Group Selection Page HELP DOC Controls Group Data Analysis Group ITDM WP76 DET Vacuum XRO EEE WP78 WP74 FXE SCS SPB MID HED SQS SXP Sample Environment Photon Commissioning Team Operation PSPO XO TS
Technical integration and coordination SASE1 Status and SASE3 Readiness
  Technical integration and coordination logbook, Contact: A. Violante, G. Wellenreuther  Not logged in ELOG logo
Message ID: 546     Entry time: 09 Sep 2024, 09:38
Author: Frederik Wolff-Fabris 
Location: General 
Severity: Information 
Subject: Notes XO Integration Meeting 09.09.2024 
General Announcement:
- A. Galler informs a downtime of about 30min happened this morning in the North Branch due to a faulty vacuum controller.
- H. Sinn mentions on the beam drift in SA1: it was seen in both instruments over the weekend and is likely the comes from M1 but can be corrected by feedbacks in M2 and M3; 
drift does not slowdown and together with XRO it will be looked if corrections on M1 can be applied tomorrow.

CTRL:
- Nothing to report.

DA:
- Nothing to report.

EEE:
- A motor in FXE attenuator had an issue on Saturday; it seems issue with encoders and to be further investigated.

VAC:
- Last week was quiet;
- Issue with ion pump controller behaving strangely; to be exchanged tomorrow. System is recovered and can run until tomorrow.

XPD:
- Nothing to report.

DET:
- Nothing major to report; no news on SPB AGIPD chiller.

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.

LAS:
- Nothing to report.

UNSYS:
- Issue with cell26/SA1 showing error in gap was fixed.

SPB:
- Nothing to report.

FXE:
- Beam drift was seen at FXE; it is communicated to PRC and XRO.
- Feedbacks for M2 and M3 manage to correct the beam drift.

MID:
- Nothing to report.

HED:
- Nothing to report.

SCS:
- Not present.

SQS:
- Nothing to report.

SXP:
- Not present.
ELOG V3.1.4-7c3fd00