SASE1 Status and SASE3 Readiness
|
Technical integration and coordination logbook, Contact: A. Violante, G. Wellenreuther |
Not logged in |
|
|
Message ID: 531
Entry time: 17 Jul 2024, 09:50
|
Author: |
Frederik Wolff-Fabris |
Location: |
General |
Severity: |
Information |
Subject: |
Notes XO Integration Meeting 17.07.2024 |
|
|
General Announcement:
- Martin Doering informs today an e-mail will be sent to groups asking for tasks that are cancelled or postponed. The feedback will be required until mid of next week.
- A. Galler informs on a report for non-correct bunch arrival monitors at the instruments. It is requested to instruments to get information on this topic and bring back to XO.
- User Operation Meeting starts next Friday 19.07.
CTRL:
- Nothing to report.
DA:
- Not present.
EEE:
- Nothing to report.
VAC:
- Not present.
XPD:
- Gotthard-II in XTD6 Hirex: today the power supply will be checked and by end of the day info to XO/PRC will be done.
DET:
- SPB/SFX an issue with Jungfrau-4M high voltage power supply system happen and is broken needing a fix.
- Hirex/Gotthard-II the tests with beam is prioritized on Monday/Tuesday next week.
ITDM:
- Nothing to report.
XRO:
- On the weekend it starts the technical ramp-up of SA3 and Monday/Tuesday the SA2 and SA1;
- On Monday the SEPS interlock tests are happening and hutches will be closed.
LAS:
- Nothing to report.
- Bunch pattern server issue last week: fix was provided. No more info on the effects of it on LAS preparations.
UNSYS:
- Issue with SA3/cell18 undulator did not move and hit the limit. Under investigation.
SPB:
- Nothing to add to the Jungfrau issue.
FXE:
- Nothing to report.
MID:
- Issue with vacuum system at MID - failed yesterday twice.
HED:
- Nothing to report.
SCS:
- Yesterday problem with mechanics in tunnel; will need PLC team; Leandro Z. informs is under investigation.
SQS:
- Nothing to report.
SXP:
- Not present. |