Group Selection Page HELP Controls Group Data Analysis Group ITDM WP76 DET Vacuum EEE WP78 WP74 FXE SCS SPB MID HED SQS SXP Sample Environment Operation PSPO XO TS Migrated2Zulip
Technical integration and coordination SASE1 Status and SASE3 Readiness
  Technical integration and coordination logbook, Contact: A. Violante, G. Wellenreuther, Page 6 of 31  Not logged in ELOG logo
Entry   Notes XO Integration Meeting 10.04.2024, posted by Andreas Galler on 10 Apr 2024, 09:26 
General Announcement:


 


CTRL:


nothing to report


DA:
Entry   Notes XO Integration Meeting 08.04.2024, posted by Andreas Galler on 08 Apr 2024, 09:27 
General Announcement:


 


CTRL:


Nothing major


DA:
Entry   Notes XO Integration Meeting 03.04.2024, posted by Andreas Galler on 03 Apr 2024, 09:28 
General Announcement:


 


CTRL:


nothing major


DA:
Entry   Notes XO Integration Meeting 27.03.2024, posted by Frederik Wolff-Fabris on 27 Mar 2024, 10:01 
General Announcement:
-  
Entry   Notes XO Integration Meeting 25.03.2024, posted by Frederik Wolff-Fabris on 25 Mar 2024, 10:24 
General Announcement:
- A power glitch happened last night around 02:50AM.
Entry   Notes XO Integration Meeting 20.03.2024, posted by Frederik Wolff-Fabris on 20 Mar 2024, 10:12 
General Announcement:
-  
Entry   Notes XO Integration Meeting 18.03.2024, posted by Frederik Wolff-Fabris on 18 Mar 2024, 09:58 
General Announcement:
- Machine is currently down due to the file system issues / controls. People are working with priority to recovery systems.
Entry   Notes XO Integration Meeting 13.03.2024, posted by Frederik Wolff-Fabris on 13 Mar 2024, 11:30 
General Announcement:
-  
Entry   Notes XO Integration Meeting 11.03.2024, posted by Frederik Wolff-Fabris on 11 Mar 2024, 10:04 
General Announcement:
- A cryo failure happened today at 09:15AM. Machine is down and shifts for today are cancelled. Experts are investigating the issue to define when to expect
ramp-up for the delivery week. Naresh K., as 
Entry   Notes XO Integration Meeting 06.03.2024, posted by Frederik Wolff-Fabris on 06 Mar 2024, 10:12 
General Announcement:
- This is a facility development week and on Friday's UOM we will get reports on recent weeks' jitter observations from the instruments. 
Entry   Notes XO Integration Meeting 04.03.2024, posted by Frederik Wolff-Fabris on 04 Mar 2024, 09:50 
General Announcement:
- A cold compressor failure happened on Friday and since Sunday early hours machine is running in good performance again.
- Pouneh S. reports that Sunday morning Amphos shutter closed and ad-hoc procedure was put in place to allow beam delivery. Investigation is ongoing.
Entry   Notes XO Integration Meeting 28.02.2024, posted by Frederik Wolff-Fabris on 28 Feb 2024, 09:41 
General Announcement:
- As PRC, Maurizio Vannoni informs that messages on the SA1 solid attenuator were sent to SPB and FXE - further info and discussions will happen offline;
Entry   Notes XO Integration Meeting 26.02.2024, posted by Frederik Wolff-Fabris on 26 Feb 2024, 09:42 
General Announcement:
-  As PRC since Sunday, Maurizio Vannoni reports the weekend had no major issues.
Entry   Notes XO Integration Meeting 21.02.2024, posted by Frederik Wolff-Fabris on 21 Feb 2024, 10:05 
General Announcement:
- The HED/HIBEF pulser will be fired today for the first time. If other groups see spurious effects on electronics please report back to XO.
Entry   Notes XO Integration Meeting 19.02.2024, posted by Frederik Wolff-Fabris on 19 Feb 2024, 09:55 
General Announcement:
- As PRC Maurizio V. mentions there is nothing particularly important to report.
Entry   Notes XO Integration Meeting 14.02.2024, posted by Frederik Wolff-Fabris on 14 Feb 2024, 12:21 
General Announcement:
-  As PRC, Maurizio Vannoni says so far everything is going well this week.
Entry   Notes XO Integration Meeting 12.02.2024, posted by Frederik Wolff-Fabris on 12 Feb 2024, 09:40 
General Announcement:
- As PRC, Andreas G. informs the week went smooth so far.
Entry   Notes XO Integration Meeting 07.02.2024, posted by Frederik Wolff-Fabris on 07 Feb 2024, 10:29 
General Announcement:
-  
Entry   Notes XO Integration Meeting 05.02.2024, posted by Frederik Wolff-Fabris on 05 Feb 2024, 09:57 
General Announcement:
-  
Entry   Notes XO Integration Meeting 31.01.2024, posted by Frederik Wolff-Fabris on 31 Jan 2024, 09:57 
General Announcement:
- Steffen Hauf informs on DAQ: the crashes on slow aggregators were reproduced in the lab. A work is being prepared to be tested at MID tomorrow or Friday.
ELOG V3.1.4-7c3fd00