Message ID: 445     Entry time: 10 Jan 2018, 17:35
Author: Bruno Fernandes 
Location: XTD10 
Severity: Information 
Subject: MicroTCA in rack 3.4/XTD10 

The MicroTCA crate used in rack 3.4 (XTD10) has been replaced. The system is up and running. Timing information is properly distributed from this system to the MicroTCA system in rack 3.2 and XGMXTD10.