Group Selection Page HELP DOC Controls Group Data Analysis Group ITDM WP76 DET Vacuum XRO EEE WP78 WP74 FXE SCS SPB MID HED SQS SXP Sample Environment Photon Commissioning Team Operation PSPO XO TS
Technical integration and coordination SASE1 Status and SASE3 Readiness
  Technical integration and coordination logbook, Contact: A. Violante, G. Wellenreuther  Not logged in ELOG logo
Message ID: 380     Entry time: 07 Dec 2022, 12:06
Author: Frederik Wolff-Fabris 
Location: General 
Severity: Information 
Subject: Notes XO Integration Meeting 07.12.2022 
General Announcement:
- Tobias Clever informs to contact TS (Oleg E.) in case of broken fuses (see UNSYS).
- Regarding liquified gases: the XHCrew does not provide safety trainings nor is the main contact for supplying gases or cryogenics. 
Please contact TS will enquires regarding technical gases or cryogenic liquids. TS is the main point of contact for this matters.
- Regarding network problems yesterday: Desy exchanged a switch for a new one and it was when problem happens. Office telephones are currently not working. A new ticket to NOC was issued. 

CTRL:
- Started the topics back after the power maintenance. Not all devices are up as there is some updates to be done in the next days/week. The ramp-up went fine for the topics that were restarted.

DA:
- Nothing to report.

EEE:
- Results of the check after the power cut show no damage.
- PLCs were also recovered.
- uTCA went up and the planned update of fast-ADC will take place next week after the Karabo update. Please do not use fast ADC until then and contact Bruno F. in case of questions.

VAC:
- Continue with scheduled works for the WMP.
- From Saturday task: everything was recovered without main issues.

XPD:
- Nothing to report.

DET:
- Not present.

ITDM: 
- Not present.

XRO:
- Electrical shutdown went well in tunnels.
- From yesterday once Karabo is back: XRO is checking again systems.
- An update of tasks for the WMP will be send to XO as some tasks were cancelled.

LAS:
- No issues from the power shutdown. All are fine.

UNSYS:
- SA3 balcony room had a problem after the power shutdown - fuse was broken; Now it is working.

SPB:
- All going fine, tests with Jets today.

FXE:
- Examining CRL lenses.

MID:
- All fine at MID.

HED:
- Not present.

SCS:
- Switching ON components and so far no damaged devices were found.
- Normal maintenance program is ongoing.

SQS:
- Restarting devices and no damaged components were found already.