Group Selection Page HELP Controls Group Data Analysis Group ITDM WP76 DET Vacuum EEE WP78 FXE SPB HED SQS SXP Sample Environment Operation PSPO XO TS Migrated2Zulip
Technical integration and coordination SASE1 Status and SASE3 Readiness
  Technical integration and coordination logbook, Contact: A. Violante, G. Wellenreuther, Page 1 of 32  Not logged in ELOG logo
Entry   Notes XO Integration Meeting 23.07.2025, posted by Frederik Wolff-Fabris on 23 Jul 2025, 09:25 
General Announcement:
- Martin Doering informs on the LIMP-25: 
1. Today it happen crane activities in the XHEXP1 and please take the appropriated safety measurements when craning takes place. 
Entry   Notes XO Integration Meeting 21.07.2025, posted by Frederik Wolff-Fabris on 21 Jul 2025, 09:54 
General Announcement:
- M. Doering informs on the Limp-25 / current week: 
1. Cooling water maintenance in XHPSC: replacement of valves taking place and the filling back is ongoing; expected that cooling water will be back today.
Entry   Notes XO Integration Meeting 16.07.2025, posted by Frederik Wolff-Fabris on 16 Jul 2025, 09:51 
General Announcement:

- Martin Doering informs on the LIMP-25 on cw30: 
Entry   Notes XO Integration Meeting 14.07.2025, posted by Frederik Wolff-Fabris on 14 Jul 2025, 09:59 
General Announcement:
- On Crane activities: 
1. Next craning activity from truck bay to HXS area will take place on Wednesday 16.07 from early morning. During the time helmets will be provided in
Entry   Notes XO Integration Meeting 09.07.2025, posted by Frederik Wolff-Fabris on 09 Jul 2025, 08:32 
General Announcement:
- LIMP-25 update for this week: elevators were to be maintained this week but it is now shifted to 16-19.July. 
- A. Galler announces on the LIMP-25 regarding next week: 
Entry   Notes XO Integration Meeting 07.07.2025, posted by Frederik Wolff-Fabris on 07 Jul 2025, 09:44 
General Announcement:
- Martin Doering announces: 
1. Karabo will be stopped this week accordingly to a distributed e-mail; 
Entry   Notes XO Integration Meeting 02.07.2025, posted by Frederik Wolff-Fabris on 02 Jul 2025, 10:03 
General Announcement:
- M. Doering announces on the LIMP-25: 
1. Old's AIBS removal is starting already this week (today), after agreement between Inaki de Diego and instruments; 
Entry   Notes XO Integration Meeting 30.06.2025, posted by Frederik Wolff-Fabris on 30 Jun 2025, 09:58 
General Announcement:
- M. Doering announces one schedule change on the test of mobile electrical equipment during the LIMP-25: 
Company doing it finished Desy premises earlier and from this week they start at EuXFEL in offices and then on the labs. If you have equipment to be tested
Entry   Notes XO Integration Meeting 25.06.2025, posted by Frederik Wolff-Fabris on 25 Jun 2025, 10:27 
General Announcement:
- Martin Doering informs on the LIMP-25: 
1. Friday the summer party takes place; please deliveries with big trucks shall be re-scheduled; 
Entry   Notes XO Integration Meeting 23.06.2025, posted by Frederik Wolff-Fabris on 23 Jun 2025, 10:19 
General Announcement:
- Martin Doering informs on the LIMP-2025: 
1. Tunnels were opened from 7AM today; 
Entry   Notes XO Integration Meeting 18.06.2025, posted by Frederik Wolff-Fabris on 18 Jun 2025, 09:47 
General Announcement:
-  LIMP-25 information: Martin Doering informs: 
1. Monday 7AM the tunnels are open but smoke extraction system tests is planned from 8AM to 10AM so that tunnels will be noisy and doors difficult to open;
Entry   Notes XO Integration Meeting 16.06.2025, posted by Frederik Wolff-Fabris on 16 Jun 2025, 09:41 
General Announcement:
- A. Galler says a second Cryo issue happened on Saturday but it was possible to recovered by 18:00.
- LIMP-25 is about to start in one week. In case of questions please do not hesitate in contacting Martin Doering and XO.
Entry   Notes XO Integration Meeting 11.06.2025, posted by Frederik Wolff-Fabris on 11 Jun 2025, 09:48 
General Announcement:
-  
Entry   Notes XO Integration Meeting 04.06.2025, posted by Frederik Wolff-Fabris on 04 Jun 2025, 09:44 
General Announcement:
-  
Entry   Notes XO Integration Meeting 02.06.2025, posted by Frederik Wolff-Fabris on 02 Jun 2025, 09:51 
General Announcement:
- The ongoing delivery sees a HXRSS at 12GeV with 1mJ total intensity (~350uJ background). 
Entry   Notes XO Integration Meeting 28.05.2025, posted by Frederik Wolff-Fabris on 28 May 2025, 09:42 
General Announcement:
-  
Entry   Notes XO Integration Meeting 26.05.2025, posted by Frederik Wolff-Fabris on 26 May 2025, 09:56 
General Announcement:
- A. Galler mentions the V0 was operated by another group after being interlock on Saturday by a vacuum issue in XTD6 while VAC-OCD was investigating the
issue. 
Entry   Notes XO Integration Meeting 21.05.2025, posted by Frederik Wolff-Fabris on 21 May 2025, 09:36 
General Announcement:
-  
Entry   Notes XO Integration Meeting 19.05.2025, posted by Frederik Wolff-Fabris on 19 May 2025, 09:42 
General Announcement:
- Harald Sinn inform on the first lasing for XFELO on Sunday morning shift; 100 bunches in the pulse train was giving synchrotron already on Saturday showing
the cavity was aligned. 
Entry   Notes XO Integration Meeting 14.05.2025, posted by Frederik Wolff-Fabris on 14 May 2025, 09:39 
General Announcement:
- As PRC, Jan Gruenert reports a problem with fire detection system in XTD4 needed the entire day yesterday to fix and by 18:00 was concluded. The North
branch was 
ELOG V3.1.4-7c3fd00