Group Selection Page HELP Controls Group ITDM Vacuum WP78 FXE SPB HED SQS SXP Sample Environment PSPO XO TS Migrated2Zulip Archived2GitlabPages Archived2PDF MigratedByGroup
SASE1 Status and SASE3 Readiness
  Joint Operation and Readiness Logbook, Contact: T.Haas, A. Violante, G. Wellenreuther  Not logged in ELOG logo
Message ID: 26     Entry time: 26 Jan 2017, 13:10
Author: Tobias Freyermuth 
Location: XTD2 
Severity: Information 
Subject: Modification of the vacuum PLC loop 

The PLC program was modified and downloaded to the PLC, due to allow work on the XGM crate in rack 1.3.

The PLC vacuum loop includes now all vacuum crates in the racks from rack 1.1 to rack 1.7 except rack 1.3 (XGM)

ELOG V3.1.4-7c3fd00