Notes XO Integration Meeting 13.04.2022, posted by Andreas Galler on 13 Apr 2022, 09:28
|
General Announcement:
No User operation meeting this Friday, instead cw 16 / cw 17 check will happen in Daily Operations Meeting at 15:30 on Thu Apr 14. Link |
Notes XO integration meeting 11.04.2022, posted by Andreas Galler on 11 Apr 2022, 09:10
|
General Announcement:
CTRL: |
Notes XO integration meeting 06.04.2022, posted by Andreas Galler on 06 Apr 2022, 09:15
|
General Announcement:
CTRL: |
Notes XO integration meeting 04.04.2022, posted by Andreas Galler on 04 Apr 2022, 09:26
|
General Announcement:
CTRL:
PP LAS restarting device servers for upgrading the device tag --> autoinstantiate some servers all topics
DA: |
Notes XO Integration Meeting 30.03.2022, posted by Frederik Wolff-Fabris on 30 Mar 2022, 09:51
|
General Announcement:
- A. Galler mentions that new Corona rules are in place. Please read the e-mail from Nicole E. from last Friday. In case of questions don’t hesitate
in contacting SRP and/or taskforce.
|
Notes XO Integration Meeting 28.03.2022, posted by Frederik Wolff-Fabris on 28 Mar 2022, 10:09
|
General Announcement and A.O.B.:
- BTM @ FXE was triggered on Saturday afternoon and only PRC was available to come onsite and fix the issue. Different procedures will be proposed to be
put in place.
|
Notes XO Integration Meeting 23.03.2022, posted by Frederik Wolff-Fabris on 23 Mar 2022, 10:04
|
General Announcement and A.O.B.:
- Sandra Plett announces that a fire drill will take place next Saturday 26.03 involving many areas at Schenefeld. It starts at 10:00AM and around 6 persons
will conduct the drill.
|
Notes XO Integration Meeting 21.03.2022, posted by Frederik Wolff-Fabris on 21 Mar 2022, 10:02
|
General Announcement:
- A. Silenzi will be the DRC this week and reminds FXE, SQS and MID to be present at the jour-fixe meeting today at 13:00.
|
Notes XO Int. Meeting 16.03.2022, posted by Frederik Wolff-Fabris on 16 Mar 2022, 10:39
|
General Announcement:
- The Summer maintenance planning period is approaching and next Wednesday at the end of the XO Int. Meeting a presentation of the changes/improvements
will be made.
|
Notes XO Int. Meeting 14.03.2022, posted by Frederik Wolff-Fabris on 14 Mar 2022, 10:41
|
General Announcement:
- On the Summer-22 maintenance period: In about 2 weeks (by end of March) the call for the summer/22 maintenance period will be send to the groups.
|
Notes XO Integration Meeting 09.03.2022, posted by Frederik Wolff-Fabris on 09 Mar 2022, 10:15
|
General Announcement:
-
|
Notes XO Integration Meeting 07.03.2022 , posted by Frederik Wolff-Fabris on 07 Mar 2022, 10:39
|
General Announcement:
- Accelerator is now running at 11.5GeV for the next 4 delivery weeks. The SA1 and SA3 systems show already good photon intensities and at SA2 the Self-seeding
setup is taking place today.
|
Notes XO Integration Meeting 02.03.2022, posted by Frederik Wolff-Fabris on 02 Mar 2022, 10:12
|
General Announcement:
- There is a high probability that we will run out of Helium gas due to difficulties with stock. If an instrument needs He on next weeks please get in
touch with TS to verify its availability.
|
Notes XO Integration Meeting 28.02.2022, posted by Frederik Wolff-Fabris on 28 Feb 2022, 10:35
|
General Announcement:
- This week a facility development week takes place without user operation. XO thanks the groups for posting at the Operations-2022 e-log.
|
Notes XO Integration Meeting 23.02.2022, posted by Frederik Wolff-Fabris on 23 Feb 2022, 10:30
|
General Announcement:
- A. Galler reminds instruments and support groups to feel welcome in making regular entries on the Operations-2022 e-log.
|
Notes XO Integration Meeting 21.02.2022, posted by Frederik Wolff-Fabris on 21 Feb 2022, 11:57
|
General Announcement:
- Philipp S. says a downtime for the calibration / GPFS update is to be done today at 12:00.
- Raul V. says that the biggest issue of last PRC week was related to the FXE beam pointing. In general, was a quiet and productive week. Please, instrument |
Notes XO Integration Meeting 16.02.2022, posted by Frederik Wolff-Fabris on 16 Feb 2022, 10:42
|
General Announcement:
- XO launched a new XO Alfresco presence. Please check there for information related to operations and do not hesitate in giving suggestions or raising
questions.
|
Notes XO Integration Meeting 14.02.2022, posted by Frederik Wolff-Fabris on 14 Feb 2022, 10:02
|
General Announcement:
- Thanks to instruments that posted at the Operations-2022 e-log. Please make regular entries that allow PRCs to recognize eventual issues that have to
be tracked down.
|
Notes XO Integration Meeting 09.02.2022, posted by Frederik Wolff-Fabris on 09 Feb 2022, 10:09
|
General Announcement:
CTRL:
|
Notes XO Integration Meeting 07.02.2022, posted by Frederik Wolff-Fabris on 07 Feb 2022, 10:56
|
General Announcement:
- Power glitch on Sunday morning at around 04:00AM seems to have no effect at machine or Schenefeld site.
|