Notes XO Integration Meeting 23.07.2025, posted by Frederik Wolff-Fabris on 23 Jul 2025, 09:25
|
General Announcement:
- Martin Doering informs on the LIMP-25:
1. Today it happen crane activities in the XHEXP1 and please take the appropriated safety measurements when craning takes place.
|
Notes XO Integration Meeting 21.07.2025, posted by Frederik Wolff-Fabris on 21 Jul 2025, 09:54
|
General Announcement:
- M. Doering informs on the Limp-25 / current week:
1. Cooling water maintenance in XHPSC: replacement of valves taking place and the filling back is ongoing; expected that cooling water will be back today. |
Notes XO Integration Meeting 16.07.2025, posted by Frederik Wolff-Fabris on 16 Jul 2025, 09:51
|
General Announcement:
- Martin Doering informs on the LIMP-25 on cw30:
|
Notes XO Integration Meeting 14.07.2025, posted by Frederik Wolff-Fabris on 14 Jul 2025, 09:59
|
General Announcement:
- On Crane activities:
1. Next craning activity from truck bay to HXS area will take place on Wednesday 16.07 from early morning. During the time helmets will be provided in |
Notes XO Integration Meeting 09.07.2025, posted by Frederik Wolff-Fabris on 09 Jul 2025, 08:32
|
General Announcement:
- LIMP-25 update for this week: elevators were to be maintained this week but it is now shifted to 16-19.July.
- A. Galler announces on the LIMP-25 regarding next week:
|
Notes XO Integration Meeting 07.07.2025, posted by Frederik Wolff-Fabris on 07 Jul 2025, 09:44
|
General Announcement:
- Martin Doering announces:
1. Karabo will be stopped this week accordingly to a distributed e-mail;
|
Notes XO Integration Meeting 02.07.2025, posted by Frederik Wolff-Fabris on 02 Jul 2025, 10:03
|
General Announcement:
- M. Doering announces on the LIMP-25:
1. Old's AIBS removal is starting already this week (today), after agreement between Inaki de Diego and instruments;
|
Notes XO Integration Meeting 30.06.2025, posted by Frederik Wolff-Fabris on 30 Jun 2025, 09:58
|
General Announcement:
- M. Doering announces one schedule change on the test of mobile electrical equipment during the LIMP-25:
Company doing it finished Desy premises earlier and from this week they start at EuXFEL in offices and then on the labs. If you have equipment to be tested |
Notes XO Integration Meeting 25.06.2025, posted by Frederik Wolff-Fabris on 25 Jun 2025, 10:27
|
General Announcement:
- Martin Doering informs on the LIMP-25:
1. Friday the summer party takes place; please deliveries with big trucks shall be re-scheduled;
|
Notes XO Integration Meeting 23.06.2025, posted by Frederik Wolff-Fabris on 23 Jun 2025, 10:19
|
General Announcement:
- Martin Doering informs on the LIMP-2025:
1. Tunnels were opened from 7AM today;
|
Notes XO Integration Meeting 18.06.2025, posted by Frederik Wolff-Fabris on 18 Jun 2025, 09:47
|
General Announcement:
- LIMP-25 information: Martin Doering informs:
1. Monday 7AM the tunnels are open but smoke extraction system tests is planned from 8AM to 10AM so that tunnels will be noisy and doors difficult to open; |
Notes XO Integration Meeting 16.06.2025, posted by Frederik Wolff-Fabris on 16 Jun 2025, 09:41
|
General Announcement:
- A. Galler says a second Cryo issue happened on Saturday but it was possible to recovered by 18:00.
- LIMP-25 is about to start in one week. In case of questions please do not hesitate in contacting Martin Doering and XO.
|
Notes XO Integration Meeting 11.06.2025, posted by Frederik Wolff-Fabris on 11 Jun 2025, 09:48
|
General Announcement:
-
|
Notes XO Integration Meeting 04.06.2025, posted by Frederik Wolff-Fabris on 04 Jun 2025, 09:44
|
General Announcement:
-
|
Notes XO Integration Meeting 02.06.2025, posted by Frederik Wolff-Fabris on 02 Jun 2025, 09:51
|
General Announcement:
- The ongoing delivery sees a HXRSS at 12GeV with 1mJ total intensity (~350uJ background).
|
Notes XO Integration Meeting 28.05.2025, posted by Frederik Wolff-Fabris on 28 May 2025, 09:42
|
General Announcement:
-
|
Notes XO Integration Meeting 26.05.2025, posted by Frederik Wolff-Fabris on 26 May 2025, 09:56
|
General Announcement:
- A. Galler mentions the V0 was operated by another group after being interlock on Saturday by a vacuum issue in XTD6 while VAC-OCD was investigating the
issue.
|
Notes XO Integration Meeting 21.05.2025, posted by Frederik Wolff-Fabris on 21 May 2025, 09:36
|
General Announcement:
-
|
Notes XO Integration Meeting 19.05.2025, posted by Frederik Wolff-Fabris on 19 May 2025, 09:42
|
General Announcement:
- Harald Sinn inform on the first lasing for XFELO on Sunday morning shift; 100 bunches in the pulse train was giving synchrotron already on Saturday showing
the cavity was aligned.
|
Notes XO Integration Meeting 14.05.2025, posted by Frederik Wolff-Fabris on 14 May 2025, 09:39
|
General Announcement:
- As PRC, Jan Gruenert reports a problem with fire detection system in XTD4 needed the entire day yesterday to fix and by 18:00 was concluded. The North
branch was
|