Group Selection Page HELP DOC Controls Group Data Analysis Group ITDM WP76 DET Vacuum XRO EEE WP78 WP74 FXE SCS SPB MID HED SQS SXP Sample Environment Photon Commissioning Team Operation PSPO XO TS
Technical integration and coordination SASE1 Status and SASE3 Readiness
  Technical integration and coordination logbook, Contact: A. Violante, G. Wellenreuther  Not logged in ELOG logo
Message ID: 392     Entry time: 06 Feb 2023, 12:48
Author: Frederik Wolff-Fabris 
Location: General 
Severity: Information 
Subject: Notes XO Integration Meeting 06.02.2022 
General Announcement:
- A. Galler shows at the TTFinfo schedule where to find information for operation calendars. 
- A. Silenzi inform that the Jour-Fixe takes place and instruments shall be present to inform on needed requests to DRC/DOC.
- As PRC, Harald Sinn informs the agreed RF window that was set on Friday was reversed on Saturday. Do not hesitate in contacting the PRC in such situations.

CTRL:
- Nothing to report.

DA:
- Nothing to report.

EEE:
- Two OCD calls on weekend: 
1. Issue with PP-laser setup at FXE/Mono in tunnels - to be followed by PLC team; 
2. Issue with SA3/SCS Exit SLIT in the tunnel to be followed up by ZZ. Couple of hours are needed in tunnel to try to fix it without guarantee of success.

VAC:
- Performing ZZ and breaking interlock in XTD10.

XPD:
- Jan G. says chamber for calorimeter and laser power meter are being installed in SPB hutch today.
- Tests of the IMG watchdog can take place only after lunch due to ongoing ZZ access.

DET:
- Nothing to report.

ITDM: 
- Nothing to report.

XRO:
- Not present.

LAS:
- Laser timing in SA1 is 3ns off.

UNSYS:
- Tunnel access ongoing in SA2.
- Replacement of the HXRSS crystal to take place today.

SPB:
- Wednesday morning Karabo server was down for 90min; it was fixed by the DOC.
- Chan Kim says that SPB/SFX had a wrong RF window set on Wednesday.
- Camera devices were showing issues (had to break interlock to reset camera) and needs a long term fix. 
Wajid E. says CTRL investigates with high priority and it seems not to be a Karabo issue. Investigation continues at CTRL hands.

FXE:
- Nothing to report.

MID:
- Problem with FSSS that is needed for the user experiment: CTRL and SEC are looking into it.

HED:
- Setup instrument; Karabo connections solved by DOC.
- Due to RF window AGIPD tests were delayed.
- A ZZ for checking a motor can be done still this morning.

SCS:
- Troubles with motors were addressed.
- Exit slit issue still pending.

SQS:
- Nothing to report.
ELOG V3.1.4-7c3fd00