Technical integration and coordination SASE1 Status and SASE3 Readiness
  Technical integration and coordination logbook, Contact: A. Violante, G. Wellenreuther, Page 7 of 29  Not logged in ELOG logo
Entry   Notes XO Integration Meeting 04.10.2023, posted by Frederik Wolff-Fabris on 04 Oct 2023, 09:52 
General Announcement:
- A. Galler reminds this is a facility development week and for the next UOM on Friday a report of stability/jitter shall be done by the instruments.
- Martin Doering announces the Winter maintenance period 23/24: 
Entry   Notes XO Integration Meeting 02.10.2023, posted by Frederik Wolff-Fabris on 02 Oct 2023, 09:59 
General Announcement:
-  
Entry   Notes XO Integration Meeting 27.09.2023, posted by Frederik Wolff-Fabris on 27 Sep 2023, 10:30 
General Announcement:
- The Winter Maintenance Task list will be sent to all groups in the course of today. Next Wednesday 04.10 Martin Doering will make a quick presentation
on the list itself and take questions. 
Entry   Notes XO Integration Meeting 25.09.2023, posted by Frederik Wolff-Fabris on 25 Sep 2023, 12:31 
General Announcement:
- Two severe power glitches happened on the weekend (SAT and SUN around 7AM). We thank all colleagues that were in shift, OCD or volunteered to help assessing
the situation and restoring their operation 
Entry   Notes XO Integration Meeting 20.09.2023, posted by Frederik Wolff-Fabris on 20 Sep 2023, 10:04 
General Announcement:
- The access and maintenance day is taking place today. Current ZZs at the accelerator are scheduled until 10AM and then it follows the tuning for cw38
beam delivery that starts from tomorrow at 7AM. 
Entry   Notes XO Integration Meeting 18.09.2023, posted by Frederik Wolff-Fabris on 18 Sep 2023, 10:01 
General Announcement:
- Differently from standard Mondays, today is a beam delivery day. The machine tuning day for cw38 takes place on Wednesday.
Entry   Notes XO Integration Meeting 13.09.2023, posted by Frederik Wolff-Fabris on 13 Sep 2023, 09:49 
General Announcement:
- The current week is the long delivery beam week for instruments. Operation continues up to next Wednesday 20.09 at 7AM. The DRC, PRC and RC will change
as usual on Monday 18.09.
Entry   Notes XO Integration Meeting 11.09.2023, posted by Frederik Wolff-Fabris on 11 Sep 2023, 09:47 
General Announcement:
- A Cryo issue taking place in the night Fri-SAT lead to beam not being delivered since them. The failure was at a magnetic bearing with a misreading of
motor position. 
Entry   Notes XO Integration Meeting 06.09.2023, posted by Frederik Wolff-Fabris on 06 Sep 2023, 10:03 
General Announcement:
-  
Entry   Notes XO Integration Meeting 04.09.2023, posted by Frederik Wolff-Fabris on 04 Sep 2023, 09:46 
General Announcement:
- Last week was a facility development week / blue week. Another cyo issue happened on Friday morning which was recovered quickly.
- As DRC, Steffen H. reminds on the Jour-Fixe today at 13:00 to instruments communicate needed data allocation; also reminds on calling DOC may have a
Entry   Notes XO Integration Meeting 30.08.2023, posted by Frederik Wolff-Fabris on 30 Aug 2023, 10:55 
General Announcement:
- Facility development week is ongoing.
- After the cryo incident last weekend the machine colleagues have an impression everything is in good shape and next tuning day can be made on Monday.
Entry   Notes XO Integration Meeting 23.08.2023, posted by Frederik Wolff-Fabris on 23 Aug 2023, 09:47 
General Announcement:
- Next Monday, 28.08 there is no XO Integration Meeting due to agenda unavailability of XO. 
Entry   Notes XO Integration Meeting 23.08.2023, posted by Andreas Galler on 21 Aug 2023, 09:26 
General Announcement:


 


CTRL:


nothing major


DA:
Entry   Notes XO Integration Meeting 16.08.2023, posted by Andreas Galler on 16 Aug 2023, 09:24 
General Announcement:


 


CTRL:


nothing major


DA:
Entry   Notes XO Integration Meeting 14.08.2023, posted by Andreas Galler on 14 Aug 2023, 09:30 

General Announcement:

CTRL:
- nothing to report

DA:
- Nothing to report.

EEE:
- Motor issue with SPB
PLC is investigating

VAC:
-
All running fine.

XPD:
- Everything fine from XPD.

DET:
- Nothing to add.

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.

LAS:
-
Nothing to report.

UNSYS:
- Everything is fine.

SPB:
- see motor issue EEE

FXE:
- nothing to report

MID:
- Julabo Chiller
    switched
Entry   Notes XO Integration Meeting 09.08.2023, posted by Frederik Wolff-Fabris on 09 Aug 2023, 09:43 
General Announcement:
- Starting this semester, a jitter report will be started at the UOM on the blue weeks. 
Instruments are kindly requested to make a 2-3 mins report on experience with jitter for the previous few weeks, especially in relation to instabilities
Entry   Notes XO Integration Meeting 07.08.2023, posted by Frederik Wolff-Fabris on 07 Aug 2023, 09:50 
General Announcement:
-  A. Silenzi is the DRC for this week and will send an e-mail to instrument local contacts for the jour-fixe meeting this afternoon.
Entry   Notes XO Integration Meeting 02.08.2023, posted by Frederik Wolff-Fabris on 02 Aug 2023, 10:12 
General Announcement:
- Status of machine: a lot of work was done last days on laser injector and RF jitter; all seems to be OK and improvement were done. 
Concluded that electron beam shape is now Gaussian and right now SASE is being tuned. Aim is to have about 2mJ in SA1 and 1mJ in SA2 at 9keV. Beam to be
Entry   Notes XO Integration Meeting 31.07.2023, posted by Andreas Galler on 02 Aug 2023, 09:27 
CTRL
    - still investigating the slowness in SA3 --> which wtachdog is repsonsible
DA:
Entry   Notes XO Integration meeting 26.07.2023, posted by Andreas Galler on 26 Jul 2023, 09:21 
General Announcement:


The injector Laser Window had been exchanged yesterday and currently leak search is ongoing. Tuning is expected to start around lunch
time. 


CTRL: