Entry   Karabo testing, posted by Andreas Koch on 08 Mar 2017, 16:08 
End switch testing: the in-position end switch stopped devices working, also stopped gateway connection. Stroke of motor is not correct, parameter list
to be checked. More details in "Improvements / bug list".
Entry   Interlock tests DPS, posted by NEREA JARDON on 08 Mar 2017, 13:11 
The interlock test in XTD9-DPS has been done. The Vacuum PLC is again available for Karaboo.
Entry   Karabo testing on Wednesday, posted by Andreas Koch on 07 Mar 2017, 11:09 
As discussed with Wajid, I am availalbe tomorrow Wednesday the whole day to continue testing Karabo, motion loop. Wajid checked with Narea. I understand
that there may be interruptions and that I have not first priority. Thanks, Andreas
Entry   XTD9-DPS, posted by NEREA JARDON on 07 Mar 2017, 10:21 
Dear all,
Tomorrow morning, 08th of March at 09.30h. I will be in the tunnel doing interlock tests in the DPS-XTD9 with Raúl.
Therefore I will need the connection of the TCP_Client in the Vacuum loop (just to let know Karaboo people).
Entry   Pop-In II-45 Karabo test, posted by Andreas Koch on 06 Mar 2017, 18:14 







Normal
0


21


false
false
false
Entry   Minutes of weekly SASE1 Readiness Meeting, posted by Tobias Haas on 03 Mar 2017, 16:46 
 Here is the link to the minutes Minutes
Entry   Update of Component Priority list after weekly meeting, posted by Tobias Haas on 03 Mar 2017, 16:40 170303_Components-Priority-list.xlsx
 
Entry   Vacuum PLC, posted by NEREA JARDON on 02 Mar 2017, 11:55 
Dear all,
The Vacuum PLC is up and running and Karaboo guys have already started to work with it.
Thank you and regards
Entry   PLC work, posted by NEREA JARDON on 02 Mar 2017, 09:52 
Dear all,

Right now the Motion PLC is up and running. We are still working in the Vacuum one, today by midday should be also working.
Entry   Reminder: Stable operation and development periods, posted by Tobias Haas on 28 Feb 2017, 11:38 
One word of clarification:
The discussion last Friday left some people uncertain over how to define stable operation and development periods. Hence I had a discussion with
Nerea and Alessandro and agreed on the following:
Entry   Update of component list after weekly meeting, posted by Tobias Haas on 24 Feb 2017, 16:33 240217_Components-XTD2-9.xlsx
 
Entry   Meeting Minutes 24 Feb 2017, posted by Frederike Wittmaack on 24 Feb 2017, 15:22 
http://tinyurl.com/hhu998t
Entry   work on FXE distribution mirror chamber, posted by Martin Dommach on 24 Feb 2017, 15:15 
Dear all,
on Monday, 27th in the morning we will start with preparation work for the mirror installation in XTD9.
The mirror chamber (VS10130) will be vented and opened. This will affect:
Entry   work on FXE distribution mirror chamber, posted by Martin Dommach on 24 Feb 2017, 15:14 
Dear all,
on Monday, 27th in the morning we will start with preparation work for the mirror installation in XTD9.
The mirror chamber (VS10130) will be vented and opened. This will affect:
Entry   Updated Component status list, posted by Thomas Tschentscher on 17 Feb 2017, 12:40 170217_Components-XTD2-9.xlsx
See the updated component status list for XTD2 and XTD9 tunnels. As discussed at the SASE1 readiness mtg this morning. Yellow fields indicate new/changed
entries. Please let me/THaas know if there are errors or further changes to be reported.
I also entered the SASE1 instruments now a 'High Priority' items.
However, we may need to adapt the table for These entries as the work flow seems different.
Entry   Motion loop feedback, posted by Alessandro Silenzi on 17 Feb 2017, 09:56 20170217Motion.txt
Quick feedback during the meeting:
- 63 Devices
- 29 Motors
Entry   Motion loop status, posted by Alessandro Silenzi on 15 Feb 2017, 20:20 20170215MotionLoop.txt
The motion loop is as of 18:40 online.
the current status of the devices as seen by the Karabo is shown in the attachment:
In summary 63 devices (29 Motors):
Entry   Current Vacuum Status, posted by Alessandro Silenzi on 15 Feb 2017, 20:10 20170215Vacuum.txt
The PLC is still not completely error free.
It is considerably better performing than the last days:
the current average pressure as measured by the Ion Pumps is 4.21e-09 mBar
Entry   Beckhoff loop status, posted by Alessandro Silenzi on 14 Feb 2017, 09:59 
2017.02.13 19:30 Status:
- Self-Description back in shape.
- Bad SelfDescription reproduced in BeckhoffSim (Karabo implemented PLC communication) and solved in BeckhoffCom (Karabo "PLC Client").
Entry   Current Status, posted by Alessandro Silenzi on 12 Feb 2017, 14:02 Motors_Parameters.xlsx
 Vacuum loop:
- Interface between PLC and Karabo is not functioning.
The fault currently resides in the PLC behaviour, the self-description sent out is badly formatted (due to a buffer overrun)