Shift end, posted by Adam Round on 18 Jun 2023, 07:31
|
posting for 17th June
Staff: AR, AS, FK, HH, JB, KK, DZ, MK
X-ray delivery |
Shift end, posted by Adam Round on 29 Jul 2023, 23:46
|
X-ray delivery
12.4 keV, up tp 352 pulses but the intensity drop across the train was too dramatic to use. reasonably stable delivery with 202 pulses.
Optical
laser delivery |
Shift end, posted by Adam Round on 23 Sep 2023, 07:04
|
Staff:JK, RDW, AR
X-ray delivery
7 keV 202 pulses 1.7mJ stabel across train and throughout the shift
Optical laser delivery |
Shift end, posted by Adam Round on 21 Nov 2023, 23:29
|
Staff: AR, MS, DM, RL, RdW
X-ray delivery
16.9 keV, up to 30 pulses and 1.1 MHz for alignment, 1 pulse for data collection
stable delivery
Optical |
Shift end, posted by Adam Round on 23 Nov 2023, 23:12
|
Staff: AR, MS, DM, KK, RL, RdW
X-ray delivery
16.9 keV, up to 30 pulses and 1.1 MHz for alignment, 1 pulse for data collection
900 uJ
Beam down around 1h
Optical |
Shift summary, posted by Adam Round on 26 Nov 2023, 23:26
|
X-ray delivery
16.9 keV, up to 30 pulses and 1.1 MHz for alignment, 1 pulse for data collection
800 uJ
Beam pointing and corrected
with M2 Ry piezo stepping optimizing scatering intensity seen on JF4M
Optical laser delivery |
Taking the beam , posted by Abhisakh Sarma on 13 Jun 2023, 06:49
|
BKR changed the beam energy from 15 keV to 12.4 keV
Energy 12.4 keV
Repeatation rate 1.1 MHz |
Status, posted by Abhisakh Sarma on 16 Jun 2023, 11:42
|
Beam is back at around 11:30 pm
We lost 1 hr 30 min of beam time.(it was promised to get back at around 10:00 am)
If we want to change the pulse number then we need to call BKR. |
Shift summary, posted by Abhisakh Sarma on 11 Oct 2023, 06:22
|
X-ray delivery
7.8 keV, up to 30 pulses at 94 kHz, 3 mJ
Optical laser delivery
No laser
Achievements/Observations |
|