Group Selection Page HELP Controls Group ITDM Vacuum WP78 SPB SQS XO ToBeMigrated2XWiki ToBeMigrated2GitlabPages ToBeMigratedByGroup Migrated2Zulip Archived2PDF not2MigrateOrArchive
SCS SXP Migrated2Zulip Photon Commissioning Team XRO DOC HED Migrated2Zulip WP74 MID PSPO_XO XO_Operation SQS Migrated2Zulip FXE Migrated2Zulip DET Sample Environment SPB Migrated2Zulip
SASE1 Status and SASE3 Readiness Technical integration and coordination
  Joint Operation and Readiness Logbook, Contact: T.Haas, A. Violante, G. Wellenreuther, Page 25 of 30  Not logged in ELOG logo
Entry   Status reports after dispatch meeting 13:00 4.4., posted by Gerd Wellenreuther on 04 Apr 2018, 13:43 
Entry   Control network maintenance, posted by Janusz Szuba on 04 Apr 2018, 17:35 
Entry   maintenance of the online storage system, posted by Janusz Szuba on 04 Apr 2018, 17:46 
Entry   Emergency off test in SPB/FXE - Update, posted by Adriano Violante on 09 Apr 2018, 11:50 
Entry   Status report after dispatch meeting 13:00, posted by Adriano Violante on 09 Apr 2018, 14:25 
Entry   Karabo deployment dates, posted by Adriano Violante on 09 Apr 2018, 14:37 
Entry   Status report after dispatch meeting 13:00, posted by Adriano Violante on 11 Apr 2018, 13:48 
Entry   Water cooling mointenance by MKK done, posted by Adriano Violante on 12 Apr 2018, 15:34 
Entry   Karabo 2.2.3 installation, posted by Adriano Violante on 13 Apr 2018, 07:50 
Entry   SASE3 E.21 and E.22 electrical power distribution, posted by Torsten Schoen on 13 Apr 2018, 09:05 
Entry   Emergency off test in SPB/FXE, posted by Adriano Violante on 13 Apr 2018, 09:40 
Entry   Dates TÜV Test SASE3 Intelrocks, posted by Adriano Violante on 13 Apr 2018, 13:01 
Entry   Shutdown MicroTCA4 SPB and FXE, posted by NEREA JARDON on 13 Apr 2018, 13:50 
Entry   Emergency off test in FXE - Update and next steps, posted by Adriano Violante on 16 Apr 2018, 12:38 
Entry   Status report after dispatch meeting 13:00, posted by Adriano Violante on 16 Apr 2018, 14:20 
Entry   SPB emergency power off tests, posted by Torsten Schoen on 17 Apr 2018, 14:23 
Entry   Status report after dispatch meeting 13:00, posted by Adriano Violante on 18 Apr 2018, 13:43 
Entry   Tunnel closing after shutdown, posted by Gerd Wellenreuther on 18 Apr 2018, 15:06 
Entry   Status report after dispatch meeting 13:00, posted by Adriano Violante on 23 Apr 2018, 15:35 
Entry   SASE3 MOV1 loop update, posted by Marijan Stupar on 25 Apr 2018, 11:42 
ELOG V3.1.4-7c3fd00