Entry   Notes XO Integration Meeting 04.10.2023, posted by Frederik Wolff-Fabris on 04 Oct 2023, 09:52 
General Announcement:
- A. Galler reminds this is a facility development week and for the next UOM on Friday a report of stability/jitter shall be done by the instruments.
- Martin Doering announces the Winter maintenance period 23/24: 
1. The new maintenance task list was sent to the groups last week; 
2. Deadline to submitting back the filled list is Oct.20th; release takes place on Nov. 16th and maintenance period starts on Nov.30th. 
3. Locations can be chosen with dropdown menu in a 3-step process; 
4. Services needed and blocked are condensed in two dropdown fields; 
5. Submit task list to xo-maintenance@xfel.eu; for questions please address xo-planning@xfel.eu. 

CTRL:
- Nothing to report.

DA:
- Nothing to report.

EEE:
- PLC team working in SQS Elmo motor drive.

VAC:
- Nothing to report.

XPD:
- Nothing to report.

DET:
- Nothing to be reported.

ITDM: 
- Nothing to report.

XRO:
- Nothing major to report.

LAS:
- Nothing to report; PP-lasers survived the power glitches.

UNSYS:
- Nothing to report.

SPB:
- Nothing to report.

FXE:
- Nothing to report.

MID:
- Question to EEE on the timing crate: it seems to be fine now.

HED:
- Nothing to report.

SCS:
- Nothing to report.

SQS:
- Issue with 1-bunch digitizer (uTCA in rack room): SQS will contact EEE.

SXP:
- Not present.
Entry   Notes XO Integration Meeting 02.10.2023, posted by Frederik Wolff-Fabris on 02 Oct 2023, 09:59 
General Announcement:
-	 

CTRL:
- Deploy dataloggers fix today; it takes around 5 minutes.

DA:
- Couple of OCD calls over the week that could be all addressed.

EEE:
- PLC team checking motors in SQS to test issue.
- uTCA team: 1. replace a CPU at MID (possible); 2. digitizers at HED will be replaced by uTCA team to improves setup;
- Also install power supply at SQS.

VAC:
- Nothing to report.

XPD:
- Nothing to report.

DET:
- Last week started bumpy but operation stabilized later on.

ITDM: 
- Nothing to report.

XRO:
- XTD1 attenuator: one arm is blocked; after speaking with SA1 instruments the decision is to wait to fix during the winter maintenance. In case of urgencies to use it please contact Maurizio V.

LAS:
- Issue with FXE laser: will need CTRL to help debug;
- AMPHOS issues at PP-lasers are solved.

UNSYS:
- Nothing to report; all fine.

SPB:
- Test with machine tomorrow / taking beam.

FXE:
- Nothing to report.

MID:
- Nothing to report.

HED:
- Nothing to report.

SCS:
- Not present.

SQS:
- Nothing to report.

SXP:
- Nothing to report.
Entry   Notes XO Integration Meeting 27.09.2023, posted by Frederik Wolff-Fabris on 27 Sep 2023, 10:30 
General Announcement:
- The Winter Maintenance Task list will be sent to all groups in the course of today. Next Wednesday 04.10 Martin Doering will make a quick presentation on the list itself and take questions. 
Two minor upgrades are done on it: 1. Location places are not divided in up to 3 sub-sections/levels; 2. Services needed and blocked are now condensed in two columns with color code related to the chosen 
service.  
The deadline for submission is October 20th.

CTRL:
- Nothing to report.

DA:
- No relevant updates.

EEE:
- Continued with work recovering systems after power cut.
- Patrick G. points that a clear information on the infrastructure of e.g. power, water, has to be made available to groups. 

VAC:
- Not present.

XPD:
- Nothing to report.
- As last PRC, J. Gruenert adds that to protect CRLs in SA1 a watchdog is being tested. F. Wolff-Fabris adds that XO will discuss it with instruments.

DET:
- Nothing to report.

ITDM: 
- Nothing to report.

XRO:
- Mikako M. says that the test of the SA1 CRL watchdog was done yesterday night; some bugs were found and a fix needed to be done. Watchdog is in principle ready but should be still tested. However, it is 
not yet a fail proof device.
- Steffen H. points that safety relevant devices that are not fail proof shall not be deployed. In addition, for longer use: one may be worthwhile to implement a dedicated device.
- XO states that the tested watchdog is not going to be placed in operation now.

LAS:
- Not present.

UNSYS:
- All fine.

SPB:
- Issue with PP-laser affected preparations.

FXE:
- Issues with AMPHOS shutter were fixed yesterday and now it runs properly.
- Progress was done with night work.

MID:
- AGIPD detector issue is in DET hands.

HED:
- Nothing to report.

SCS:
- Pointing had issues (drift) being root cause for instabilities last night. Right now beam performance looks better than the last night, after BKR intervention.

SQS:
- All good.

SXP:
- Not present.
Entry   Notes XO Integration Meeting 25.09.2023, posted by Frederik Wolff-Fabris on 25 Sep 2023, 12:31 
General Announcement:
- Two severe power glitches happened on the weekend (SAT and SUN around 7AM). We thank all colleagues that were in shift, OCD or volunteered to help assessing the situation and restoring their operation 
ability. 
- The presentation of the Winter Maintenance planning period is postponed due to time issues.
- Janusz S. reminds on cyber security: tomorrow the next step to secure Zimbra mail client takes place. A detailed e-mail will be sent.
- XO will create a report on the power issues.

CTRL:
- Issues with power glitch: restoring parameters, Karabo, SEPS, SA2 started from scratch.

DA:
- Nothing to report; end of chain regarding the power issues.

EEE:
- Same issues with power.
- Will follow up the SCS train ID.

VAC:
- No effect on VAC; no access to SA2 then it was blind / no Karabo, but at the end was fine.
- Issue with HED and MID Monochromator - to be investigated. Access is needed today.
XPD:
- As PRC Jan thanks all people who helped to restore SA and SUN (two power glitches around 7AM); Also Desy/MKK confirmed that machines were briefly affected. EuXFEL accelerator recovered quickly.
- Consequences on SAT: 1. Power went away of whole SA3 area; 2. Tunnels mostly not affected but water cooling pumps were switched OFF (affecting also balcony rooms). 
One auxiliary pump did not turned ON and several hours later (10-11AM this was too hot) and brought down services. SA2 tunnel cooling water temperature raised but on SUN it was faster to act/recover (MKK; 
30mins).
- XGM at XTD6 went down.
- MKK does not see the temperature but only humidity. To be implemented in the coming days.
- SA2 Karabo totally down.
- Interlocks went down (EEE, D3, SRP) and had to unblock radiation alarms. A Desy mTCA crate went down and had to be manually power cycled (due to cooling water lack at balcony room).
- PP-laser in SA3 went down. SA3 experiment at SCS was cancelled at the point.

DET:
- No specific feedback for DET; shall be OK.
- Broker pile up was not fully understood. SA2 was restarted and back to normal; MID restarted yesterday and will get in touch with them.

ITDM: 
- Cooling issue: discovered by alarm (Kimon who informed MKK); it needs a better procedure to inform MKK.
- After 30 mins called from MKK saying T was going down, but due to open doors.
- Steffen H. says a report has to be done with goal oriented to avoid this in future.

XRO:
- Looking into systems: in tunnels, if power is OFF then mean cooling shall be OFF. Cameras do not work remotely (connection to servers; only one is accessible).

LAS:
- SA3 is down: problems with main amplifier;
- Checking for damage after second power glitch.

UNSYS:
- All fine.

SPB:
- Nothing to report. User got data.

FXE:
- SA1 was also affected by power glitch (interlock crashed): had to be reset by D3; AIBS went to error and be reset by DOC.m
- Prevented continued with user (lost 6+4 hours of beamtime). User went well and collected data.
- On Saturday the AMPHOS laser broke down in FXE. SRP and Management took measure to bypass. Not sure if caused by electricity. To be followed up this week.

MID:
- Nothing to report. Request: in such severe power glitches an e-mail to MID has also to be sent.

HED:
- Could recover after SA2 Karabo broke down. Recovery faster than expected.
- Continued with user program. Data was successful.

SCS:
- Stopped running experiment. 
- Interlock problem with laser helped by Pouneh (thanks!).

SQS:
- Nothing to report.

SXP:
- Challenging communication. Manuel gave phone number to PRC and will give to XO.
- Power glitch: Desy colleagues do not have access to SXP hutches.
Entry   Notes XO Integration Meeting 20.09.2023, posted by Frederik Wolff-Fabris on 20 Sep 2023, 10:04 
General Announcement:
- The access and maintenance day is taking place today. Current ZZs at the accelerator are scheduled until 10AM and then it follows the tuning for cw38 beam delivery that starts from tomorrow at 7AM. 
- Martin Doering announces that next Monday 25.09 a short presentation on the 2023 Winter Maintenance will be made in this meeting series. 
Please a representative from every group is welcome to be present. The Maintenance task list is going to be send to instrument and support groups next week.
- As PRC, Jan reports so far the week looks good. Downtime from Mond-Tue of 1:15 which is being looked today at tunnel (LINAC);
- J. Gruenert (as PRC) reminds instruments to post at least once a day a report at the Operations e-log; In addition, for SA1, it is introduced a power limit of 5W to protect CRL1 lens when operating low 
photon energies (this will be discussed with SPB/SFX).

CTRL:
- Nothing to report.

DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- Nothing to report.

XPD:
- Nothing to report;
- Reminder that forbidden XGM ranges (SPB/SFX): in SA1 the two XGMs do not have the same gas. Upstream has Kr to be able to run 5.5keV; SPB/SFX can run with 7keV at this XGM and their own on with Xe 
instead;

DET:
- Nothing to report.

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.

LAS:
- Not present.

UNSYS:
- Quad issue in SA2/cell28: ZZ is done and successfully fixed.

SPB:
- Nothing to report.

FXE:
- Drop SASE Intensity when changing photon energy from FXE side: current understanding is that in some way the phase shifters are not set properly if the wavelength change is triggered from the Karabo. 
- Wavelength changes/scans work properly when done by BKR.
- Test this afternoon from both sides (BKR and FXE) to understand and solve the issue. Possible workaround is to ask BKR to operate the undulators.

MID:
- Not present.

HED:
- Calibration for Jungfrau had problems with MyMDC starting only Thursday. Needs to discuss with DATA department on this scheduling issue.
- Status of sample stages with EEE: being further investigated.

SCS:
- Nothing to report.

SQS:
- Not present.

SXP:
- Not present.
Entry   Notes XO Integration Meeting 18.09.2023, posted by Frederik Wolff-Fabris on 18 Sep 2023, 10:01 
General Announcement:
- Differently from standard Mondays, today is a beam delivery day. The machine tuning day for cw38 takes place on Wednesday.

CTRL:
- Nothing to report.

DA:
- Quiet OCD weekend with two calls.

EEE:
- Nothing to report.

VAC:
- Friday afternoon SPB found pressure increase at SA1 solid attenuator which triggered vacuum signal. Investigation showed a bellow of one attenuator arm (arm 5; 1.2mm diamond) leaking and organized tunnel 
access;
- VAC will discuss with XRO how to monitor possible damage and possibly modify middle-layer device.  

XPD:
- Involved on Friday with XGM triggering alarm due to vacuum issue in XTD2.

DET:
- Nothing to report.

ITDM: 
- Nothing to report.

XRO:
- Nothing to add to the solid attenuator issue.

LAS:
- Nothing to report.

UNSYS:
- Nothing to report.

SPB:
- Not present.

FXE:
- Preparing for beamtime.

MID:
- Nothing to report.

HED:
- Troubles with sample stages being addressed with EEE.

SCS:
- Not present.

SQS:
- Not present.

SXP:
- Not present.
Entry   Notes XO Integration Meeting 13.09.2023, posted by Frederik Wolff-Fabris on 13 Sep 2023, 09:49 
General Announcement:
- The current week is the long delivery beam week for instruments. Operation continues up to next Wednesday 20.09 at 7AM. The DRC, PRC and RC will change as usual on Monday 18.09.

CTRL:
- Nothing to report.

DA:
- Not present.

EEE:
- Different problems with digitizers being addressed: 1. At XPD/ PES (card not working, it is then disabled); 2. FXE with jitter scene; 3. SQS is solved (undulator panel).

VAC:
- Everything good.

XPD:
- Apart of issues with PES nothing to report.

DET:
- Nothing to report.

ITDM: 
- At a retreat.

XRO:
- Nothing major to report.

LAS:
- Not present.

UNSYS:
- Not present.

SPB:
- Everything fine.

FXE:
- Not present.

MID:
- Nothing to report.

HED:
- Nothing to report.

SCS:
- Nothing to report.

SQS:
- Not present.

SXP:
- Not present.
Entry   Notes XO Integration Meeting 11.09.2023, posted by Frederik Wolff-Fabris on 11 Sep 2023, 09:47 
General Announcement:
- A Cryo issue taking place in the night Fri-SAT lead to beam not being delivered since them. The failure was at a magnetic bearing with a misreading of motor position. 
In parallel motors 3 and 4 were exchanged as preventive measure during this downtime. Cryo OK came back on Sunday afternoon and efforts are focusing in bringing machine up for cw37.

CTRL:
- Pulse on demand for FXE (main scene) will be updated today.

DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- Nothing to report.

XPD:
- Not present.

DET:
- Nothing to report.

ITDM: 
- Not present.

XRO:
- Change middle layer for the bunch patter at SA1 for fixing today.

LAS:
- Not present.

UNSYS:
- Nothing to report.

SPB:
- Nothing to report.

FXE:
- Nothing to report.

MID:
- Nothing to report.

HED:
- Between Synchronization issue and cryo failure only a total of 6-7hs of data were collected.

SCS:
- Beamtime affected by cryo failure.

SQS:
- Nothing to report.

SXP:
- Nothing to report.
Entry   Notes XO Integration Meeting 06.09.2023, posted by Frederik Wolff-Fabris on 06 Sep 2023, 10:03 
General Announcement:
-	 

CTRL:
- Issues with cameras are being addressed.

DA:
- Nothing to report.

EEE:
- Yesterday issue with SEPS/HED being investigated/addressed.

VAC:
- Not present.

XPD:
- Nothing to report.
- As PRC, Naresh K. reports 1: new SEPS interlock at HED not properly working; 2. FXE reported crosstalk from SA3 pulses being lasing at SA1; also when switching 0 pulses in SA1 the SA3 went to zero also. 

DET:
- Nothing to report.

ITDM: 
- Nothing to report.

XRO:
- Mikako M. is aware of HED SEPS issue and is helping EEE.

LAS:
- Nothing to report.

UNSYS:
- SA2/cell25 fixed (terminal replaced) and is functioning.

SPB:
- Nothing to report.

FXE:
- Crosstalk SA1/SA3.

MID:
- Not present.

HED:
- Issues with ADC fixed by EEE (rear module) - seems a recurring feature with a 1 week frequency.

SCS:
- Motors at ending station solved by DOC;
- Issue with bunch/crosstalk. 

SQS:
- Nothing to report.

SXP:
- Not present.
Entry   Notes XO Integration Meeting 04.09.2023, posted by Frederik Wolff-Fabris on 04 Sep 2023, 09:46 
General Announcement:
- Last week was a facility development week / blue week. Another cyo issue happened on Friday morning which was recovered quickly.
- As DRC, Steffen H. reminds on the Jour-Fixe today at 13:00 to instruments communicate needed data allocation; also reminds on calling DOC may have a quicker help than sending a ticket.

CTRL:
- DOOCS clone devices disappearing from topics was fixed on Friday and since then works nicely.

DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- Not present.

XPD:
- XPD involved in facility development since Friday. All activities went fine and more studies for Harmonic lasing and Aspect will be continued.
- J. Gruenert mentions for cw38 XPD and XRO colleagues are in Trieste for a conference and only limited staff is available for support. Basic functionality of devices is guaranteed.
- REXX servers were down last week. 

DET:
- Nothing to report.

ITDM: 
- Nothing to report.

XRO:
- Message to SA2 instruments: last week the Euler calibration was done for M1 and M2 and instruments can make use. The link is on the main mirror scene and the SA2 scene will be updated.

LAS:
- Nothing to report.

UNSYS:
- Issue with cell 25/SA2 terminal: undulator could not be used for harmonic lasing. Needs access for fixing.

SPB:
- Nothing to report.

FXE:
- Nothing to report.

MID:
- During the blue week it repaired the long arm for detector angular motion.

HED:
- Issues with IDC on rear module; EEE is working on it.

SCS:
- Nothing to report.

SQS:
- Nothing to report.

SXP:
- Not present.
Entry   Notes XO Integration Meeting 30.08.2023, posted by Frederik Wolff-Fabris on 30 Aug 2023, 10:55 
General Announcement:
- Facility development week is ongoing.
- After the cryo incident last weekend the machine colleagues have an impression everything is in good shape and next tuning day can be made on Monday. 
- Next UOM will have an invitation for instruments to briefly report on jitter issues (pointing, temporal, etc) that impact performance from last weeks. 
If you have found any jitter issues please mention it during the UOM for discussion with machine colleagues.

CTRL:
- Today 13:00 new version for the DOOCS devices will be deployed for undulator controls. It takes 2-3 minutes.
- Follow up of PP-ODL devices: Wajid E. will right a ticket to DOOCS colleagues.

DA:
- Nothing to report.

EEE:
- Yesterday a SA2 SEPS interlock was updated and tested with XRO group and it went fine.

VAC:
- V0 closed after the SA2 loop update which was promptly re-opened.

XPD:
- Nothing to report.

DET:
- Not present.

ITDM: 
- Upgrade of GPFS was finished yesterday successfully.

XRO:
- SEPS interlock update in SA2 worked well.
- One issue: communication to DOOCS was unstable in the early afternoon. Late on the day it was better.

LAS:
- Nothing to report. All fine.

UNSYS:
- At 15:30 a ZZ will be done to fix 3-way valve at SA2/cell4.
- Issues with MARWIN robot in SA3 and A. Leuschner will make a ZZ for fixing it.

SPB:
- Small issues on last THU and MON related to middle layer device and macros. DOC is informed and have recognized it. Further investigation in the particular macro that may can cause the issue. 

FXE:
- Preparing for next week.

MID:
- All fine at MID.

HED:
- Nothing special; preparing next experiment.

SCS:
- Nothing to report.

SQS:
- Not present.

SXP:
- Not present.
Entry   Notes XO Integration Meeting 23.08.2023, posted by Frederik Wolff-Fabris on 23 Aug 2023, 09:47 
General Announcement:
- Next Monday, 28.08 there is no XO Integration Meeting due to agenda unavailability of XO. 

CTRL:
- Nothing to report.

DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- Nothing to report.

XPD:
- Nothing to report.

DET:
- Not present.

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.

LAS:
- Nothing to report.

UNSYS:
- Tri way valve SA2 cell4 causing warm water in vacuum chamber which drifts the gap for few um. To be fixed in a shutdown.
- Cell25/SA2 feedback of temperature sensors is solved.

SPB:
- Nothing to report.

FXE:
- Nothing to report.

MID:
- Waiting for beam. Tuning under way.

HED:
- Nothing to report.

SCS:
- Nothing to report.

SQS:
- Not present.

SXP:
- Not present.
Entry   Notes XO Integration Meeting 23.08.2023, posted by Andreas Galler on 21 Aug 2023, 09:26 

General Announcement:

  •  

CTRL:

  • nothing major

DA:

  • nothing major

EEE:

  • nothing major

VAC:

  • nothing to report

XPD:

  • nothing

DET:

  • nothing major 

ITDM: 

  • nothing major

XRO:

  • nothing major

LAS:

  • nothing to report

UNSYS: 

  • nothing to major
  •  

SPB/SFX:

  • due techincal issues no beamtime

FXE:

  • not present

MID:

  • nothing to report

HED:

  • not enough intensity to pump samples
    • experiment was a partial succes

SCS:

  • nothing to report

SQS:

  • nothing to report

SXP:

  • not present

DRC

  •  

PRC

  •  
Entry   Notes XO Integration Meeting 16.08.2023, posted by Andreas Galler on 16 Aug 2023, 09:24 

General Announcement:

  •  

CTRL:

  • nothing major

DA:

  • nothing major

EEE:

  • nothing 

VAC:

  • nothing

XPD:

  • nothing 

DET:

  • nothing

ITDM: 

  • nothing

XRO:

  • nothing

LAS:

  • nothing

UNSYS: 

  • nothing

SPB/SFX:

  • Issue with Hexapod of sample changer.

FXE:

  • not present;
  • frequent error with PPODL, locked station --> investigated by CTRL (wajid)

MID:

  • Julabo chiller
    • switching off recurrenlty

HED:

  • nothing to report

SCS:

  • nothing to report

SQS:

  • nothing to report

SXP:

  • not present

DRC

  • nothing

PRC

  • nothing
Entry   Notes XO Integration Meeting 14.08.2023, posted by Andreas Galler on 14 Aug 2023, 09:30 
General Announcement:

CTRL:
- nothing to report

DA:
- Nothing to report.

EEE:
- Motor issue with SPB
PLC is investigating

VAC:
- All running fine.

XPD:
- Everything fine from XPD.

DET:
- Nothing to add.

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.

LAS:
- Nothing to report.

UNSYS:
- Everything is fine.

SPB:
- see motor issue EEE

FXE:
- nothing to report

MID:
- Julabo Chiller
    switched off by itself --> curculation stopped
    AGIPD not harmed

HED:
- nothing to report

SCS:
- Nothing to report.

SQS:
- Nothing to report

SXP:
- Nothing to report

 

 

Entry   Notes XO Integration Meeting 09.08.2023, posted by Frederik Wolff-Fabris on 09 Aug 2023, 09:43 
General Announcement:
- Starting this semester, a jitter report will be started at the UOM on the blue weeks. 
Instruments are kindly requested to make a 2-3 mins report on experience with jitter for the previous few weeks, especially in relation to instabilities with beam.

CTRL:
- Issue at HED with Jungfrau detector module2: workaround is put in please and seem to work fine. Also issue looks like to be specific only to this module / detector controller. 
Once experts return from holidays more investigation will be done.

DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- All running fine.

XPD:
- Everything fine from XPD.

DET:
- Nothing to add.

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.

LAS:
- Nothing to report.

UNSYS:
- Problem with SA3/cell9 got stuck (third time). Not clear if it is a mechanical or control system issue. Further investigation during the winter maintenance period. 
Error is currently fixed and undulator is running.

SPB:
- Nothing to report. PCS experiment is running well.

FXE:
- Nothing to report.

MID:
- All fine at MID.

HED:
- Will get in touch with CTRL to discuss Detector fix.

SCS:
- Nothing to report.

SQS:
- Not present.

SXP:
- Nothing to report.
Entry   Notes XO Integration Meeting 07.08.2023, posted by Frederik Wolff-Fabris on 07 Aug 2023, 09:50 
General Announcement:
-  A. Silenzi is the DRC for this week and will send an e-mail to instrument local contacts for the jour-fixe meeting this afternoon.

CTRL:
- Movement issue in SA3 watchdog: after splitting the system it became more stable and will monitor it for next days.
- HED reported a bug with Jungfrau and will deploy the fix today.

DA:
- Nothing to report.

EEE:
- Follow up of a problem in SQS rack room (grounding): it was corrected in Thursday and now everything is fine.

VAC:
- Nothing to report.

XPD:
- Solution from CTRL to watchdog in SA3 is working fine.

DET:
- AGIPD at SPB: the chiller for cooling electronics (not the Julabo) failed. Investigation shows that interlock worked well and further investigation to be done after replacement.
- Jungfrau module2 needs work at HED and will be followed up.

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.

LAS:
- Sunday morning issue with SA1 PP-laser that shutdown the AMPHOS. It was brought up by OCD at the same day. 
- Need to coordinate with EEE on crate work for SA2.

UNSYS:
- All fine with Undulators systems.

SPB:
- Issue with AGIPB: there is a spare to be changed and further investigations to be done.

FXE:
- Nothing to report.

MID:
- Nothing to report.

HED:
- All fine with beam last week.
- Ticket is ongoing to solve issue on Jungfrau for next week. Wajid E. says a deployment will be made this week.

SCS:
- Nothing to report.

SQS:
- Not present.

SXP:
- Nothing to report.
Entry   Notes XO Integration Meeting 02.08.2023, posted by Frederik Wolff-Fabris on 02 Aug 2023, 10:12 
General Announcement:
- Status of machine: a lot of work was done last days on laser injector and RF jitter; all seems to be OK and improvement were done. 
Concluded that electron beam shape is now Gaussian and right now SASE is being tuned. Aim is to have about 2mJ in SA1 and 1mJ in SA2 at 9keV. Beam to be handled to the instruments on Thursday morning, as 
planned.
- MID HED asked on use of HXRSS this week/next week. To be discussed at the daily Ops meeting today.

CTRL:
- Investigating the MOV loop in SA3 watchdog. 

DA:
- Nothing to report.

EEE:
- Routine checks in rack for instruments (currents for ground lines). One rack presented an issue and today there is a plan to disconnect the wrong wiring line and a second power will be installed. 
No impact shall be seen on motors using 40V at SQS.

VAC:
- Nothing to report.

XPD:
- If HED or MID goes to use seeding then N. Kujala has to setup the Hirex.

DET:
- Nothing to report.

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.

LAS:
- Progress in SA1 PP-L going well.

UNSYS:
- Error in gap of SA1 cell 10 undulator. It seems to be fine now.

SPB:
- Preparing for the shifts from tomorrow.

FXE:
- Nothing to report.

MID:
- Will discuss with HED on the using of beam for next 2-3 weeks.

HED:
- Nothing to add.

SCS:
- Nothing to report.

SQS:
- Not present.

SXP:
- Nothing to report.
Entry   Notes XO Integration Meeting 31.07.2023, posted by Andreas Galler on 02 Aug 2023, 09:27 

CTRL
    - still investigating the slowness in SA3 --> which wtachdog is repsonsible
DA:
    - not present
EEE:
    - nothing to be reported

VAC
    - nothing major to report
XPD:
    - part of slownwss in SA3 response team with CTRL

DET:
    - nothinbg major, and despite beam qualityu some calibration data could be taken
iTDM:
    - wil investagete BSASLER 2 issues

XRO:
    - nothing major
LAS:
    - SA1 AMPHOS service finsihed
    - NOPAs are being brought up

    SA3:
        - spurious switch off of seeder over the weekend, but could be brought up
        - comment on LASERMET 
UNSYS:
    - last week issue with cel9 SA3, undulator was not moving but isue solved

PRC:
    - beam was not super performing but some instruent tuning tasks could be done
    - SXP wanring light was broken and repaired on Sat
    - pointing difference between SQS and SCS leads to delays in tuning by the machine
        - the beam should be on the crosshair, and if that needed to be changed XPD can do that easily.
    - SA1 FEL imager stalled on Sunday -->

SPB/SFX:
    - beam could be used over the weekend, but only calibration constants could be taken or AGIPD

FXE:
    - nothing to report

MID:
    - beam was used and to a major fraction this was succesful

HED:
    - the planned program could be done

SCS:
    - nothing to report
SQS:
    - 
SXP:
    - PPLASER couldn't be used

Entry   Notes XO Integration meeting 26.07.2023, posted by Andreas Galler on 26 Jul 2023, 09:21 

General Announcement:

  • The injector Laser Window had been exchanged yesterday and currently leak search is ongoing. Tuning is expected to start around lunch time. 

CTRL:

  • nothing major to report

DA:

  • not present

EEE:

  • nothing mjor to report

VAC:

  • same

XPD:

  • nothing

DET:

  • nothing

ITDM: 

  • nothing

XRO:

  • nothing

LAS:

  • PPLAS in SA1 will not be ready this week
    • hopefully finished by the end of this week
      • please conatct Radu for continuous updates

UNSYS: 

  • Everything is fine

SPB/SFX:

  • Nothing to repoert ready for beam

FXE:

  • same

MID:

  • same

HED:

  • some

SCS:

  • nothing

SQS:

  • not present

SXP:

  • nothing

DRC

  • nothing

PRC

  • nothing