

  • 25th of October group retreat

ITDM:

  • nothing major
  • change of FastX on max-display from FastX2 to FastX3

XRO:

  • nothing to report

LAS:

  • AMPHOS Shutter Laser issue

UNSYS: 

  • ccell 25 SA1 fixed --> now only 6 motors are left.
    • Lead shields ETA beginning of February --> will have to be done through ZZ
    • broken motors and encoders are sent back to Beckhoff
      • repair time approx. 2 - 3 months

SPB/SFX:

  • Laser interlock error
  • extra foam 4 center modules from AGIPD
    • DOC / DRC to be contacted
  • jet motion
    • dynamic brake engaged because the cable was loose --> fixed

FXE:

  • extra foam issues had been sorted out
    • 16 cell mode of Jungfrau not being used

MID:

  • all fine at MID

HED:

  • collimated beam showed jitter --> downfocussing reduced the effect
  •  

SCS:

  • nothing major

SQS:

  • nothing to report

DRC

  •  

PRC

  •  
Entry   Notes XO Integration Meeting 17.10.2022, posted by Andreas Galler on 17 Oct 2022, 09:31 

General Announcement:

  •  

CTRL:

  • nothing major

DA:

  • nothing special

EEE:

  • OCD call on Friday
    • ion pump controller broken in XTD1

VAC:

  • see EEE --> additionally over the weekend the pump was taken out of the interlock

XPD:

  • nothing

DET:

  • JungFrau damagat at SPB/SFX in cw 40
    • two powder rings permantnly burned into detector

ITDM:

  • SA2 online system (gpfs) one enclosure is bahving strangely, --> fixed no replacement needed

XRO:

  • nothing to report

LAS:

  • crash of PPLaser in SA1 over the weekend
    • TRGDly was upgraded recently/ crashed for SPB --> TRGDly device being rolled back and PPLAS1 should be back up today.

UNSYS: 

  • ccell 25 SA1 fixed --> now only 6 motors are left.
    • Lead shields ETA beginning of February --> will have to be done through ZZ
    • broken motors and encoders are sent back to Beckhoff
      • repair time approx. 2 - 3 months

SPB/SFX:

  • Jet control stopped
  • PPLAS
    • on Friday there was no LAS output --> fixed
      • no LAS OCD in blue weeks, and on Friday no LAS group member on site --> earliest service on Saturday through good will.
    • shift change not successful due to miscommunication
      • SPB let the laser run over night for measurements --> FXE did shift change over night eventually destroying the SPB measurement
    • see LAS TRGDLY device
  • SPB requests to not upgrade software thorugh run for PPLasers.
    • recently there were some upgrades on a Monday which then later fail for operation
  • SPB notest that there is only limited OCD by LAS group and then LAS cannot cover critical components

FXE:

  • set up built for User Experiment
    • HallCrew supported in build up
    • LAS use --> see SPB/SFX

MID:

  • all fine at MID

HED:

  • user experiment being set up

SCS:

  • not present

SQS:

  • nothing to report

DRC

  •  

PRC

  •  

Entry   Notes XO integration meeting 12.10.2022, posted by Andreas Galler on 12 Oct 2022, 09:16 

General Announcement:

  •  

CTRL:

  • nothing major

DA:

  • nothing special

EEE:

  • nothing special

VAC:

  • XTD6 HED monochromator
    • pumping down continues

XPD:

  • nothing to report

DET:

  • nothing to report

ITDM:

  • SA2 online system (gpfs) one enclosure is bahving strangely, intervention may be required --> to be investigated

XRO:

  • XTD6/XTD9 tunnel works

LAS:

  • no issues

UNSYS: 

  • cell 19, 20, 21 motors for phase shifters had been replaced. Delivery for lead shields is going to be next year --> installation will have to be done through ZZ access
    • radiation damage is high after chicane, delivery time for new motors is 1 years, 7 are left in stock

SPB/SFX:

  • nothing special

FXE:

  • nothing to report

MID:

  • all fine at MID

HED:

  • nothing to report

SCS:

  • hRIXS combined motuion requires PLC to be exchanged

SQS:

  •  

DRC

  •  

PRC

  •  

Entry   Notes XO Integration Meeting 10.10.2022, posted by Frederik Wolff-Fabris on 10 Oct 2022, 10:09 
General Announcement:
- Wajid E. reminds DOC is not working this week but the DRC will take the calls over the week and redirect to respective OCD inside DATA department.
- Olivier M. mentions to use drc-xfel@xfel.eu for contacting the DRCs. However, the fastest way to communicate for urgent matters is using the regular DOC/DRC phone number.
- Martin D. updates the status of winter maintenance period: 
1. MTLs are in general with lower quality as compared to previous maintenance time (e.g. starting and ending dates); 
2. Groups will be contacted back by XO and meetings with groups will be scheduled in the coming days. 
- A. Galler shows the TTFinfo/schedule to inform on the schedule for this Blue/FD week starting today.

CTRL:
- X-ray feedback device reported by MID: device did not provide feedback for beam position. A bug fix was applied and it worked. 
CTRL proposes to apply to all other location today. No objections from the instruments appear during this meeting - so it will take place today.

DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- XTD6 was opened today for work on the high resolution Mono. It will stay open at least today and tomorrow.
- On Saturday VAC OCD approved to borrow a He bottle to MID. MID will return back to VAC today for He leak tests in tunnels.

XPD:
- Nothing to report.

DET:
- Nothing major to report.

ITDM: 
- Nothing to report.

XRO:
- Mikako M. enquires on the Blue week schedule: A. Galler says that requesters that got beamtime granted must be informed already.

LAS:
- SA1 PP-laser will test the trigger delay;
- LAS is performing SA3 PPL tuning for handling laser to SQS instruments.
- A. Galler says that optical sync was lost during the weekend in all instruments. The RF sync was on 30fs RMS performance which could be used.
UNSYS:
- Request for access in SA3 was done (fixing PS motors in cell 20 and 21): mostly to be done tomorrow or Wednesday.

SPB:
- Nothing to report.

FXE:
- PP-laser sync problems (6x last week) with loosing timing. It put the PPODL device into Error state; it could be recovered automatically but the laser timing wasn't conserved. 
So in about half the events the laser timing changed by 2-5 ns. Ticket was placed.

MID:
- Thanks to VAC for borrowing He bottle.
- Problems with optical sync; otherwise all fine.

HED:
- Nothing major to report.

SCS:
- Issues with Optical sync: drop happening on the Desy side (which do not have OCD on the weekend). After loosing Sync it took long to recover synchronization. At total about 15hs of beamtime was lost.
- There is no good alarm system indicating the sync was lost. This can be addressed at EuXFEL side. Steffen H. adds that a ticket is ongoing now and a good way for displaying will be worked out.

SQS:
- Nothing to report.
Entry   Notes XO Integration Meeting 05.10.2022, posted by Frederik Wolff-Fabris on 05 Oct 2022, 10:11 
General Announcement:
- XFEL got 12 bottles of He gas (50 l; 200 bar) which are connected to the central supply. Only SA1 will receive He gas from central gas supply in order to guarantee the run until the end of 2022. 
The pressure in the line will be monitored and the valve will close if unexpected drop happens. If one needs He gas please get in touch with XO.
- Winter maintenance task list: XO has received almost all lists apart of two of them. Groups missing shall submit the maintenance task list as soon as possible.
- Zunaira A. informs that if SEPS/AIBS is triggered (like last Saturday event) the procedure is to send an e-mail to rpo@xfel.eu.

CTRL:
- Follow-up of MID mirror feedback: problem is hard to replicate; yesterday happened again and recovered itself. MID reports it is stuck at exactly this moment. CTRL will investigate.
- Zunaira A. says on the aftermath of the Saturday AIBS alarm many automatic e-mails are kept to be sent and only today an e-mail saying problem is solved was sent. 
Steffen H. comments that it was informed that a test of the system has to be done due to an occurring bug and currently it has to be manually reset. The test is to take place in winter maintenance time.

DA:
- Nothing to report.

EEE:
- Nothing to be reported besides the Saturday issue with SXP losing power which affected the AIBS. Zunaira A. says devices are in the UPS system (Pandora, which did not give alarm). 
Oleg E. which will exchange components during winter maintenance time.

VAC:
- Not present.

XPD:
- Nothing to report.

DET:
- Nothing to report.

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.

LAS:
- No news from LAS.

UNSYS:
- Not present.
- XO reports an issue with Phase shifter in SA3 (cells 20 and 21) which are stuck and need motor replacement. This is likely to happen next Monday as users at SCS do not plan to change photon energy.

SPB:
- Nothing to report.

FXE:
- Problem with BAM “S” not properly working. 
- As PRC, F. Wolff-Fabris says a work around is in place and shall use the BAM “M” instead. FXE shall get in touch with BKR for more details.

MID:
- AGIPD preview crashing and has to be restarted.

HED:
- Nothing to report.

SCS:
- Nothing to report.

SQS:
- Not present.
Entry   Notes XO Integration Meeting 28.09.2022, posted by Frederik Wolff-Fabris on 28 Sep 2022, 10:02 
General Announcement:
- Announcement: September 30th is the deadline for submitting the Maintenance task list. So far XO received 3 lists.
- Maurizio V. informs that this moment some groups are not yet aware of the 03.12 electrical intervention. The Maintenance time is therefore shorted. XRO will place in task list all planned activities but 
the confirmation if they take place depends on the actual time available for the work. 
A. Galler informs that a presentation wad done in this meeting series and also to the STGL who shall also communicate to their respective groups. It is also perfectly fine to mention that a task may not be 
carried out if it depends on timing plan. In any updates XO will inform via e-mails to xo-info or directly with affected groups.

CTRL:
- Nothing major to report. Follow-up today with MID (on the feedback mirror) in live session.

DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- Nothing to report.

XPD:
- Nothing to report.

DET:
- Concerning the timing system Detector: call to DOC was received and issue was solved.

ITDM: 
- Issue reported last Monday by ITDM (data migration / GPFS): ticket was created and is under investigation.

XRO:
- Nothing to report.

LAS:
- Discussion on the electricity work on Dec. 3rd: XO would like to discuss with LAS later today.

UNSYS:
- Small issue in SA1/cell9: water in the vacuum chamber. Solved by M. Yakopov and MKK. 
- Task list is submitted.

SPB:
- Nothing to report.

FXE:
- Naresh K. reports yesterday night the Hirex was setup for next week together with Peter Z. and it was done by 01:30AM. FXE had no plans for beam usage after that.

MID:
- Feedback to XRO: last week MID changed the mirror stripes from Platinum to B4C using the macros and it worked nicely.

HED:
- Done with compensation to users beamtime; currently changing setup for next user and will not use beam during the day and only few bunches tonight.

SCS:
- Experiment running: no issues.
- Noise with Fast ADC and the ADQ412 was observed when amplifiers were ON: To be checked.

SQS:
- Nothing to report.
Entry   Notes XO Integration Meeting 26.09.2022, posted by Frederik Wolff-Fabris on 26 Sep 2022, 10:14 
General Announcement:
- Steffen H. sent an e-mail to instruments scientists informing for a meeting on functional controls to the instruments: Please contact back Steffen H. for participation.
- A. Galler reminds that September 30th is the deadline to submit the winter maintenance period task list. For questions please contact Martin Doering.
- As PRC, Jan G. reports that machine worked nicely without issues last week. 
One issue in photon side was the malfunction of a mirror feedback in SA2 (issues that sometimes it suddenly stops after many hours of working); Another was a small SCS vacuum issue was reported and solved.

CTRL:
- Nothing to report.

DA:
- On the HED time with problems with files two weeks ago: work is in progress.

EEE:
- EEE-OCD received a call during weekend regarding SCS XRD chamber: EEE will get in touch with SCS today to investigate the issue.

VAC:
- Nothing to report.

XPD:
- Nothing to report.

DET:
- Nothing to report.

ITDM: 
- GPFS issue with SA2: data migration not functioning. It was solved but the expert will further investigation taking place today.
- On the HED files issue: looking into data analysis and will set up accordingly for this week.

XRO:
- SA2 Mirror is properly working, the issue with feedback at SA2 seems to be with software. 

LAS:
- Not present.

UNSYS:
- Issue with cell6/SA3: problem with bad connectivity. It is needed to have an access request today to fix the Ethercat card.

SPB:
- Preparing for this week experiment.

FXE:
- Observed the crosstalk when SA3 changes number of pulses when running in interleaved.

MID:
- Feedback mirror issue on Saturday; it was fixed on Sunday. Wajid E. comments it needs beam to further investigate; may be triggered by the Imager. 
CTRL will discuss offline with MID (it needs beam to further test). Jan G. points an e-log entry was done documenting the issue.
- GPFS issue happening.
- Continuously had to re-start the AGIPD pipeline (used as monitoring). P. Schmidt says that a fix may exist and additional investigation has to take place; mostly related to the wrong train-IDs. 
Jolanta A.-D. says it it is a similar problem already known at SCS and it has to filter the train in the analysis. DET and EEE shall further investigate.

HED:
- Starting tomorrow with compensation to the beamtime from 2 weeks ago (collecting into the proposal that is still open).
- Change setup on Thursday for next user starting on Friday.

SCS:
- Jan T.-D. asks on the ZZ access for the soft X-ray Mono: Raul V. is organizing together with Natalia G.

SQS:
- Continuing installation of spectrometer together with Swedish colleagues.
Entry   Notes XO Integration Meeting 21.09.2022, posted by Frederik Wolff-Fabris on 21 Sep 2022, 10:18 
General Announcement:
- A power glitch was detected at around 05:50AM today and it was transparent for the machine. Please check your systems are also running normally.
- A reminder will be sent to xo-info for the deadline to submit the winter maintenance task list.

CTRL:
- CTRL was able to reproduce the issue locally at the Imager and the work on a fix is ongoing.

DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- Nothing to report.

XPD:
- Issue with SA3 FEL IMAGER yesterday morning: a damage to the YAG was found and it was adjusted to a new position. 
A reminder for SA3 instruments: please look at the watchdogs and at higher photon intensities it is preferable to start with the Diamond screen for tuning purposes.

DET:
- Nothing to report.

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.

LAS:
- Nothing to report.

UNSYS:
- Issue with a stuck phase shifter in SA3 / cell16 was solved by a ZZ by placing a spare motor. Cause is likely due to radiation damage. 
Purchase of Lead shields are ordered and will be delivered next year. 

SPB:
- Nothing to report.

FXE:
- Yesterday it contacted operators to discuss the RF window for SA1 which was set shorter than the requested.
- No further information on the "ghost" beam last week. It was seen only in the detector placed at the beam when SA2 or SA3 were set to zero bunches. 

MID:
- Trouble with hexapod during the weekend, which revealed to be broken. It was removed yesterday and is impacting the sample motion. A workaround is being put in place.
- New monitoring for Agipd gets stuck with calibration. DA is looking into it.

HED:
- Nothing to report.

SCS:
- Not present.

SQS:
- Installing spectrometer during this and next week.
Entry   Notes XO Integration Meeting 19.09.2022, posted by Frederik Wolff-Fabris on 19 Sep 2022, 09:54 
General Announcement:
- General announcement: reminder that on September 30th is the deadline to submit the winter maintenance task list. Tasks that are announced later may be included but it cannot be guaranteed to be 
scheduled in the planning.

CTRL:
- Nothing major to report.

DA:
- Nothing to report.

EEE:
- Update in SA3 EPS taking place today to add the SXP imagers.

VAC:
- ZZs taking place last Thursday to bring up VAC signal to North branch: currently looking into causes of XTD2 hiccups.

XPD:
- Thursday event with issues with hard X-ray PES: one channel for the digitizer saw an increased noise; also the MPODS that supply voltages did not restart and a ZZ is necessary to be brought the PES 
operational again.
- Another ZZ is requested by Naresh K. in XTD6. This is scheduled for today.

DET:
- Nothing to report.

ITDM: 
- Issue with loading of calibration factors taking long time: it did not happen again.

XRO:
- Nothing to report. As PRC Maurizio V. reported a quiet weekend.

LAS:
- Nothing to report.

UNSYS:
- Friday cell 12/SA3 phase shifter did not go below 11mm. If this is required again in the future one has to prepare working tables.

SPB:
- The 20keV operation was fine apart of the intensity slope trough the train. 

FXE:
- Nothing to report. No known issues with 12 keV operation on Friday.

MID:
- All fine at MID.

HED:
- Two user beamtimes were successful. 
- One hiccup was an issue with Cluster on Saturday night. That remain for 5-6 hours but was fixed by K. Wrona, who says that it is linked to the high number of created files. 
He increased it by a factor 10 to solve the issue. There are possibilities for improvements that will be discussed among HED, DA and ITDM. Similar experiment will happen again in two weeks.

SCS:
- Experiment taking place this week: electrical check ongoing and PLC connection also.

SQS:
- Nothing to report.
Entry   Notes XO Integration Meeting 14.09.2022, posted by Frederik Wolff-Fabris on 14 Sep 2022, 10:11 
General Announcement:
-	 

CTRL:
- Update concerning SA2 Imager issue reported by MID: CTRL is investigating with high priority and is working to apply a fix.

DA:
- Nothing to report.

EEE:
- Next Monday there will be an update of EPS in SA3 to integrate the SXP instrument into it.
- Also work on modification of pre-absorber is to be done together with Maurizio/XRO (also SXP-related).

VAC:
- Nothing to report.

XPD:
- Nothing to report.

DET:
- Concerning AGIPD 500K at HED: issues with electronics boards were found: it was disassembled and sent to Desy for investigation. 
It was fixed and re-installed back yesterday. Calibration is ongoing and is to be ready before beamtime.

ITDM: 
- Marcin S. says it took long to load calibration factors (around 14:30-15:00 yesterday). ITDM will investigate if something happened at the time.
- Fix for the GPFS mentioned on last Monday was applied in SA2.

XRO:
- No major problems to report.

LAS:
- SA3 PP-laser is back and running; maintenance still to be done today but laser is in good shape.
- LAS will access the other two PP-lasers for similar issues.

UNSYS:
- Nothing to report.

SPB:
- Nothing to report; started to collect data and beamtime going accordingly to the plan.

FXE:
- Nothing to report.

MID:
- All fine at MID.

HED:
- Nothing to report.

SCS:
- Not present.

SQS:
- Nothing to report.
Entry   Notes XO Integration Meeting 12.09.2022, posted by Frederik Wolff-Fabris on 12 Sep 2022, 09:55 
General Announcement:
- Machine tried the switch between 24 and 20keV at SA1 during the weekend: it was tuned 24keV at 280uJ max.; 
after changes only around 150-200uJ was found and recovery took many hours. Therefore we will run for this week at 20keV for SA1 instruments.

CTRL:
- InfluxDB issue is done.

DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- Nothing to report.
- As PRC, Raul V. comments no major issues happened during the FD week.

XPD:
- Nothing to report.

DET:
- Nothing to report.

ITDM: 
- Follow-up of GPFS problems: ITDM got a fix that will be applied today late in the day.

XRO:
- Nothing to report.

LAS:
- SA3 PP-laser: the water and humidity in the diode was removed/ dried. Today LAS will evaluate if no humidity is found to start up laser today.

UNSYS:
- Issue with SA3 motors in undulator segments (2 motors in different positions) were solved.
- Three errors in SA2 were solved by the BKR.

SPB:
- For 20keV intensity after tuning was about 500uJ.
- Helped XRO for the FD week: small issues were solved.

FXE:
- Nothing to report; commissioning going successful.

MID:
- Ticket to CTRL on the last MID Tunnel imager was sent during the weekend (software problem) and is being investigated. A. Koch saying that changing the GUI shall restore the system. 
Wajid E. says a bug was fixed and also a work around can be applied. Alberto de Fanis also reports that this has also seen in SQS. Needs further investigation from CTRL.

HED:
- Not present.

SCS:
- Moving the chamber will likely happen on Wednesday (needs Hall crew support).

SQS:
- Nothing to report.
Entry   Notes XO Integration Meeting 07.09.2022, posted by Frederik Wolff-Fabris on 07 Sep 2022, 10:43 
General Announcement:
- With respect to the X-ray delivery parameters table: it is pre-filled with parameters agreed during the scheduling of user program. 
Should any deviation from the original parameters occur, this has to be discussed with XO to be seen if that can be accommodated. Please do not consider it just as communication and being granted.
- Manuel I. says the commissioning of mirrors for SXP will happen this FD week and they will try to bring beam inside experimental hutch.

CTRL:
- Reminder that interruption on data logger access today due to Influx-DB maintenance;
- Issue with PP-laser has been discussed yesterday and is under investigation by LAS if proposed solution is feasible.

DA:
- Off line calibration update today taking place: with 15-20 min downtime.

EEE:
- Investigating the digitizer artefacts from SQS.
- PLC team will recalibrate slits in SA3 tomorrow.
- Meeting in cw38 is scheduled for the timing issues with PP-laser.

VAC:
- Nothing to report.

XPD:
- All XPD devices are fine;
- Follow-up from SCS / access right in XGMs: The access rights for instruments were changed. This shall impede one instrument accessing controls for another beamline XGMs. 
Similar mistakes as seen last weekend shall not happen anymore.

DET:
- Nothing to report.

ITDM: 
- Follow up with GPFS problems last Tuesday at MID: something new was found this time and an update will be done in SA2 today (shall be unnoticed by users) and tested tomorrow. If successful to SA2 then it 
goes deployed to SA1 later.

XRO:
- Not present.

LAS:
- Meeting is set with P. Gessler and Tim Wilksen.
- Test tomorrow in SA1 taking place (trigger delay device).

UNSYS:
- Nothing to report.

SPB:
- All fine.

FXE:
- Nothing to report.

MID:
- XO can expect cw38 beam parameters this evening.

HED:
- Needs to move mirrors to Platinum strip this week for the next week run at 18keV. Naresh K. comments on the HXRSS studies this weekend at different photon energies and will communicate with XRO and HED 
on a strategy.

SCS:
- Announcement that end station will be moved inside the hutch on Friday or Monday.
- On the local power outage: reason is found and understood.

SQS:
- Not present.
Entry   Notes XO Integration Meeting 05.09.2022, posted by Frederik Wolff-Fabris on 05 Sep 2022, 10:07 
General Announcement:
- If an instrument experiences a feature of machine that does not work, please do not hesitate in contacting the PRC, who is there to support you.

CTRL:
- Nothing to report.

DA:
- On Wednesday an update with minor interruption is due to happen.

EEE:
- DOC announcement: there will be no DOC but DRC is in place (Patrick Gessler).
- Jour-fixe meeting is happening today at 13:00.

VAC:
- Nothing to report.
XPD:
- SA3 FEL Imager: under investigation.

DET:
- Nothing major to report.

ITDM: 
- Maintenance of GPFS system on Tuesday (user system for offline storage will not be available tomorrow).

XRO:
- Ticket for follow up of the SRA XTD1 interlock (motor positions do not correspond to actual location - to be investigated by EEE).
- Maurizio V. will be in OCD for XRO this week (blue week).

LAS:
- Issues with timing and triggers: work around by switching OFF the pattern. Further discussion to take place.
- Laser-2 change caused a damage to SPB laser. No optical damage, only electronics.
- SCS reported laser “disappeared”. Meeting and work shall involve DESY group. XO will reinforce with Desy.

UNSYS:
- Nothing to report.

SPB:
- Issue with Laser;
- Issue with XGM: loose single shot. It was reported to the PRC. 
Laurent M. says they tried to setup XGM when it went down. He proposes to setup a specific Karabo device that works only with the one in use. XPD will discuss offline.

FXE:
- Work with new cryo system this week.

MID:
- Info for DRC: MID expects to use beam on Sunday during the day.

HED:
- All fine at HED.

SCS:
- Issue with BAM stabilization. It was requested but due to issues it was turned OFF during the weekend. It took time to realize it was OFF and to find experts to bring up again.
- Power outage in some devices at the experimental hutch. TS was called and came to fix it. 
- Liubov S. says problem relates to the laser interlock occurred: it searched few times before one could eventually set it.

SQS:
- Issue with ADQ digitizer of Spie devices: more than one in one crate and in interleaved mode it gives a random artefact. 
It was discussed with EEE: vendor says there is nothing what can be done. If someone else has issues please join forces with SQS.
Entry   Notes XO Integration Meeting 21.03.2022, posted by Frederik Wolff-Fabris on 31 Aug 2022, 10:16 
General Announcement:
- Announcement from Martin Doering on the next Winter maintenance period: 1. presented timeline for the coming WMP; 2. minor changes to the maintenance task list; 3. pre-announce the electrical 
interruption that will happen on Dec. 3rd;
- Release of MTL takes place in 02.09; deadline for submitting MTL on Sep.30th; release of summary task list on Oct. 28th. WMP starts on Nov.29th.
- Electrical Interruption on December 3rd: 
Two interventions to be done (by TS and MKK1) in order to connect power to XHO1 and XHV and to upgrade transformer at XHVAC (allowing uninterrupted maintenances in future). 
Affected locations: XHQ, XHEXP1, XHWS, XHVAC, media duct XHVAC and XHPSC; tunnels XTD4,6,7,8,9,10; XSDU-1 and XSDU-2. No power on 03/Dec. from 06:00 to 18:00. No access to campus during this time.
Ramp-down of equipment on 02.12 up to 24:00: all systems have to be powered off. 
Electrical work conducted on 03/12.
Ramp-up on Sunday 04 and Monday 05 December. Sunday is for critical devices that can not wait until Monday to be switched ON.

Safety choice is to power OFF all equipment, regardless of the secondary power line; Saturday is chosen as has the least overall impact at the facility and in working conditions. 

- For questions please contact xo-planning@xfel.eu.

CTRL:
- Issue with PP-laser bunch configurator still remains and is under investigation.
DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- Nothing to report.

XPD:
- Nothing to report.

DET:
- FXE detector issue: problem remains but instrument manages to conduct experiment. Board has to be first exchanged by the expert who returns next week. 

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.

LAS:
- Issue with PP-laser multi pattern with CTRL.
- Random trigger issue with SA1:  had to set back-up again. DOC is investigating.

UNSYS:
- Nothing to report.

SPB:
- Nothing to report.

FXE:
- Nothing to report.

MID:
- All fine at MID.

HED:
- Nothing to report.

SCS:
- Beam operation last night: problems with 2-color in the night and also problem with a motor; both solved.
- Light from SA1 has been seen and will be investigated today.

SQS:
- Not present.
Entry   Notes XO Integration Meeting 29.08.2022, posted by Frederik Wolff-Fabris on 29 Aug 2022, 09:56 
General Announcement:
- During the next Wednesday XO Integration Meeting a kick-off presentation by Martin Doering will be done to present the next winter maintenance including an electrical activity that will shutdown almost 
the entire campus.

CTRL:
- Nothing to report.

DA:
- Nothing to report.

EEE:
- A ZZ together with VAC was done in SA1 tunnel yesterday night due to a failure of a terminal for a crate.
- Another ZZ to check piezo motors in SXP branch will happen today.

VAC:
- Apart of the downtime of yesterday nothing to report.

XPD:
- Nothing to report.
- Naresh K. as PRC informs that a mal function of a terminal for a VAC controller rack close to the XGM prevented vacuum operation and closed the XGM valve. After the ZZ by VAC OCD and EEE one could 
restart XGM.
- SA3 was down for 1:30 hours; after closing absorber in SA1 to allow SA3 beam only 30 bunches were allowed. To be addressed by the PRCs.
- Miscommunication with BKR operators on SAT at midnight asking for permission from SQS to change SA1 to 6keV, procedure that was done the whole week already. To be discussed with Desy RCs.

DET:
- Nothing to report. 
- As DRC Olivier Meyer informs it was a quite week, apart of the vacuum issue yesterday.

ITDM: 
- Nothing to report.

XRO:
- A ZZ together with EEE is requested today.

LAS:
- Laser operation was relatively smooth; few minor issues with trigger and timing delay; in contact with CTRL for solutions.

UNSYS:
- An OCD dedicated number for undulator issues is available: 9-4850

SPB:
- Nothing to report.

FXE:
- Problem with Jungfrau (data was noisy). Olivier M. comments that a call was received at the start of the week; an intervention was done and in his understanding no feedback from FXE was saying it was a 
show stopper.
- Changing in time by 1ns;
- E-log was giving error messages (unavailable). Patrick G. suspects of network issues but will be investigated.

MID:
- Users from two weeks ago will use beam next weekend at 12keV.

HED:
- Nothing to report; experiment was successful and has lots of data.

SCS:
- Not present.

SQS:
- Not present.
ELOG V3.1.4-7c3fd00