Group Selection Page HELP DOC Controls Group Data Analysis Group ITDM WP76 DET Vacuum XRO EEE WP78 WP74 FXE SCS SPB MID HED SQS SXP Sample Environment Photon Commissioning Team Operation PSPO XO TS
Technical integration and coordination SASE1 Status and SASE3 Readiness
  Technical integration and coordination logbook, Contact: A. Violante, G. Wellenreuther  Not logged in ELOG logo
Message ID: 395     Entry time: 15 Feb 2023, 10:14
Author: Frederik Wolff-Fabris 
Location: General 
Severity: Information 
Subject: Notes XO Integration Meeting 15.02.2023 
General Announcement:
-	 

CTRL:
- Nothing to report.

DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- Nothing to report.

XPD:
- Working with SPB with laser power meter / calorimeter.

DET:
- Not present.

ITDM: 
- Announcement: on next Monday at around 8AM the E-log will not be available for a short time.

XRO:
- Working on SCS exit slit. Recommissioning with beam will need to be done. Next action in tunnel will happen on next Monday. Until then the slit is currently detached with cables. None shall move or touch 
the device.
- Regarding parts: they are ordered and shall arrive later this week.

LAS:
- Nothing to report.

UNSYS:
- Nothing to report.

SPB:
- Nothing to report.

FXE:
- Problem with Jungfrau 1M last night. Informed to DET.

MID:
- Motor of rotation for the spectrometer is not yet working to characterize seeding. EEE is investigating and may have to exchange motor.

HED:
- Beam pointing was realigned. It jitters and feedback tries to work. To be see along the day.

SCS:
- Nothing to report.

SQS:
- Nothing to report.

SXP:
- Nothing to report.
ELOG V3.1.4-7c3fd00