ID |
Date |
Author |
Location |
Severity |
Subject |
220
|
11 May 2017, 12:43 |
Alessandro Silenzi | General | Information | New Deployment of Karabo for the SASE1 control machines. |
I will ramp down the system and bring it back up during the lunch break after installing the
tag 2.1.10.
To install a new version of Karabo use the script attached on your terminal
move your the karabo directory to a backup or remove it.
to backup:
$ mv ~/karabo ~/karabo.bkp
to remove:
$ rm -fr ~/karabo
then execute:
$ bash PATHTO/download.sh |
Attachment 1: download.sh
|
#!/bin/bash
if [ -z ${outfilename} ]
then
outfilename=.karabo.sh
fi
echo $outfilename
git clone https://xfel.redmine:K9Sss5CmWtQ_nbx3gyt2@git.xfel.eu/gitlab/Karabo/commissioning-guidelines .temp-commissioning --depth=1
cp -f .temp-commissioning/project_generation/install.sh .install.sh
rm -fr .temp-commissioning
. .install.sh
rm ${outfilename}
rm .install.sh
|
221
|
11 May 2017, 15:08 |
Alessandro Silenzi | General | Information | New Deployment of Karabo for the SASE1 control machines. |
Alessandro Silenzi wrote: |
I will ramp down the system and bring it back up during the lunch break after installing the
tag 2.1.10.
To install a new version of Karabo use the script attached on your terminal
move your the karabo directory to a backup or remove it.
to backup:
$ mv ~/karabo ~/karabo.bkp
to remove:
$ rm -fr ~/karabo
then execute:
$ bash PATHTO/download.sh
|
The system is up.
The users using virtual machines will encounter problems installing karabo 2.1.10 in the way that was described.
Further instructions will come later in the day |
228
|
12 May 2017, 13:19 |
Alessandro Silenzi | General | Information | New Deployment of Karabo for the SASE1 control machines. |
Alessandro Silenzi wrote: |
Alessandro Silenzi wrote: |
I will ramp down the system and bring it back up during the lunch break after installing the
tag 2.1.10.
To install a new version of Karabo use the script attached on your terminal
move your the karabo directory to a backup or remove it.
to backup:
$ mv ~/karabo ~/karabo.bkp
to remove:
$ rm -fr ~/karabo
then execute:
$ bash PATHTO/download.sh
|
The system is up.
The users using virtual machines will encounter problems installing karabo 2.1.10 in the way that was described.
Further instructions will come later in the day
|
for Users with a VM:
- use the download script
- Remove the karabo directory:
$ rm -fr ~/karabo
- then execute:
$ bash PATHTO/download.sh
Sorry for the delayed instructions
|
276
|
03 Jun 2017, 22:39 |
Alessandro Silenzi | General | Problem | SOLVED BROKER Problem |
A pile up in the BrokerQueue was detected by CAS monitoring system and
a response action from the On-Call personnel was triggered.
Regrettably, the following device servers have been shutdown and will be re-instantiated.
- Dataloggers
- alarm server
- camera servers
- Motion Loop and Vacuum Loop beckhoff servers
Sorry for the inconvenience |
310
|
03 Jul 2017, 20:53 |
Alessandro Silenzi | General | Information | Karabo for SASE1 topic restarted |
Here attached the main SASE1 panel |
Attachment 1: 07.png
|
|
478
|
21 Feb 2018, 13:49 |
Alessandro Silenzi | General | Information | Re: Status report after dispatch meeting 09.30 |
Small correction:
The coordinated motion is the KB-mirror's, not the Vacuum.
The postfix is 2.2.2.1 and includes features that were not included in 2.2.2
Karabo 2.2.2 is ready
Adriano Violante wrote: |
SPB
- KB chamber being pumped down
- Smaract commissioning ongoing
- Coordinate motion for VAC ready to be tested (probably tomorrow). It has to be agreed with Richard Bean
- Clean-up slits Karabo middle layer deployed and working. - The same hase to be done for the power slits.
FXE
- DAQ test ongoing - fixing of bugs
- After FXE has been moved into the new topic is not possible to read tunnel vacuum pressure anymore. Still the case.
- XGM in SASE3 fixed (A turbo broke - replaced)
- One exit slit Imager in XTD 10 commissioned
AE
- PBLM moto problem was found to be due to a wrong Karabo-PLC linking. ==> FIXED
- Soft mono commissioning started and AE support was required. DONE
ITDM
- Main problems with Train ID solved. Some problems still remain for some beckhoff loops in the tunnels==> AE on that.
- Some way to document the change of data format for devices has and will be found by IDTM
- Data source running for FXE. Changes have to be clearly communicated.
CAS
SASE3 - CY
- GATT works
- Inficon device to be improved (loop restart needed)
- CAS will deliver a method to deal with the configuration changes asked by the experiments, redirecting the changes to the proper platform (Firmware (AE), Karabo...)
|
|
518
|
25 Apr 2018, 18:10 |
Alessandro Silenzi | General | Information | Re: Status report after dispatch meeting 13:00 |
Regarding CAS Support for SASE2 Lasing:
CAS is happy to support in the frame of the On Call Duty system as it has been provided in the past.
Adriano Violante wrote: |
SPB
- Loops update: 1-4+8 this week. 5-7 Wed. next week. 11-13 end next week.
- Smaract motors for PAM are needed and Nerea is on it.
- It is not clear whether the AGIPD firmware has to be updated. To clarify with Jola when she is back. The info is important foe ITDM to plan the DAQ tests. Jola sick until 1st week of May. To be seen then.
- During the last users run it happened that a valve in XTD9 was closed but the beam did not trip. It is not clear why. Will be clarified with AE. Interlock definitions have to be checked next week when HSinn is back.
- During the switch on of the detector many Karabo devices had a problem even if no error messages were displayed. The problems disappeared restarting the devices. The errors could not be reproduced. Ot top of that it is possible to collect data only from 15 modules out of 16. The one missing changes every time the device is restarted. ASilenzi on it.
- Technofoft motor with magnetic switches do not work. In the tunnel the same configuration works, Will be investigated by AE/CAS/SPB
- Motors upstream move sometimes by themselves. Discussion ongoing between AE SPB and CAS. To be adressed offline.
XPD
- Access of XTD1 today @14:00 to fix some EPS switches
- SASE2 firsta lasing should be tried this week end + monday. CAS support requested. ASIlenzi checks with CAS whether this is possible.
AE
- SCS exp: first loop running. 2 creates missing but loop is up.
- MPS connection tunnels SASE2 done
ITDM
- Online storage update patch to be installed today. The system should remain online but in some cases one could have some downtime (1-2 hrs)
- MPS connection tunnels SASE2 done.
General
On Wednesday the meeting will be held at 13:00. Starting from next monday it will go back to 9.30
|
|
554
|
28 Aug 2018, 11:19 |
Alessandro Silenzi | XTD10 | Information | SASE3 loops will restarted at 11:30 |
This announcement is to notify you that the intervention planned to configure the interlocks as read-only will be carried out at 11:30.
A following message will notify of the end of the intervention
Alessandro |
555
|
28 Aug 2018, 11:36 |
Alessandro Silenzi | XTD10 | Information | Re: SASE3 loops will restarted at 11:30 |
Alessandro Silenzi wrote: |
This announcement is to notify you that the intervention planned to configure the interlocks as read-only will be carried out at 11:30.
A following message will notify of the end of the intervention
Alessandro
|
Intervention completed.
SA3_SYS_EPS2MPS/DCTRL/BEAM_GATT_OK has now read-only interlock properties |
82
|
17 Mar 2017, 15:21 |
Adriano Violante | General | Information | Loop status schedule for KW12 |
Dear all,
find here the foreseen loop status for KW12. The schedule could change. All changes will be notified by entries in the logbook.
Day |
Motion |
Vacuum |
EPS |
Other |
Monday |
Loop is up. |
Loop up. |
Loop up |
|
Tuesday |
Loop is up. |
Loop down. AE updates loop (maybe short ) |
Loop up |
|
Wednesday |
Loop down. AE updates loop |
Loop up |
Loop up |
|
Thursday |
Loop up |
Loop up |
Loop up |
|
Friday |
Loop up |
Loop up |
Loop up |
|
|
166
|
25 Apr 2017, 10:49 |
Adriano Violante | General | Information | Status and Plans after the 9:30 meeting |
XTDs Info:
Tunnel XTD2 will be accessible this Thursday, 27.04. between 9 and 12. Dosimeter and General radiation training required. Access requests should go to T.Haas.
XTD10 will be closed starting from this Thursday, 27.04. at 12:00
Provided that the authorities give the "go ahead", DESY plans to put beam in XTD2 on Thursday's evening.
Karabo:
- System running but performance of the GUI still sluggish
- There appears to be a resource leak. Second server will be set up tomorrow as workaround. Experts are working on it.
- In parallel experts are working on a definitive solution
- Deployment today on a new beckhoff device for the decodification of PLC error messages.
Vacuum:
- Systematic tests of ion pumps started again
PBLM/Motion Loop:
- There is a resource problem when trying to read out the cameras. This problem will be reconsidered once the general issue with the GUI server is solved.
- ASilenzi will ask Natalia for acceptance test definition for PBLM
- Motion loop will be down until 10:30 for update. An entry will be written when the loop is again up.
SPB Tunnel components
- The Renishaw encoders can be read and positions are reliable. An error message is coming from the encoder and is probably due to a wrong voltage level delivered to the encoder. The encoders can be operated in this condition.
- T. Freyermuth is in contact with the encoder company tu understand the problem and work on a fix
- The same problem also affects FXE components
- The cameras operated at 1Hz deliver delayed images. 1/3 Hz operation (almost live mode) is OK - probably related to GUI memory issues
FXE
- Encoders of Loop1 have the same error message as SPB - the encoder positions are reliable - local components test can go on (e.g. OGT1)
- Encoders of loop2 are not powered - AE to investigate
Tasks for today:
- Identify a fix/workaround for the GUI server resource problem
- Deployment of a beckhoff device for the decodification of the error messages.
- Find a solution for the Renishaw encoder problem SPB Tunnel/ FXE Loop1
- Investigation of the FXE Loop2 encoders power
- Continue testing of ion pumps in XTD9
- Test of gas section interlock in XTD9
Tasks for tomorrow:
- Setup of the second server for karabo GUI
|
174
|
26 Apr 2017, 11:55 |
Adriano Violante | General | Information | Status and Plans after the 9:30 meeting |
XTDs Info:
Tunnel XTD2 will be accessible this Thursday (TUNNEL OPEN, NO ZZ), 27.04. between 9 and 12. Dosimeter and General radiation training required. Access requests should go to T.Haas.
XTD10 will be closed starting from this Thursday, 27.04. at 12:00
Provided that the authorities give the "go ahead", DESY plans to put beam in XTD2 on Thursday evening.
Access to XSDU2 being clarified - separate entry will be posted.
Karabo:
- System running but performance of the GUI still sluggish - CAS was not able to reproduce the problem, still under investigation
- Second server has been set up as workaround.
- In parallel experts are working on a definitive solution
- Deployment today on a new beckhoff device for the decodification of PLC and interlock error messages.
Vacuum:
- Systematic tests of ion pumps ongoing. in XTD 9 two controllers/beckhoff terminal for pumps were wrongly connected (exchanged). To reconnect the controllers in the right orders the loop has to be interrupted. This will be done after the vacuum test on the XGM is done.
PBLM/Motion Loop:
- There is a resource problem when trying to read out the cameras. This problem will be reconsidered once the general issue with the GUI server is solved.
- ASilenzi will discuss offilen with Natalia the acceptance test definition for PBLM
- List of errors and relative solution concerning ELMO absolute encoder implementation being worked out by AE/CAS
SPB Tunnel components
- Error message fore the Renishaw encoders is coming from wrond specifics of the interpolator between encoder and input terminal. This is due to wrong datasheet provided by the company. This is not a problem for reading of the encoders and their reliability. Error signal is currently ingnored
- The same problem also affects FXE components
- The cameras operated at 1Hz deliver delayed images. 1/3 Hz operation (almost live mode) is OK - probably related to GUI memory issues
FXE
- Encoders of Loop1 have the same error message as SPB - the encoder positions are reliable - local components test can go on (e.g. OGT1)
- Encoders of loop2 are not powered - AE to investigate today
Tasks for today:
- XGM vacuum test and solution implementation of pump restart in Karabo
- GUI server resource problem ongoing
- Deployment of a beckhoff device for the decodification of the error messages.
- Find a solution for the Renishaw encoder problem SPB Tunnel/ FXE Loop1
- Investigation of the FXE Loop2 encoders power
- Continue testing of ion pumps in XTD9
- Vacuum signal alarms to be checked by AE,Harlad, Janni
- Implement and test the CRLs in XTD2 in the Beckhof loop for test.
Tasks for tomorrow:
- Vacuum signal alarms to be checked by AE,Harlad, Janni
- Implement and test the CRLs in XTD2 in the Beckhof loop for test.
- Checking of the absober for first lasing (inc. filter chamber).
|
|
175
|
26 Apr 2017, 12:58 |
Adriano Violante | General | Information | XSDU2 access |
The XSDU2 area will be open (as XTD2) tomorrow between 9 ans 12. To register the access, please send also in this case a mail to T.Haas. |
186
|
28 Apr 2017, 08:25 |
Adriano Violante | XHEXP | Information | Fertigmeldung phase II cables SPB Optics Hutch D.02 and SPB laser hutch D.13 |
ACTEMIUM has delivered the handover document for the phase II cables installed in D,02 and D.13. The beckhoff crates can be connected to the cables in these areas of SASE1.
|
196
|
02 May 2017, 15:30 |
Adriano Violante | General | Information | Access to XTDs on Thursday |
This Thursday the XTDs will be accessible with ZZ procedure. Access can be requested via T. Haas. |
211
|
08 May 2017, 15:18 |
Adriano Violante | General | Information | Status after the 9.30 Meeting |
Vacuum (M. Dommach):
- Systematic tests of ion pumps in XTD9 almost finished - ongoing
- Interface with MPS has to be tested
- Problem with the fast valve in XTD2 and 9 - it is possible to close it remotely but not possible to open it again. Checking of the cabling is ongoing by Vacuum group
- After restart of the vacuum loop many pumps in XTD 9 and 2 show an unknown error and some of them are not readble - CAS working on that.
PLC (P. Gessler, T. Freyermuth):
- Implementation of shutters in Karabo ongoing -XS3 shutter in the VAC loop now. XTD9 to do.
Karabo (A. Silenzi):
- GUI stability improved with a temporary solution. This should be enough to guarantee the proper functioning of images acquisition.
- Update of devices list ongoing
- Library for motors (base device), elmo and technosoft, being worked out.
Plans for today:
- XGM work on gas injection
- Bring back Karabo and clear XGM error codes
- Perform systematic test of DPS in XTD9
Other topics:
- No 09:30 meeting tomorrow - next meeting will be on Wednesday
|
342
|
24 Jul 2017, 10:38 |
Adriano Violante | General | Information | Status after 9.30 Meeting |
General
- The latency observed by SPB in the GUI client has been almost completely fixed. Still some "freezing" from time to time remains.
- DAQ tests in FXE with LPD worked for 12/16 of the detector. Trigger's signal stability issue being addressed by AE.
- XTD 9 and 10 will remain open from 25.07. at 7:00 to 26.07. at 14:00
- On Wednesday afternoon the machine will be prepare to lase with 30 bunches in order to allow the radiation measurements in SASE1 Exp. Hall on Thursday and Friday.
XTDs
- Fast valve in XTD9 still has issues with noise. Issue will be addressed tomorrow with AE support.
SPB
- Integration of the turbo pumps in the VAC loop ongoing.
- Chiller control being included in Loop 5
- Firmware for the AGIPD hv power supply was updated. The spikes during ramping are gone
- SMARACT motors being implemented. (depend on Loop 13)
- Work on in vacuum interlock in SPB will probably start this week.
- Some problems with Karabo (While measuring profiles the level scaling does not work, Region of interest values wrong) have been reported to CAS.
|
344
|
26 Jul 2017, 10:35 |
Adriano Violante | XHEXP | Information | Status after 9.30 Meeting |
General
- Today the machine is being prepared to lase with 30 bunches in order to allow the radiation measurements in SASE1 Exp. Hall on Thursday and Friday.
- Today GUI will be down for a couple of minutes at 11.30 to allow modifications of the servers for bugs fixing.
- Specific SASE1 areas will be off limits during the test, scheduled for SPB OPT 27.07.17 12:00-16:00 , SPB EXP 28.07.17 9:00-15:00 and FXE 03.08.17 9:00-15:00. Please address Eric Boyd's presentation for details. A mail reminder will be also sent to notify the beginning and ending of the tests.
- The machine will be running with 30 bunches during the test and with 1 bunch during the night. Since no EPS is implemented, screens and sensitive components need to be taken out during the 30 bunches operation.
- New version of Karabo ready to be deployed. The time slot when this will happen will be discussed on Friday,
- Screens controlled by Karabo cannot be read from DOOCS. The Karabo/DOOCS interface problems will be be addressed with high priority by CAS.
XTDs
- Fast valve in XTD9 still has issues with noise. Issue will be addressed tomorrow with AE support.
FXE
- The detector group is updating the firmware for the LPD to fix the trigger signal problems. A test on just 1 quadrant will be done today together with ITDM
- Interlock implementation in Loop 1 ongoing.
SPB
- Integration of the turbo pumps in the VAC loop ongoing. Interlock possible.
- Chiller control being included in Loop 5 - Crate has been modified this morning. Loop will be updated checking that this will not stop the turbo pumps.
- SMARACT motors being implemented. First motor is ready to be tested today after hardware problems have been fixed.
- Work on in vacuum interlock in SPB ongoing.
- The ELMO controllers for the motors of the liquid jet manipulator in Loop 13 should be brought and ready by CW 32. AE working on that.
|
351
|
31 Jul 2017, 11:58 |
Adriano Violante | General | Information | Status after 9.30 dispatch Meeting |
General
FXE
- Gotthard detectors to be tested in Karabo
SPB
-
Problem with Smaract motors has been identified. Loop to be updated.
-
Cameras trigger for the sample environment is now working. Software issues. CAS is addressing that.
-
Vacuum interlock for Loop 5 (AGIPD) is being implemented. There will be a meeting soon (today?) with AE to check the interlock definitions for AGIPD and continue work on this loop.
-
Focus characterization with CRLs ongoing. Beam size reached: <10 um
-
Tunnels
-
Fast valve fake triggering has not been reported in the last week end.
-
In case of fake triggering of the fast valves, there is now a procedure to open them again remotely. Please check the related entry posted by M. Dommach.
-
Some problems with the cameras that stopped working have been reported by A. Koch. That could be just a matter of restarting the GUI. To be checked.
AE
-
FXE Interlock definitions have been changed and this reflects in the update of loop 1 and 2. Ongoing.
-
Working on Alio Stages integration for Mono in the tunnel. To start this week.
-
SPB Loop 12 – Smaract motors and ELMO controllers implementation ongoing
-
SPB Loop 5 is up including the AGIPD related systems. AGIPD interlock will be added once low level tests done
-
SPB Loop 13 - Phase 2 cables for some modules are at different positions compared to eplans. SPB wants to leave it and rather swap module positions and hand in a change request.
-
Cables for interface to Person Interlock laid. Connections to the MPS system to be done this week.
-
DET
-
LPD – Time server was set up. Images collected from 1 quadrant. Firmware upgrade for the other quadrants ongoing.
-
AGIPD – Detector being tested in Hera south. KWrona will start the tests of DAQ in Hera today or tomorrow.
CAS
-
2.1.13 Karabo version update is being agreed with the interested parties. It takes approx. 1-3 hrs.
|
400
|
09 Oct 2017, 14:00 |
Adriano Violante | General | Information | Status report after dispatch meeting 13:30 |
Tunnels (J. Eidam, J. Gruenert)
- SASE3:
- 1st section is not recovered yet, ongoing.
- Diff. pumping XGM is being installed
- Leak tests ongoing
- MCP manipulator XTD2: company got the training - repair ongoing
- Absorber was moved ==> has to be realigned by MEA
- A. Koch is commissioning the imagers. Some bugs were found and will be solved with the new release of Karabo.
- MCP, FEL-Imager: Crates are there, AE still has to understand and define the priorities of their work
- No access to the tunnels with visitor cards! (Access to tunnels requires rebreather training, knowledge about procedures, warnings, dosimetry etc.)
- Exchange of gotthard detector in XTD 9 ongoing.
- SASE1:
- XGM Inihbit system will be brought up tomorrow. VAC loop needs to be brought down . Will be notified with a message in the logbook.
Electronics (P. Gessler)
- Responsibles
- SASE1: Bernard Baranasic
- SASE3: Jan Tolkiehn
- Instruments SASE1: Tobias Freyermuth
- Fast valve terminals exchanged today.
- Documentation by WP74 + Vacuum is not consistent ==> AE will provide an Excel-sheet to be used, which should give a consistent picture of all terminals, connections etc. Ongoing
ITDM (K. Wrona)
- Both online & offline-filesystems have to be updated. Postponed to TOMORROW (16.10.): Online-FS will be down, offline-FS will be worked on continuously, should not be down, but at reduced performance, since update will be server by server.
- DAQ-Upgrade: still running Karabo 2.1.12 on detectors, which requires lots of restarts. UPGRADE: TOMORROW 13==>16 to Karabo v.2.1.16
Software (H. Santos, A. SIlenzi):
- Karabo 2.1.18 being tested. Test to continue for a couple of days before deployment.
- S. Brockhauser will report on the status of the scan tool this Friday.
|