Technical integration and coordination
SASE1 Status and SASE3 Readiness
|
Technical integration and coordination logbook, Contact: A. Violante, G. Wellenreuther |
Not logged in |
 |
|
Message ID: 557
Entry time: 16 Oct 2024, 09:57
|
Author: |
Frederik Wolff-Fabris |
Location: |
General |
Severity: |
Information |
Subject: |
Notes XO Integration Meeting 16.10.2024 |
|
|
General Announcement:
- Reminder that Nov. 1st is the deadline for submitting the Winter Maintenance task list to XO.
- As PRC, Maurizio Vannoni says no issues are currently happening.
CTRL:
- Nothing to report.
DA:
- Nothing to report.
EEE:
- Nothing to report.
VAC:
- VAC OCD got a call from SQS related to the GATT: interlock is on the limit of reaction at higher operational pressure. Under adjustment.
XPD:
- Yesterday problem with HIREX SA2 Gotthard shutter which did not closed completely: HIREX can still be operated and issue is under investigation.
DET:
- Issue with AGIPD at MID seems to have a hardware problem that will require intervention during the winter maintenance. Still under investigation to make a final plan for repair.
ITDM:
- Nothing to report.
XRO:
- Nothing to report.
LAS:
- Nothing to report.
UNSYS:
- Apple-X studies during the blue week: problem with PS in cell26 showing strange behavior with limit switches always activated. A ZZ access is needed.
SPB:
- Nothing to report.
FXE:
- Nothing to report.
MID:
- Nothing to report in addition to the detector.
HED:
- Nothing to report.
SCS:
- Not present.
SQS:
- Not present.
SXP:
- KB commissioning last days: it had a hardware problem and machine was at times not stable but good process was achieved. |