Status and plans after Readiness Meeting, posted by Gerd Wellenreuther on 12 Jan 2018, 11:10
|
SPB:
-
AGIPD was tested with old mc board to verify that it was working fine
after the in-vacuum intervention in Dec 2017. The detector is working
and also
the vacuum is ok.
- The exchange of the mc and mfpga boards is ongoing and will continue
next week (according to planning)
FXE:
- |
FXE/SPB/PPL Timing Update, posted by Bruno Fernandes on 11 Jan 2018, 15:17
|
Hi everyone,
after talking with the responsabile people, here's the timetable for the Timing firmware/server update:
FXE/SPB/PPL x2timer update timetable
|
Update Timing Firmware/Doocs Server, posted by Bruno Fernandes on 11 Jan 2018, 11:04
|
Dear all,
an update of the Timing boards firmware and doocs server is require. This operation should not take more than 10 minutes per device; during this
time no timing signals will be generate (clocks/triggers/bunch patterns/etc.). Naturally, problems may occur during this update which will lead to increase |
MicroTCA in rack 3.4/XTD10, posted by Bruno Fernandes on 10 Jan 2018, 17:35
|
The MicroTCA crate used in rack 3.4 (XTD10) has been replaced. The system is up and running. Timing information is properly distributed from this system
to the MicroTCA system in rack 3.2 and XGMXTD10. |
1Hz Triggers , posted by Bruno Fernandes on 10 Jan 2018, 17:20
|
Hello everyone,
The main Timing System at DESY, which distributes all timing information to our systems, is right now configured to generate 1Hz trigger signals
on Event #16. This is the trigger that is deliver to most detectors/cameras on our site. |
FXE Mono, posted by Dennis Goeries on 10 Jan 2018, 14:54
|
Hi,
the FXE Mono's won't be available via Karabo from 15.30 onwards due to an update from CAS (karabo) and ITDM (server).
Best,
Dennis |
Status and plans after Readiness meeting, posted by Monica Aresté on 10 Jan 2018, 13:22
|
PSPO:
- G.Wellenreuther inform that MKK is planning to test the Umschaltautomatik, this will affect XHE1, XHE3, XHPSC, XHEXP, XHVAC. Oleg Engelmann
will send a mail with detailed information. |
Re: Status and plans after Readiness meeting, posted by Hugo Silva Santos on 10 Jan 2018, 14:53
|
Dear Monica,
Just one small correction at "Karabo 2.2.0 being deploy today for FXE." The version is, actually, Karabo 2.2.1 that we released yesterday. |
Shutdown of compressed air distribution in XTDs today, posted by Martin Dommach on 09 Jan 2018, 10:32
|
Dear all,
we got the information from MKK, that they have to fix a leak in the main compressed air line. Therefore they will close the valves to the tunnels
for approximately one hour starting today at 1 p.m. |
Access to XTDs, posted by Gerd Wellenreuther on 09 Jan 2018, 10:14
|
Dear all,
according to H. Sinn the closing of the XTDs 2, 4 and 10 will be delayed until the 30th of January.
Cheers, Gerd |
Status and plans after Readiness Meeting, posted by Monica Aresté on 08 Jan 2018, 13:47
|
PSPO:
- G. Wellenreuther inform that DESY is commissioning a new gun in the injector that could take longer than expected. Harald
Sinn is in a meeting today to disccuss this issue, any change in the scheduled will be reported. |
Reminder Readiness meeting today at 13:00, posted by Monica Aresté on 08 Jan 2018, 09:50
|
Dear all,
This is a reminder to inform you that Readiness meeting will resume today at 13:00.
Best regards and Happy New Year !! |
Status and plans after Readiness Meeting, posted by Gerd Wellenreuther on 18 Dec 2017, 10:48
|
PSPO:
M. Areste presented a report about the progress so far achieved in the shutdown (see Indico for details).
Most tasks are ongoing,
on schedule.
Few still have to be scheduled, mostly because support groups wait for feedback.
C. Youngman does detailed coordination |
FXE Collimating CRL, posted by Lewis Batchelor on 14 Dec 2017, 09:12
|
The LENS_3X limit switch (switched when driving towards the chamber center) is broken and must be replaced, hence further work is required on the next
JJ visit 9/10 Jan (TBC)
The in vacuum components also need further work during the above visit. The lens that lost alignment during commissioning was also found to be |
Status and plans after SASE1 Status/SASE3 Readiness Meeting, posted by Tobias Haas on 13 Dec 2017, 16:28
|
General
Meeting on Friday will take place at 1300 due to overlap with XDAC
M. Areste shall ask for updates on task list on Thursday
Instruments
SPB
Work on AGIPD is ahead of schedule. Closing of detector should happen at the beginning of next week
Additional |
Fire alarms in tunnels and shafts on 13 Dec 9 - 11, posted by Tobias Haas on 08 Dec 2017, 15:49
|
FYI
Author: F. Saretzki |
Status and plans after SASE1 Status/SASE3 Readiness Meeting, posted by Tobias Haas on 08 Dec 2017, 11:35
|
General
Starting from next week shutdown activities will be tracked using M. Aresté's list
Dispatch meeting on Monday
and Wednesday at 13:00
Next Friday Readiness meeting also at 13:00 because of conflict with XDAC
Instruments |
Rack extinguishing system in SASE2, posted by Tobias Haas on 07 Dec 2017, 09:04
|
Please note following info from DESY:
Author: F. Saretzki |
SASE1 MOV, posted by NEREA JARDON on 06 Dec 2017, 17:17
|
The Motion loop in SASE1 is totally operated again. |
Status report after dispatch meeting 13:00, posted by Adriano Violante on 06 Dec 2017, 13:46
|
General:
Shutdown started.
Instruments
SPB:
AGIPD prepared for exchange modules intervention
AE is in contact with SPB for crates issues fixing
The |
Status after 0930 meeting, posted by Tobias Haas on 04 Dec 2017, 10:56
|
General:
User operation with good beam conditions over the weekend
One interlock trip in the FXE branch in XTD9. Restored by CAS
Shutdown
starts tomorrow at 08:00.
Next dispatch meeting takes place Wednesday at 13:00. A reminder will be sent.