Group Selection Page HELP Controls Group Data Analysis Group ITDM WP76 DET Vacuum EEE WP78 FXE SPB MID HED SQS SXP Sample Environment Operation PSPO XO TS Migrated2Zulip
OPERATION-2025 OPERATION-2024 OPERATION-2023 OPERATION-2022 OPERATION-2021 OPERATION-2020 OPERATION-2019 SASE1-2018 SASE1-2017 Experiment data
  OPERATION-2023 logbook, Contact: F.Wolff-Fabris, A.Galler, L.Samoylova, H.Sinn, Page 7 of 24  Not logged in ELOG logo
Entry   Shift summary, posted by Romain Letrun on 04 Jun 2023, 21:17 
X-ray delivery


12.2-12.45 keV, up to 339 pulses at 1.13 MHz, 0.8-1.2 mJ.
Couple of minutes beam interruption.


Optical
laser delivery
Entry   Shift summary, posted by Romain Letrun on 05 Aug 2023, 08:20 
X-ray delivery


9.3 keV, 1-202 pulses at 1.13 MHz, 1.9-2.1 mJ.
Overall stable delivery.
L-IBFB could not be activated due to missing
missing transfer matrix elements. Missing parameters entered by the expert who happened to be on shift this morning.


Optical
Entry   Shift summary, posted by Romain Letrun on 10 Aug 2023, 07:22 
X-ray delivery


9.3 keV, up to 181 pulses at 564 kHz, ~1.8 mJ. Overall stable delivery.


Optical laser delivery


800 nm, 50 fs, 564 kHz, up to 185 pulses. Overall stable delivery.


Achievements/Observations
Entry   Shift summary, posted by Romain Letrun on 11 Aug 2023, 07:16 
Shift summary for 10.8.2023

X-ray delivery


9.3 keV, up to 181 pulses at 564 kHz, 1.8 - 1.9 mJ


Optical laser delivery
Entry   Shift summary, posted by Romain Letrun on 12 Aug 2023, 07:12 
Shift summary for 11.8.2023

 

X-ray delivery
Entry   Issue, posted by Romain Letrun on 12 Aug 2023, 07:19 Screenshot_from_2023-08-12_07-10-24.pngScreenshot_from_2023-08-12_07-10-32.png
Potentially damaged 1.2 mm CVD in XTD2 attenuator. This feature was not present earlier in the week.
Entry   Shift summary, posted by Romain Letrun on 27 Sep 2023, 07:24 
Shift summary for 26.9.2023

X-ray delivery


6.3 keV, ~4 mJ, 1-352 pulses at 1.13 MHz
Great performance and stable delivery with few minor interruptions


Optical
Entry   Shift summary, posted by Romain Letrun on 28 Sep 2023, 07:20 
Shift summary for 27.9.2023

X-ray delivery


6.3 keV, 3-4 mJ/pulse, 1-352 pulses at 1.13 MHz


Optical laser delivery
Entry   Shift summary, posted by Romain Letrun on 29 Sep 2023, 08:30 
Shift sumary for 29.9.2023

 

X-ray delivery
Entry   Issue, posted by Romain Letrun on 30 Sep 2023, 10:11 Screenshot_from_2023-09-30_10-00-26.png
On multiple occasions this morning, the number of bunches was reduced to 1 without actions from our side.

Looking at the history of SA1_XTD2_BUNCHPATTERN/MDL/CONFIGURATOR, we noticed changes were applied by this device, presumably originating from
one of the watchdogs in SA1. This kind of silent changes is particularly inconvenient and could be easy to miss if one is not constantly monitoring that
Entry   Shift summary, posted by Romain Letrun on 20 Oct 2023, 23:10 
X-ray delivery


13.6 keV, ~1.6 mJ and up to 352 pulses at 1.1 MHz.
Beam down at 22:47, not recovered before the end of the shift. Otherwise
stable delivery.


Optical laser delivery
Entry   Late shift summary 17.03.2023, posted by Robert, Zhong, Manuel on 17 Mar 2023, 23:43 
Activities:


continued tr-RIXS scans
tried to find ways to mitigate the energy drifts of the mono (see below)
confirmed in user
data that the FEL-PPL timing was not changing (see below)
setting up for tr-RIXS at beginning of night shift


Problems:
Entry   Shift summary, late 2023.03.15, posted by Robert, Manuel on 16 Mar 2023, 00:26 
Activities:


Found coarse and fine timing between FEL and PPL at 266nm
Set up for tr-RIXS during the night


Problems:


2 fastADC channels appear to be dead.
Optical locking of the PPL syncronisation system took a very long time (> 30 minutes)
Entry   Late shift summary 19.03.23, posted by Robert Carley on 20 Mar 2023, 01:24 
Activities:


Measured tr-RIXS spectra on user sample in silane solvent


Problems:


Sometimes the PPL shutter cannot be opened from the control room after searching the hutch.
Entry   Late shift summary20.04.2023, posted by Robert Carley on 21 Apr 2023, 04:05 
Activities:


correctly positioned magnet
moved detector upstream and found small beamstop
Recorded SAXS
Started tr-SAXS


Problems:


The SAXS images from laser-excited samples showed unexpected variation between different size rings, central point (ie not a ring) and
Entry   Night shift summary 20-21.04.2023, posted by Robert Carley on 21 Apr 2023, 04:13 
Activities:


Investigated SAXS scattering instability and found it to come from the pointing variation of the PPL
Recorded microscope images
of the PPL spot of the pBN to quantify the pointing for different spot sizes
Enlarged the beam and measured pumped SAXS. Results seem better
Entry   Night shift summary , posted by Robert Carley on 11 Jun 2023, 07:40 
achievements


optimized EOS signal from FEL-induced THz emission from STE on Sa of PAM
reduced chirp to increase timing sensitivity to 9fs
/ pixel of PAM
STE-based PAM measurements at fixed delay and delay scans. 
after FEL down at 6am, continue with PAM measurements
Entry   Early shift summary, posted by Robert Carley on 11 Jun 2023, 17:34 
Achievements


Observed first EOS of THz emitted from FEL-pumped STE on SiC and Si membranes
Explored fluence dependence and damage limits
Explored
sample heating with pulse repetition rate
Measure timing jitter of FEL with and without longitudinal feedbacks engaged


Problems
Entry   Late shift summary, 26.10.2023, posted by Robert Carley on 26 Oct 2023, 23:25 

Achievements:


Continued with tr-RIXS


No problems
Entry   Shift summary, posted by Richard Bean on 19 Feb 2023, 00:34 
X-ray delivery


 9.3 keV, 1-120 pulses,
good stabiltiy, lowish flux ~900uJ, but experimental requirements were met


Achievements/Observations


Finished doule slit measurements at micron beam
Alignment to direct beam
Sample position for the sand paper found
Some
ELOG V3.1.4-7c3fd00