Entry   late shift summary, posted by Andreas, Sergii on 04 Aug 2023, 23:20 
achievements:


hooked up sample cooling and reached 20K at sample at typical low consumption rate
we archieved targeted resolving power of
~10,000 or 86meV @ 857eV at low temp 20K after indications that heating broadens the elastic line of CoO
we observe sample damage at 30% and
Entry   night shift summary and end of beamtime, posted by Andreas, Martin on 24 Apr 2023, 15:16 
achievements:

- finished SAXS data recording till 8am on time-resolved skyrmion nucleation and field dependence

- the setup is sensitive to beam transport drifts due to the closed hor-SLIT and the pinhole in FFT. were able to recover beam intensity by simple
Entry   night shift summary and end of beamtime, posted by Andreas, Martin on 24 Apr 2023, 15:16 
achievements:

- finished SAXS data recording till 8am on time-resolved skyrmion nucleation and field dependence

- the setup is sensitive to beam transport drifts due to the closed hor-SLIT and the pinhole in FFT. were able to recover beam intensity by simple
Entry   night shift summary, posted by Andreas Scherz / Eugenio Paris on 26 Oct 2023, 07:13 
Night shift summary

Achievements:
- Recovered time0 on SiN (time0 moved >20ps after FEL beam loss in the evening)
Entry   Shift summary, posted by Andreas Scherz on 07 Sep 2023, 23:46 
Shift summary 07.09.2023

Achievements:
1. found t0   on LSCO x=0.15 at pre-peak O K edge
Entry   SA3 status, posted by Andreas Koch on 08 Feb 2023, 11:14 Bunch_number_control_SA3_FEL_imager.PNG
Bunch number control - SA3 FEL imager

As announced today in the XO meeting the SA3 FEL imager has a new feature, see screenshot, encircled:
- In case of danger for the YAG screen the bunches SA3 are set to "0" via the BunchPatternServer (SA3 Main scene).
Entry   Issue, posted by Andreas Koch on 13 Apr 2023, 15:29 
Trigger issue with SXP_XTD10_IMGES - Exit Slit imager

The external trigger of the Navitar camera was not set, fixed now.
The single pulse trigger of the imager: MCP + camera is tested and correctly working.
Entry   New screens installed in FEL imager SA3, posted by Andreas Koch on 21 Jun 2023, 15:12 
YAG screen
The damaged screen "YAG2" with Al coating had marks and had been exchanged.
The Imager Watchdog now protects the screen - operational for some months i.e. the number of bunches is shut down to zero if the intensity at the
Entry   Status, posted by Andreas Galler on 11 Feb 2023, 13:55 
Gun Modulator Problems

Gun Trip at 11:23 and since then the Modulator trips after each restart.
Accelerator Shift Crews and On Call personnel working on fixing the issue.
Entry   Issue, posted by Andreas Galler on 08 Apr 2023, 10:29 
Changed EPS Interlock condition for SPB_XTD9_IMGPI/SWITCH/SCREEN_OUT

SPB/SFX called DOC this morning for being limitied to two pulses by the EPS (Instrument should have called PRC instead)
After tracing the issue to the SPB_XTD9_IMGPI/SWITCH/SCREEN_OUT switch SPB/SFX decided to take this imager out of the interlock, confirming
Entry   Shift summary, posted by Alexey Zozulya on 24 Feb 2023, 22:57 
- Measured the speckle patterns using EPIX detector to estimate the beamsize focused down by 1D lens (Row 13).

- Heat load test to NFL #18 with 50 bunches.

- Measured the speckle patterns with 2D focusing lens to estimate the beamsize. wire edge scan?
Entry   Shift summary, posted by Alexey Zozulya on 18 Oct 2023, 02:09 
Shift summary (p4239)
Achievements:
- HXSS beam at 10.5 keV at 400 uJ pulse energy
Entry   Shift summary, posted by Alexey Zozulya on 23 Oct 2023, 01:10 
Milestones:
*Finish measurement program on the STO sample at room temperature
*Check mono fpitch and energy rocking curve
Entry   Shift summary, posted by Alexander Pelka on 01 Mar 2023, 16:07 
Day shift 28.02

Got the beam, aligned it up to the TCC, mirrors in 3 mrad configuration, checked positions for the CRLs. Optimised
beam at the HAPG. Beam stability was fine, energy up to 1,5 mJ at 8.2 keV, and up to 1 mJ at 9.1 keV (used for the spectrometer calibration). 
Entry   HED Shift Summary 07.04., posted by Alejandro Laso Garcia on 07 Apr 2023, 23:00 
Morning - Users from proposal 3455 continued with their measurement program. Beam stable during the measurements.

Afternoon - Changed the setup from 3455 to 3326.

Evening - Beginning of the alignment for users. Beam stable.
Entry   HED Full day shift summary 25.04., posted by Alejandro Laso Garcia on 26 Apr 2023, 07:55 
Morning shift:

- First thing in the morning ~7 am, the MDL in the SASE 2 topic were down. Even the watchdog which prevented us from moving SA2 attenuators.
DOC quickly resolved the issue (10 min).
Entry   HED Full Day Summary 26.04., posted by Alejandro Laso Garcia on 27 Apr 2023, 07:51 
Morning shift:

- Tried to align the fiducial fiber in IC1 for the streak cameras, however it was unsuccessful.

- The karabo device for the SOP had to be restarted. Crosschecked that all the timings were still correct.
Entry   Shift summary, posted by Adam Round on 24 Feb 2023, 05:39 
Staff: AR, KK

X-ray delivery


9.3keV


Optical laser delivery
Entry   Shift end, posted by Adam Round on 22 Mar 2023, 21:49 
X-ray delivery


9 keV 1 to 165 pulses ~ 300 mj per pulse - stable delivery during the day


Optical laser delivery


ns lasers for illumination only


Achievements/Observations
Entry   Shift summary, posted by Adam Round on 09 Jun 2023, 07:05 
Staff: DZ, AR, MK

X-ray delivery


12.42 keV 169 pulses for alignment 16 pulses for data collection. stable delivery excluding the extended interuption