Technical integration and coordination SASE1 Status and SASE3 Readiness
  Joint Operation and Readiness Logbook, Contact: T.Haas, A. Violante, G. Wellenreuther, Page 25 of 30  Not logged in ELOG logo
Entry   Status reports after dispatch meeting 13:00 4.4., posted by Gerd Wellenreuther on 04 Apr 2018, 13:43 
Entry   Control network maintenance, posted by Janusz Szuba on 04 Apr 2018, 17:35 
Entry   maintenance of the online storage system, posted by Janusz Szuba on 04 Apr 2018, 17:46 
Entry   Emergency off test in SPB/FXE - Update, posted by Adriano Violante on 09 Apr 2018, 11:50 
Entry   Status report after dispatch meeting 13:00, posted by Adriano Violante on 09 Apr 2018, 14:25 
Entry   Karabo deployment dates, posted by Adriano Violante on 09 Apr 2018, 14:37 
Entry   Status report after dispatch meeting 13:00, posted by Adriano Violante on 11 Apr 2018, 13:48 
Entry   Water cooling mointenance by MKK done, posted by Adriano Violante on 12 Apr 2018, 15:34 
Entry   Karabo 2.2.3 installation, posted by Adriano Violante on 13 Apr 2018, 07:50 
Entry   SASE3 E.21 and E.22 electrical power distribution, posted by Torsten Schoen on 13 Apr 2018, 09:05 
Entry   Emergency off test in SPB/FXE, posted by Adriano Violante on 13 Apr 2018, 09:40 
Entry   Dates TÜV Test SASE3 Intelrocks, posted by Adriano Violante on 13 Apr 2018, 13:01 
Entry   Shutdown MicroTCA4 SPB and FXE, posted by NEREA JARDON on 13 Apr 2018, 13:50 
Entry   Emergency off test in FXE - Update and next steps, posted by Adriano Violante on 16 Apr 2018, 12:38 
Entry   Status report after dispatch meeting 13:00, posted by Adriano Violante on 16 Apr 2018, 14:20 
Entry   SPB emergency power off tests, posted by Torsten Schoen on 17 Apr 2018, 14:23 
Entry   Status report after dispatch meeting 13:00, posted by Adriano Violante on 18 Apr 2018, 13:43 
Entry   Tunnel closing after shutdown, posted by Gerd Wellenreuther on 18 Apr 2018, 15:06 
Entry   Status report after dispatch meeting 13:00, posted by Adriano Violante on 23 Apr 2018, 15:35 
Entry   SASE3 MOV1 loop update, posted by Marijan Stupar on 25 Apr 2018, 11:42 