  OPERATION-2023 logbook, Contact: F.Wolff-Fabris, A.Galler, L.Samoylova, H.Sinn, Page 8 of 24  Not logged in ELOG logo
Entry   Shift summary, posted by Richard Bean on 19 Feb 2023, 23:28 
X-ray delivery


9.3 keV, 120 pulses
Good Beam Stability -~1mJ


Achievements/Observations


Double Slit and V-Pattern Interference Measurements
Nearfield Ptycho-Scans
Nano-KB (@Richard)


Issues
Entry   Shift summary, posted by Richard Bean on 26 Apr 2023, 01:03 
SPB/SFX User shift 1 3333

X-ray delivery



9.3 keV, 1.7 mJ, 202 pulses @ 564 kHz
Entry   Shift summary, posted by Richard Bean on 27 Apr 2023, 23:33 
SPB/SFX PCS user proposals (day 1)

X-ray delivery


9.3 keV, 1600 uJ/ pulse


Achievements/Observations
Entry   Shift summary, posted by Richard Bean on 28 Apr 2023, 21:55 
SPB/SFX In-house research 4978 

X-ray delivery


9.3 keV 202 pulses / train, relatively stable intensity 1.9 mJ / pulse, some decrease in intensity across train


Optical
Entry   Shift summary, posted by Richard Bean on 29 Apr 2023, 22:00 
SPB/SFX In-house research 4978 shift 2

X-ray delivery


9.3 keV 202 pulses / train, relatively stable intensity 2.0 mJ / pulse at start of train, ~30% decrease in intensity across train
BKR
Entry   All SASE's - SEPS Interlock Test - Results, Status & Upcoming Schedule, posted by Raśl Villanueva-Guerrero on 25 Jan 2023, 08:40 
Dear all,

please find here a summary of the status on this critical topic provided yesterday evening (around 19:15) by Zunaira Ansari (extract from her
e-mail).
Entry   ZZ Access on 24th January (19:30h) - Replacement of Motor on SASE2 Undulator - Cell 17 Phase Shifter, posted by Raśl Villanueva-Guerrero on 25 Jan 2023, 08:44 
Dear all,

last evening Suren Karabekyan and myself did a short notice ZZ access to XTD1. The reason is that machine operators detected the lack of response
on the Cell 17 Phase Shifter. The intervention was successful and around 20:30 we left the tunnel.
Entry   Vacuum Leak in SA2-XTD1 Solid Attenuator - [SOLVED] - Preliminary report, posted by Raśl Villanueva-Guerrero on 09 Jun 2023, 15:41 
Dear all,

After the incidences reported yesterday and the diagnostic remotely done (where we could narrow down the root cause to the edge-welded below
at the Linear stage of the arm Nr. 6 - 2.4 mm CVD diamond], we confirmed this as a fact during the schedule access today. Here is a succint summary of
Entry   Vacuum Leak in SA2-XTD1 Solid Attenuator - [SOLVED] - Closing report , posted by Raśl Villanueva-Guerrero on 13 Jun 2023, 11:23 
Dear all,

the closing report on this issue can be found in the following Alfresco link:

https://docs.xfel.eu/share/s/GzxORQOGToe_tiug7LIHhQ 
Entry   Issue, posted by Raśl Villanueva-Guerrero on 10 Aug 2023, 22:43 image_2023-08-10_225040511.png
Here is a capture of the observed issue with the SPB shutter the past night.

 

Observe the two opening/closing incidents: the first kept the shutter "OPEN" signal during 4 minutes aprox., and the second did
Entry   Shift summary, posted by Raphael de Wijn on 30 Apr 2023, 21:59 
SPB/SFX In-house research 4978 shift 3 - end

X-ray delivery


9.3 keV 352 pulses / train, relatively stable intensity ~1.9 mJ / pulse
beam down ~30 min


Optical
Entry   Shift summary, posted by Raphael de Wijn on 22 Sep 2023, 07:27 
X-ray delivery


7 keV, 202 pulses, 564 kHz, ~1.3 mJ, stable delivery


Optical laser delivery


None


Achievements/Observations
Entry   Shift summary, posted by Raphael de Wijn on 24 Sep 2023, 07:28 
X-ray delivery


7 keV 202 pulses 1.6mJ stabel across train and throughout the shift
Beam down at 7am again, power glitch same as yesterday


Achievements/Observations


faster changover and alignment
YAG on nozzle worked
collected data the droplets in oil sample delivery method -
Entry   Shift summary, posted by Raphael de Wijn on 17 Oct 2023, 23:23 
X-ray delivery


13.6 keV, ~1.6 mJ and up to 202 pulses at 0.5 MHz


Optical laser delivery


PP laser, stable delivery


Achievements/Observations
Entry   Shift summary, posted by Raphael de Wijn on 18 Oct 2023, 23:19 
X-ray delivery


13.6 keV, ~1.8 mJ and up to 352 pulses at 1.1 MHz


Optical laser delivery


PP laser, amphos laser computer in error for ~2h


Achievements/Observations
Entry   Shift summary, posted by Raphael de Wijn on 22 Oct 2023, 00:27 
X-ray delivery


13.6 keV, ~1.6 mJ and up to 352 pulses at 1.1 MHz.
Beam down until around 1PM.
After agreement with FXE, we could
collect data until midnight.


Optical laser delivery
Entry   Shift summary, posted by Raphael de Wijn on 23 Oct 2023, 05:15 
X-ray delivery


13.6 keV, ~1.6 mJ and up to 352 pulses at 1.1 MHz.
Beam down from 10:30 to 19:00.


Optical laser
delivery
Entry   Shift summary, posted by Raphael de Wijn on 30 Oct 2023, 07:10 
X-ray delivery


7.8keV, ~2.5mj, no beam before 1:15am
One undulator was not moving, expert was called


Optical laser
delivery
Entry   Shift summary, posted by Raphael de Wijn on 22 Nov 2023, 23:18 
X-ray delivery


16.9 keV, up to 30 pulses and 1.1 MHz for alignment, 1 pulse for data collection
700-800 uJ
stable delivery


Optical
laser delivery
Entry   Shift summary, posted by Peter Zalden on 02 Feb 2023, 09:25 
FXE bring-up, summary of shifts 31.1. and 1.2.:

Beam delivery (11.5 GeV)


9.3 keV, 1.5 mJ (31.1.)
7.1 keV, 1.7 mJ (1.2.)
Horizontal beam jitter 200 µm (RMS), a bit more than usual


Tunnel